xt75x63b0684 https://exploreuk.uky.edu/dips/xt75x63b0684/data/mets.xml Lexington, Kentucky University of Kentucky 19640420 minutes English University of Kentucky Contact the Special Collections Research Center for information regarding rights and use of this collection. Minutes of the University of Kentucky Board of Trustees Minutes of the University of Kentucky Board of Trustees, 1964-04-mar20-ec. text Minutes of the University of Kentucky Board of Trustees, 1964-04-mar20-ec. 1964 2011 true xt75x63b0684 section xt75x63b0684 Minutes of the Meeting of the Executive Committee of the Board of Trustees of the University of Kentucky, March 20, 1964. The Executive Committee of the Board of Trustees of the University of Kentucky met in the Board of Directors Room of the Alumni House on the campus of the University at 1:00 p.m. , Eastern Standard Time, on Friday, March 20, 1964, with the following members present: Dr. Ralph Angelucci, chairman, Judge James A. Sutherland, secretary, Mr. Robert Hillenneyer, Dr. H. B. Murray, and Mr. Smith Broadbent. President John Oswald, Mr. Robert Ker- ley, Dr. Robert D. Haun, representing the administrative staff of the University, and members of the press were also present. A. Meeting Opened Dr. Angelucci, having determined that a quorum was present, called the meeting to order at 1:00 p.m. B. Minutes Approved On motion by Mr. Hillenmeyer, seconded by Mr. Broadbent, and duly carried, the Minutes of the February 21 meet'ing of the Executive Commit- tee, and of the Special Meeting on February 27, 1964, were approved as pub- lished. C. President's Report to the Trustees The chairman called upon Dr. Oswald for his Report to the Trustees, copies of which were made available. Dr. Oswald commented on each item contained in the report and the Trustees accepted the report with an expression of appreciation for the many and varied activities being carried on by members of the faculty and staff of the University. D. Presentation of "Blue Report" Dr. Oswald indicated that copies of the "Blue Report" had already been mailed to members of the Executive Committee so that they might be familiar with the important but routine matters contained therein. He recom- mended that unless the members wished to raise specific questions, which he would be glad to answer, that the report be accepted as a whole and made a part of the official record of the meeting. Mr. Hillenmeyer moved that the report be accepted and made a part of the Minutes of the meeting. His motion was seconded by Mr. Broadbent and carried. 2 RECOMMENDATIONS OF THE PRESIDENT FINANCIAL REPORT Recommendation: that the financial report covering the eight month period ended February 29, 1964, be accepted as presented and made a part of the record of the March 20, 1964, meeting of the Executive Committee of the Board of Trustees. Background: The letter of transmittal from Mr. Clay Maupin is self-explanatory and indicates that the University is operating on a sound financial basis. UNIVERSITY OF KENTUCKY A LEXINGTON March 5, 1964 Dr. John W. Oswald, President University of Kentucky Lexington Kentucky Dear Dr. Oswald: