4.



     Concrete floor in hall, 480 sq. ft. at .30 .... $144.00
     Concrete floor in roams, 1050 so. flt. at 30 ..      315.00
     .Wiater proofing walls, stripping and plastering
        166 sa. yds. at $2.00   .     ........................ 332.00
     Plaster patching in hall                             48.00
     Ceiling plas;;er patching ........................    40.00
     Repairing window sills.                               85.00
     Viring and lighting fixtures ..9......               10.00
                           Total.          .i           ,054.00

     The plumbing for the laboratory tables in this building is in
bad shape.   It can, by constant patching, last thru this year.    At
least $$1,500 will have to be spent on this work next sumner if it is
continued as a chemistry building.   All the floors are very poor.
Vwindow frames are badly decayed and thoro repairing of the whole
building is imperati-.-.,  The wiring is dangerous and should be put
in conduit.   The enti+_, bui'.ding could be put in good shape for
$6,ooo.   This allows for the installation of a good toilet room.
If toilet rooms for both men and women are installed the cost would
be $6,800.

     Neville Hall.   Roof over dispensary requires entire reslating.
The estimate is $150.   Loose brick on roof have been removed.

     Science Building.   Rooms for Department of Journalism have been
finished off in the basement.   Estimate for general interior varnish-
ing and redecorating is $960.

     Heating Plant.   Boiler settings have had all necessary repairs
made.   Grates for one boiler are now being cast at the University
foundry.   Grates for other boiler have been bought from the Lexing-.
ton Engine and Boiler Works.

     LibrarV.   No work done in this building.    New- stacks ordered,
have not been reoeived.

     Mechanical Hall.   Estimate for exterior painting is $980.   New
window sills, joints, etc., required, will cost $250.    Roof over
foundry has been renewed, all other roofs patched and some metal work
repaired.   The cost was $1,368.55.    $1,000 was budgeted for this
work.   Addition work costing $60o should be done.    No work has been
done that wea s not absolutely necessary.

     G3ining Building.  Estimate for interior painting $540.    Ga's
heaters have been removed.   Attic door has had a lock put on it.
Floorin g of attic for a storeroom will cost $220.   Departmental ma-
terial stored in various parts of building has not been cleared out.