CAPITAL CONSTRUCTION QUARTERLY ACTIVITY
Renovate Hospital Nursing Unit - Hospital (NICU)
Project Number: 2265.00 Project Description: Scope:    $1,449,000
The project is for renovation of the existing nursing units in the University Hospital to upgrade the facilities to provide better care with newer space and technology. The existing nursing units are outdated and need upgrading to better serve our patients. The project provides for the renovation of the Third floor CCC Nursery area. The renovated space will provide for the relocation of the Newborn Nursery and for the installation of (8) level II NICU beds and (8) level 111 NICU beds. The Project will involve the relocation of walls, Med gas headwalls, utilities, etc. and systems to make these functions operational.
Consultant: Stengel-Hill Architecture
Contract* A081070 Total Amendments to Date: Describe all amendments : No amendments this quarter.
Original Contract Amount: Cumulative Amendment Amount: Revised Contract Amount:
$90,955
$90,955
Contractor: The Wagner Co. Contract* 4500017309 Total Change Orders to Date: 1 Low Bid: $800,440 High Bid: $1,000,923 Number of Bids: 5
Describe all change orders greater than $25,000.00: No change orders greater than $25,000 this quarter.
Original Contract Amount Cumulative Change Order Amount Revised Contract Amount Contract Percent Complete
$800,440 $1,380 $801,820 55%
Renovate M.I. King Library
Project Number: 2270.00 Project Description: Scope: $2,250,000
Renovate the 2nd and 3rd floors of the M. I. King Library, 1962 Addition, to accommodate the relocation of the Chemistry Library, Physics Library and a computer lab, ail currently housed in the Chemistry-Physics Building. The Math Library, currently housed in the lower level of the Patterson Office Tower, will be included as well. The majority of the renovation will occur on the 3rd floor of the M. I. King Library, with a smaller area on the 2nd floor and minor work on the 4th floor. An existing elevator, located inside the south entrance vestibule, is to be replaced with new components within the existing elevator shaft. All staff areas to include hard wired computer outlets and wireless capability to be provided in addition to the hard-wired throughout.
Consultant: Pearson & Peters
Contract* A081090 Total Amendments to Date: Describe all amendments : No amendments this quarter.
Original Contract Amount: Cumulative Amendment Amount: Revised Contract Amount:
$106,700
$106,700
Contractor: No construction contract awarded to date. Contract #
Total Change Orders to Date: Low Bid: High Bid: Number of Bids:
Describe all change orders greater than $25,000.00:
Original Contract Amount: Cumulative Change Order Amount: Revised Contract Amount: Contract Percent Complete:
15