Submitted herewith is the interim financial report of the University of Kentucky for the fiscal period which began July 1, 1963 and ended February 29, 1964. This report consists of a balance sheet for the five balanced fund groups and supporting information concerning operation of the University. The statement of General Fund income for the eight month period reflects that 88. O9c of anticipated income was realized. For the same period the General Fund expenditures and encumbrances amounted to 66. 4% of the estimated expenditures for the fiscal year 1963-64. It is intended that this report will serve as a comprehensive and permanent record of the financial operations of the University for the information and reference of all interested persons. Respectfully submitted, Clay Maupin Director of Accounting and Budgetary Control rt University of Kentucky- Balance Sheet February 29, 1964 ASSETS I Current Funds: A. General- Cash in Bank Available Balance, State Appropriations Cash on Deposit with State Treasurer Inventories Accounts Receivable ( Net ) - Hospital Unrealized Income Total General B. Restricted- Cash in Bank Petty Cash Advances Investments Accounts Receivable ( Net ) Professional Service Plans Total Restricted Total Current Funds II Loan Funds: Cash in Bank Notes Receivable Due from Federal Government Investments Due from- United Student Aid Fund $ 777,453M09 4,603,512.03 3,337, 237.38 1,096, 128.71 933,845.43 3,426,578.74 $ 14, 174, 755. 38 $ 2,379,099.44 38, 225.61 4,164, 376.43 319,067.66 6, 900, 769. 14 $ 21,075,524.52 $ 29, 232.82 1,021, 258.21 661.34 186,500.00 1,000.00 Total Loan Funds $ 1,238,652.37 -1- University of Kentucky Balance Sheet February 29, 1964 LIABILITIES AND FUND BALANCES I Current Funds: A. General- Reserve for Encumbrances Reserve for Inventories Appropriation Balances Unappropriated Surplus: Division of Colleges Medical Center Agricultural Experiment Station $ 293,998.32 532,996.74 32, 936. 42 Total General B. Restricted- Outstanding Check Liability Reserve for Accounts Receivable Restricted Fund Balances $ 14, 174, 755. 38 $ 18,754.41 319,067.66 6, 562,947.07 Total Res-ricted Total Current Funds Loan Funds: Principal Balan ces- National Defense Education Act, 1958: Federal Government $ Univers ity Accum. Interest Income NDEA Total National Defense Education Act Principal $ University Student Loan Funds University Special Student Loan Funds United Student Aid Loan Fund Expendable Balances 6, 900, 769. 14 $ 21, 075, 524.52 861, 799. 22 95, 755. 45 5, 908. 59 963, 463. 26 214, 244. 55 44, 122. 97 1, 000. 00 $ 1,222,830.78 15, 821.59 Total Loan Funds $ 1, 238 652.37 , ".. $ 2, 154, 1, 096, 10, 064, 283.43 128. 71 411.76 859, 91. 48 University of KentucKy Balance Sheet February 29, 1964 ASSETS III Endowment Funds: Cash in Bank Cash on Deposit with Trustee Investments $ 24, 492. 95 32. 97 329, 985. 37 Total Endowment Funds IV. Plant Funds-.. A. Unexpended Plant Funds- Cash on Deposit with State Treasurer Available Balance, State Appropriations Investments $ 2,524,840.87 2,714,982.74 5, 706, 536. 