Project #85 District 4: Construction of concrete driveway at Eastern State Teachers' College, Richmond, KY. The work on this project includes 900 lineal feet of 6 inch concrete pavement 30 feet wide with 6 inch curbs, 827 lineal feet of 6 inch concrete pavement 26 feet wide with 6 inch curbs, 50 lineal feet of 7 inch concrete pavement 26 feet wide with 6 inch curbs. The present bituminous pavement will be removed and the salvaged material used for repairing other campus driveways. Preparing subgrade and setting forms for curb and one half roadway, 1935

Part of Goodman-Paxton Photographic Collection, 1934-1942