CAPITAL CONSTRUCTION QUARTERLY ACTIVITY E
` Upgrade, Renovate, Improve or Expand Research Labs (Fit·up 4th & 5th Floor CoP)
Prolect Number 2314.00
Project oesmprrem S¤¤i>¤r $28.000.000 .
The Biological / Phamaceutical Complex is a new 286,000 s.f. academic / research building for the University of -
Kentucky College of Pharmacy. The Fourth and Fifth Floor Fit·Out items for the building include miscellaneous metals -
and stairs, rough and finish carpentry, wall systems, flooring systems, ceiling systems, doors, frames, hardware, ,
coatings, specialized equipment, plumbing systems, fire protection systems, mechanical systems, electrical systems and
communications and controls systems. Food Service Fit·out items include rough and finish carpentry, wall systems,
flooring systems, ceiling systems, frames, hardware, coatings, plumbing systems, fire protection systems, mechanical
systems, electrical systems and communications and control systems. Audlo—vlsuaI llt—up Includes wlring, sound
systems, video systems and control systems.
Consultant: EOP Architects C
cqntr·a¤t# A10112Q Original Contract Amount: $898,640
Total Amendments to Date: 1 Cumulative Amendment Amount $17,800
Describe all amendments : Revised Contract Amount: $916,440
Amendment 1, 12/16/11, an increase of $17,800 was approved for additional design services as required to
Incorporate additional emergency power feeds to support the implementation of the NMR within the basement of
the new building.
Contractor: ll/lesser Construction Co.
Contract# 4500039714 . Original Contract Amount: $19,192,726
Total Change Orders to Date: 58 Cumulative Change Order Amount: $714,669
Low Bid: Revised Contract Amount: $19,907,395
High Bid: Contract Percent Complete: 99%
Number of Bids:
Describe all change orders greater than $25,000.00:
Change 0rder# 1, 9/17/10, was approved for an increase of $25,705.13 to assign lvlultb/ista under Nlessers contract to
provide construction documentation for the entire project to include project documentation (photo sets) with Progression
and Detailed Sets, preconstruction site survey and slideshows. Change Order if 30, B/18/11 was approved for an
increase of $88,193 to install the video/media wall capable of providing full—screen playback from either the Alcorn
McBride video player or the Contemporary Research HDTV cable tuner. Change Order # 33, 9/23/11 was approved for
an Increase of $141 ,546 to provide changes Io labs 596 & 576, support rooms 594A, 574B and 574A required to support
the particular needs of a new researchers research. Change Order all 38, 10/5/11, was approved for an Increase of
$69,999 to provide all site work atthe west elevation and previously not installed landscape due to 4th and 5th
floor staging area. Change Order # 42, 1016/11, was approved for an increase of $26,075 to add HVAC ductwork
to stair N. Change Order #44, 11/3/11, was approved for an increase of $29,604 to provide plantings and
landscaping in front of KMSF where new steam piping ls installed. `