56 Total Unexpended Plant Funds B. Retirement of Indebtedness Funds- Cash in Bank- Due State Treasurer Cash on Deposit with State Treasurer Cash on Deposit with Trustees Investments Unrealized Income Total Retirement of Indebtedness Funds C. Invested in Plant- Land Buildings Equipment Construction in Progress $ 10, 946, 360. 17 $ 11, 385, 00 533, 758. 91 604,295.67 1, 282, 556. 88 42,850.80 2, 474, 847.26 $ 3,989,744.96 73, 350, 532. 00 18, 297, 326. 00 11, 27 7, 549. 44 Total Invested in Plant Total Plant Funds V. Agency Funds: Cash in Bank Investments 106,915, 152.40 $ 522.92 12, 199. 77 Total Aency Funds $120, 336, 350. 83 $ 12,722.69 $ 354,511.2-9 University of Kentucky Balance Sheet February 29, 1964 LIABILITIES AND FUND BALANCES III Endowment Funds: Principal Balances Expendable Balances $ 339,209.46 15,301.83 Total Endowment Funds $ 354,511.29 IV Plant Funds: A. Unexpended Plant Funds- Reserve for Encumbrances Appropriation Balances $ 5,098,791.20 5, 847,568.97 Total Unexpended Plant Funds B. Retirement of Indebtedness Funds - Fund Balances $ 2, 474, 847. 26 Tota.l Retirement of Indebtedness Funds C. Invested in Plant- Bonds Payable Due to Other Governmental Units Net Investment in Plant Total Invested in Plant Total Plant Funds V. Agency Funds: Agency Fund Balances $ 10, 946,360. 17 2, 474, 847. 26 $ 31, 390,500. 00 886,036.00 '74, 638, 616. 40 106, 915, 152.40 $ 12, 722. 69 Total Agency Funds $ 120, 336, 359. 83 $ 12,722.69 -.4 - Universitv of Kentucky Statement of GeneraI Fund Income For the Current Fiscal Period Which Began July 1, 1963 and Ended February 29, 1964 Educational and General: A. Student Fees- Incidental Fees and Tuition Training School Fees Evening Class Fees Extension Class Fees Home Study Fees Total Student Fees B. State Appropriations - Division of Colleges Medical Center Geological Projects Agricultural Experiment Station Agricultural Extension Service Total State Appropriations C. Federal Grants - Division of Colleges Agricultural Experiment Station Agricultural Extension Service Total Federal Grants D. Endowment Income- E. Sales and Services of Educational Departments - Division of Colleges Agricultural Experiment Station Total Sales and Services of Educational Departments Total Educational and General Service Enterprises: Post Office III University Hospital: Total General Fund Income GENERAL FUND INCOME Estimated Realized Unrealized $ 2. 184,499.00 $ 1, 957, 739. 42 $ 226,759.58 17, 1)00.00 13, 124. 00 3, 976. 00 51, 000. 00 57, 842. 75 ( 6, 842. 75) 30, 800. 00 24, 466.65 6, 333. 35 73,600.00 34, 938.05 38, 661. 95 $ 2, 356, 999. 00 $ 2,088, 110. 87 $ 268, 888. 13 $ 10, 258, 000.00 $ 9,480,980.00 $ 777,020.00 7,050,000.00 5,530,000.00 1,520,000.00 640,000.00 604,750.00 35,250.00 1, 425,000.00 1, 317, 627.00 107,373.00 1, 615,000. 00 1, 493, 393. 00 121, 607. 00 $20, 988,000.00 $ 18, 426, 750. 00 $ 2, 561, 250. 00 $ 303,07i1,00 $ 260,452.05 $ 42,618.95 1,02?,054.00 851,138.00 176,916.00 2, 278, 44 44.' 1,811,139.47 467,305.00 t3? 609, 5t 9. +4, $ 2, 922, 729. 52 $ 686, 839. 95 $ -to,00.00 UO j6 6 2. 35 $ 1, 237. 65 $ 31,500.00 $ 61,123.44 $ ( 29, 623. 44) 700,000.O0 536,502.80 163,497.20 $ ' 31, 50 0,00 $ 597, 626. 