2.



care of not less than 3,200 atutdenta in 3.930.  Despite the fact
that students wrere turned away the present aiae is crowd-
ing the facilities and placing heavy burdens upon instructors
to meet the demand for instruction.   Additional numbers Si~-
out increased teaching staff and more room must affect detri-
mentally the work of the University.   It appears then if these
figures can be relied upon Fh-at the University must look forward
to doubling of plant and facilities in the next ten years.

     11(b) What this Means.  In order to visualize the University's
needs I have drawn up a list of buildings and equipment that is
required.  It must be taken for granted that such a group of
buildings could not be constructed in a short space of time, but
it is essential that a start should be made at an early date.
The list of equipment suggested p.rtly by Mr. rady-is's follovs:



Central heating and lighting plant ...........
Two! new dormitories for women ...............
Gymnasium for women.
Three new dormitories for men (making total
     of four) ................................
New Arts and Science building (replacing
     Neville Sall and old chemistry building
     and giving old science hall to College
     of LawO)        .......
Steam and Hydraulics Laboratory (do not have
     any now) ................................
New blacksmith shop and foundry (old one
     practically wurn out and oompletbely but
     of date and too small).        ..........
Gymnasium and concrete stadium (have no
     stadium now and old gymnasium utterly in-
     adequate and worn out).
Remodel old gymnasium for other use ..........
Armory (do not have any now) .................
Buy all Negro property adjacent to campus ....
Commons building .............................
Complete Riastlc Mall.
Complete Agricultural building ..............
Domestic Science building .....................
Social Sciences building ....................
Biological Sciences building.
Physics building .............................
Enlarge Library .
A.grioultural engineering building and
     equipment ...............................
Remodel old buildings.
Museum .......................................



$400,000. 00
300,0003.00
200,000.00

400,000.00



500,000.00

300,000.00


100,000.00


500,000.00
  50j,000.00
  350,000.00
  50,000.00
  100, 000.00
  100,000.00
  100,.000 .00
  100,000.00
  1.50,000. 00
  150,000.00
  150,000.00
  109,000.00

  200,000.00
  2.00,000,00
  100,000.00