24 $ 133, 873.76 $ 2, 26,068. 47 $ 24,073, 978. 98 $ 3, 652,089. 49 $ 3,500.00 $ 5,837.09 $ ( 337Q9)1 - _8238,-2`0.00 $ 1,063,443.66 $ ( 225, 173. 66) $8, -69, 338a 47 $25, 143 259.73 $ 3, 426, 578.74 1. Realized in Excess of Estimate *,5-, University of Kentu ky Statement of Current Ge!:eral Fu~i:c Expenditures For the Current Fiscal Period Which Began July 1, 1963 aP-,d Ended February 29, 1964 Encumbrances I. Educational and General: A. General Administrative Offices - B. General Expense - Student Services Staff Welfare General Institutional Services Total General Expense C. Instruction and Departmental Research College of- Agr. and Home Ec. Arts and Sciences Commerce Dentistry Education Engineering Law Medicine Nursing Pharmacy Graduate School Extended Programs House Staff Total Instruction and Departmental Research D. Activities Relating to Educational Departments - E. Organized Research-- University Research Agricultural Experimer Station Total Organized Research Unencumbered Appropria-ion Expengditu-res Outstanding Balance $ 548, l52. 83 $ 253, 071. 22 $ 9, 031. 30 $ 286, 050. 31 $ 632, 679. 36 $ 415, 6 12.3 3 $ 7, 332. 89 $ 209, 733. 84 360, 000.00 196, 124. 42 163, 875.58 726, 679.64 515, 305. 12 45, 984. 37 165, 390. 15 $ 1,719, 359. 00 $ 1, 127, 042. 17 $ 53, 317. 26 $ 538, 999. 57 $ 575, 120. 26 $ 355, 336. 31 $ 12, 707. 81 $ 207,076.14 3, 607, 266.49 2, 197, 340. 30 89, 775.03 1l 320, 151. 16 394,401.3? 245, 635.30 3,933.53 144, 832.54 515,037.99 314, 140.65, 10,936.48 189, 960. 86 816, 0 9 993 489, 9V4. 02 14,982.32 311,113.59 914, 8'70. 91 551, 090. 19 34,190.41 329,590.31 200, 266.64 12$, 75, 6C0 2, 076. 99 72,431.05 2,664,738.69 1, 6 12, 79. 17 5,119,16 1,026,840.36 256, 870. 20 lY ^', 0( 9. 'f6 1, 196. 43 98,594.01 17?'7, 2 21 . 75 100, i89 66 8, 021. 83 68, 710. '6 39, 220. 00 'A, 1 '. 9'7 481, 95 14,096.02 825, '2.82 3;.7 ; X t)e Ri 1, 1,2562. 14 340,965.8S5 222, 525. 25 143, 283. 92 79, 241. 33 $11,208,_9 3 30 $ 6, 790, 4. C. $ 214, 6S0. 0 $ 4, 20,', 03.54 $ 76, 015t.00J 414, 0,59. $ 4,48S.00 $ 467. 23 $ 366, 06 0 4$ 22, 51 9 27 $ 5 2g, 5 1 2, 7 6 $ 91,595, 81 it 3, 283, 054. 00 1I 0 98 ` 092. 60 '06,. 524, 63 1, 248, 435. 7'7 $ 3,649, '60, 84$ 2, 0)50, 6915/ $ 259, 037. 39 $ 1,340, 031. 58 University of Kentucky Statement of Current General Furd Expenditures For the Current Fiscal Period Which Begai July 1, 1963 and Ended February 29, 1964 Encumbrances F. Extension and Public Services - Univ. Ext. and Public Services Agr. Extension ServicE Total Extension and Public Services G. Libraries- H. Operation and Maintenaw of Physical Plant - Total Educational and General 11 Service Enterprises: Post Office Medical Center Total Service Enterprises III University Hospital: IV Student Aid: V Working Capital VI Clearing Accounts: VII Debt Service- Bonds Retired: VIII Debt Service-Reserve: Total Departmental Appropriations 1. Deficit 2. Negative Figure Unencumbered Appropriation Expenditures Outstanding Balance $ 1, 151, 708. 34$ 480,666.14 $ 479, 974.08 $ 191,068.12 3,893,479.47 2,565,423. 30 21,756.00 1, 306,300. 17 $ 5,045,187.81$ 3,046,089.44 $ 501,730.08 $ 1,497,368. 29 $ 832,072.49$ 551, 498.00 $ 23,215.27 $ 257,359.22 Lce $ 2,740 ,589. 00$ 1, 650, 147?. 32 $ 330,153.45 $ 760,288.23 $25,820,069.27 $15,513,248.47 $ 1,395,652.83 $ 8,911,167.97 $ 50,626.00 $ 29,502.21 $ 265.60 $ 20,858.19 103, 336.51 74, 375.62 12, 161.18 16, 799.71 $ 153,962.51 $ 10', 877.83 $ 12,426.78 $ 37,657.90 $ 3,487,454.00$ 2,027,044.3'7 $ 319,617.04 $ 1, 140,792.59 $ 13,800.00 $ 6, 160.00 $ $ 7,340.00 $ 90, 000. 00 $ 9 , 48. 71 251,549.91 $ ( 63, 901. 21) $ 69,505.04$ 25,907.35 $ 12,243.18 $ 31,354. 51 $ 229,000.00$ 229,000.00 $ $ $ 130,440.62$ 130, 440,62' $ ,__ F29g 994,231 44$ 17,938,329.94 $ 1,991,489. 74 $ 10,064,411. '76 1 University of Kentucky Statement of Plant Fund Expenditures For the Current Fispal Period Which Began July 1, 1963 and Ended February 29, 1964 Construction of Buildings A Consol. Edfw. Bldg. Bond Proceeds-Chemistry and Physics Building $ Women's Dorm Architectural Senrices Consol. Educ. Bldg. Bond' Proceeds- M. King Library I Addition to Student Union Bldg. 1 Cmommerc&e Building 2, 2 Elizabethtown Extension Center Addition to College of Law Med. Sch. Plans and Specif. Medical Science Building Medical Center Hospital Outpatient Clinic Medical Center Landscaping Medical School Dental Wing Agricultural Research Center 2 Feltner 4-H Camp Agricultural Research Center Audi' rium Swine Farrowing and Testing Station Horticultural Shed Beef Seviwce Facilities Office and Service Building- Quicksa'id Swine Farr-rowing Barn- Coldstream Sheep--Bar:.n Colds-,ream Agr. Research Cen.ter- 4 Greenhouses and Hleadhause Delta Gamma Sorority 2 Pre-s - -urg Community College 1, 0 Somerset Community College Hazard-Blackey Community College Hopkinsville Community College Sigma Alpla Epsilon 1 Zeta Beta Tau Sigma Nu Fraternity House 1 UK College of Engineering Add-tion Coillege of Education 2, 8 Parkinig Area Clifton Avenue New Do-rm Complex Phi Kappa Tau Fraternity UK Med. Center Laundry Building G'raLi and Feed Storage )ropriations Expenditurps 52, 032. 10 $ 2, 785. 94 56, 974. 11 123, 444.53 207,;999. 89 13, 248. 56 11, 153, 00 722. 30 19,527.33 80, 181.34 4, 728. 01 589.78 30, 782.40 26, 061. 07 25, 109.00 17, 800. 00 941.57 2, 493. 01 4,513. 46 593. 00 201. 01 88, 25, 53, 26, 7 33.4-' 459. 55 288. 61 200, 00 1, 000. 00 1, 000. 00 92, 172. 00 42. 00 94, 774. 00 5, 765. 00 54,539.75 8, 411. 25 84, 002. 50 10, 125. 00 1.00 93, 800G 00 Encumbrances Outstandinz Unencumbered Balance $ 49,252.08 $ 2,780.02 2, 785. 94 4, 874. 59 35, 102. 36 55, 186.53 88. 85 2,683.79 52, 764.08 8,763.80 16, 201.95 1,500.00 588.79 260.02 4, 160. 15 108,462.53 393. 43 2,493. 01 820. 90 593. 00 201. 01 78,377. 42 155, 833.35 310, 327. 35 25, 498. 81 41,019.55 5, -60. 87 310, 7123. 90 3,068. 78 3,525.50 8,923. 24 24, 896. 88 661, 273.15 1,000.00 149, 415. 73 35,578.09 2, 144,049.56 2,953.39) 9, 653.00 133.51 19,527.33 79, 921. 32 567. 86 589. 78 122, 231.02 26,061.07 25,109.00 17,800.00 548. 14 le 7. 06 1,432. 81 44, 729. 32 81,688.11 25, 200. 00 1, 000. 00 1,000.00 161, 148.36 5,524.83 42.00 149,269.41 4,48 ,.04 4. 13 898, 375.07 1,645,440.78 8,411.25 79,988.76 944.96 10,125.00 1.00 93,800.00 1. Def i . I University of Kentucky Statement of Plant Fund Expenditures For the Current Fiscal Period Which Began July 1, 1963 and Ended February 29, 1964 Const-ruction of Buildings Appropriations Expenditures Encumbrances Outstanding Unencumbered Balance Tobacco Barns-Ag. Engineering $ Horse Nutrition Barn Bull Test Shed Quicksand Dean of Ag. Residence Small Beef Shed Pathology Barn 14 Stalls Horticulture Bldg. -South Farm Swine Headquarters Building Decorating Consul'ihog- Student Union Building University Entrance Main Campus Dairy Center Total Construction of Buildings 10, 000. 00 36, 000. 00 10, 000. 00 1, 090. 00 6, 000. 00 22, 000.00 20, 000. 00 30, 000. 00 1, 672.56 37. 00 $ 457. 62 $ 515.16 $ 1, 090. 00 58,000.00 9, 027. 22 36, 000. 00 10, 000.00 6,000.00 ( 36,000.00) 1 20,000.00 30,000.00 1, 672. 56 37. 00 228,995.05 104, 530.27 121,630.36 2, 834.42 8, 186, 990. 15 $ 1, 140, 900. 10 $ 2, 413, 184.08 $ 4, 632,905. 97 Renovation and Improvements of Buildings Repairs to Coldstream $ HortIcultural Greenhouse Coidstream Beef Barn Convert Sheep Building- Pesticide Building Repair and Remodel Buildings- Colds 'raan Agr. Eng-r. Building Ren~ovratio:on of House-Quicksand Pence and Kastle Halls Tile Roof Deok Fu;nkhouser Bldg. Isolation Barr Repair A nimal Pathlology Barn Repa'-r Roof and Barn-- Dairy Repairs to Memorial Coliseum Renovation of Adm. Building Med'.-il Center Cli.nical Laboratory Storage Building Ag. Engineering Remodel Ag. Exp. Station Building Reyniolds Warehouse-Roof Repair StDorge Shead, Poultry Me,'al Storage Seed Swine Area Replaceynert Stied Pathology Plastic Gre-r-lbouses Repair Bar.1s Nutlrition 31, 314.76 249.33 1, 208.54 865.73 1, 402. 12 2, 140. 86 2, 28 0.4 14, 975. 00 28.00 7, 211. 77 3, 184.59 2, 169. 20 1, 750. 00 72, 342. 84 13, 000.00 8,000. "O 3, 800. 00 15, 322. 84 7, 500. 00 8,000.00 7, S00. 00 7, 800. CO 1, 000. 00 $ 7,013.84 $ 1, 820.93 $ 24,300.92 249.333 ( 612. 39) 1 865. 73 766. 72 13, 463. 14 945. 26 600. 00 620. 95 1, 600.00 69, 198. 00 15,000. 00 1, 201.23 3, 745. 68 1, 356. 94 121. 48 625. 40 2, 140. 86 2, 280.54 1,511.86 c8. 00 5,666.51 3, 184. 59 1,548. 25 150. 00 3, 144. 84 13, 000. 00 8, 000. 00 3, 800.00 322. 84 7, 500. 00 8,000.00 2,553.09 6, 443. 06 878. 52 1. Def i. L t ..9 - University of Kentucky Statement of Plant Fund Expenditures For the Curre-nt Fiscal Period WMhich Began July 1, 1963 and Ended February 29, 1964 Renovatlion .nd Improvement of Buildings ( continued ) Appropriations Expenditures Encumbrances Outstanding Unencumbered Balance Total Renovation and Improvement $ 213,046.12 $ 13, 356. 14 $ 104, 963. 76 $ 94, 726. 22 Acquisition of Equipment Medical Science Activation of Inventories $ Northern Extension Center-Equip. Northwest Extension Center-Equip. Soutb-east Extension Center-Equip. Med. Sch. Lib. Acq. and Supplies Medical Center Hospital-Outpatient Clinic Movable Equipment Medical Science Building-Equipment Medical Science Building- Act. of Inventories Chemistry Physics Building- Chemistrv Department Equipment Chemistry- Physics Building- Physics Depar;;ment Equip. Margaret King Library Equipment Hospit'al Equipment Accounts University Hospital Patient Care- Activation In-ventorv Dental Sc-ie7nce B&ilding- Equip. Rare Bcok Roo-m Equip. Vandergraft Equipment Elizabe^-'town Eytenrsion Ce-ater T'.tzl Acquisi. t 'ion of Equipment $ 1 Other lmruroyements U. of Ky. Electrieal Dist. System $ U. of Ky. Razing of Water Tank Boile-- Renovation Feltner 4-H Camp Sewage and Water System Road-South FarIm Fenc kg-Ag-fonromy Area Repair Roads- Mercer Farm Activation o f Chemistry--Physics Building 3, 936. 64 4, 807.9P 3,037.24 4, 868. 85 8, 255.73 380, 929. 11 217, 817. 25 75,000.00 2, 407. 53 3, 070. 03 24, 954. 09 79, 485.57 48,012. 99 363, 822.31 3 . 27' 13, 501.31 122,000. 00 a$ 1, 252. 70 4. 030. 27 3, 037. 24 6, 289. 23 5, 215. 23 26, 836. 17 44,010.52 6, 718. 17 300. 39 416. 13 170. 10 13, 195. 22 5, 123. 82 68, 453.71 8, 553. 43 $ 444.32 893. 60 $ 2, 239. 62 ( 115. 97) 1 ( 1,420.38)1 3, 721.00 ( 680. 50) 1 63, 143. 76 28, 079. 61 100. 95 750.00 7, 679. 97 4, 082. 47 28, 939. 56 10, 065.00 28, 138. 95 290, 949. 18 145,727. 12 68, 180. 88 2, 107. 14 2,653. 90 24, 033. 99 58,610.38 38, 806. 70 266,429.04 3-5. 27 ( 5, 117. 12) 1 93, 861. 05 ,355, 941.82 $ 193, 602. 33 $ 176, 039. 19 $ 986, 300. 30 103, 147. 20 $ 891. 51 3, 143. 92 898. 33 4, 785. 00 265.98 55.550 4, 154. 84 $ 88, 551. 00 $ 10, 441. 36 891. 51 120. 00 3,023. 92 898. 33 4, 785. 00 265. 98 55.50 13, 609, 18 13, 603. 18 1. DeIx -10 of Buildings -10 h University of Kentucky Statement of Plant Fund Expenditures For the Current Fiscal Period Which Began July 1, 1963 and Ended February 29, 1964 Other Improvements ( continued) Consulting Retainer Proctor Convert Bldg. to Gas Heat University of Kentucky Campus Lighting Water System- South Farm Coldstream Farm Water System Total Other Improvements Contingency Reserves Medical School Clearing UK Clearing Accounts Total Contingency Reserves Total Unexpended Plant Funds II. Retirement of Indebtedness F Debt Services 2nd PWA Issue Dorm. Rev. Bond Issue Auditorium Field House Issue Library Building Issue Stadium Addition Issue Dorm. Rev. Issue ( 456 Rose) Journalism Building Bond Issue Dorm. Rev. Issue ( 476 Rose) Student Dorms ( 1953 ) Student Dorm ( Kappa Sigma) Student Dorm ( Lambda Chi) Student Dorm ( Phi Sigma Kappa) Student Dorm ( Pi Kappa Alpha) Dormitory Revenue Bonds of 1952 Dormitory Revenue Bonds of 1954 Dorm. Revenue Bonds of 1956- Cooperstown Apartments Dorm. Revenue Bonds of 1956- Six Sorority Dorms Dorm. Revenue Bonds of 1956- Student Dorms Reserve Dorm, Revenue Bonds of 1956- 336 Clifton Avenue Encumbrances Unencumbered Appropriations Expenditures Outstanding Balance $ 7,200. 00 $ 1,763.94 $ 3,236.06 $ 2,200.00 251.89 251.89 75, 086. 00 64, 044. 00 9, 052. 00 1, 990. 00 49.60 49.60 55, 000.00 55,000.00 $ 264, 378. 11 $ 70, 480.65 $ 100,959.06 $ 92,938.40 $ 39,433.58 $ $ $ 39,433.58 1,264.50 1,264.50 $ , 40,69808 $ $ $ 40,698.08 $10, 061, 054. 28 $ 1,418,339. 22 $ 2, 795, 146.09 $ 5,847,568.97 Iunds $ 18, 207.94 24, 823, 25 61, 040.78 131, 399. 97 17, 947.52 8, 633. 20 31, 470. 25 4, 938. 93 23,220,.17 12, 028. 26 13,723.60 11,418.43 12,588.74 79,729.50 39, 875.61 $ 254,739.20 58, 782.50 37,500.00 8, 073.00 18, 110.78 2, 212.50 52,098.75 2, 420. 00 1, 443. 75 3, 153. 30 12, 127.50 2, 780. 00 3, 220.41 1, 610, 21 1, 610. 21 1, 610. 21 1, 610. 21 38,597.50 17,269.97 $ a$ 40, 738. 70 19, 372. 50 2, 975, 00 97. 16 22,610.75 8,942.03 128,979.97 16,503.77i 5, 479. 90 19,342.75 2, 158.93 19, 999.76 10, 418.05 12, 113. 39 9, 808. 22 10, 978.53 41, 132.00 22, 605.64 214,000.50 39,410. 00 37,500.00 5,098.00 1. Deficit -11- University of Kentucky Statement of Plant Fund Expenditures For the Current Fiscal Period Which Began July 1, 1963 and Ended February 29, 1964 Debt Services ( continued) Appropriations Expenditures Encumbrances Unencumbered Outstanding Balance Dorm. Revenue Bond of 1956- Holmes Hall Dorm. Revenue Bonds of 1956- Shawneetown Dorm. Revenue Bond of 1957- 468 Rose Dorm. Revenue Bond of 1957- 342 Clifton Avenue Housing Bond of 1958- Haggin Hall Consol. Educ. Bldgs. -Series A Universitv of Kentucky Housing Bonds UK Dining Hall Bonds Comm. College Ed. Building Consol. Education Building-Series B UK Student Union Building Total Debt Service Sinking Fund Reserves with Trustee Dorm. Rev. Bonds of 1955- Reserve Holmes Hall Dorm. Rev. Bonds of 1956- Shawneetown Dorm. Rev. Bonds of 1952- Res. Dorm. Rev. Bonds of 1954-Res. Consol. Educ. Bldg. Rev. Bonds- Res. Housing Bond of 1958- Haggin Hall U. of Ky. Housing Bond of 1960- Res. UK Housing Dining Hall Comm. College Ed. Building Cons. Ed. Bldg. Revenue $ 47,479.00 $ 89. 354. 00 7,501.00 8, 246. 55 76, 426. 75 498,220.48 20, 700.00 63, 083. 22 37, 995. 00 268, 431. 25 35,424.60 13,695. 00 $ 62, 840. 00 5, 750. 00 3,075.00 76, 179. 33 143, 909, 35 4, 633. 91 20, 654. 34 18, 967.50 134, 218. 75 34, 886. 50 $ 33,784.00 26, 514.00 1,751.00 5,171.55 247.42 354, 311. 13 16, 066. 09 42, 428. 88 19, 027. 50 134, 212. 50 538. 10 $2,003,002.70 $ 741,771.18 $ $ 1,261,231.52 $ 102, 676.59 $ $ $ 102, 676.59 247,550.84 247,550.84 132,396.90 132,396.90 73,825.62 73,825.62 390, 047.05 390,047.05 75,410.28 75,410.28 19,025.46 19,025.46 19, 556. 75 19,556.75 18,907.50 18,907.50 134,218.75 134,218.75 Total Sinking Fund Rese'rve $ 1, 213, 615.74 Total Retirement of Indebtedi Funds Total Plant Fund Appropriations $. $ $ 1, 213. 615. 74 iess $ 3,216, 618. 44 $ 741,771.18 $ $ 2,474,847.26 $ 13,277, 672.72 $ 2, 160, 110. 40 $ 2, 795, 146. 09 $ 8,322, 416. 23 1. Deficit University of Kentucky Statement of Other Fund Transactions For the Current Fiscal Period Which Began July 1, 1963 and Ended February 29, 1964 Restricted Funds: Fund Balances Balances July 1, 1963 Receipts $ 5,494,788.42$11,617,811.16 Disburse- - ments Balances February 29, 1964 $10,549,652.51 $ 6,562,947.07 Loan Funds: Principal- National Defense Education A 1958: Federal Government University Accum. Interest Income- NDEA University Student Loan Fi University Special Student Loan Funds United Student Aid Loan Fi Expendable Subtotal Endowment Funds: Principal Expendable Subtotal Agency Funds: Balances Combined Totals ct, 'inds ind 720,540.41$ 80, 060. 04 3, 920. 65 29, 939. 96 23, 648. 53 1,000.00 141, 258.81 $ 15,695.41 1 1, 987. 942 184, 304. 59 $ 861, 799.22 95,755.45 5,908.59 214, 244.55 20, 474.44 44, 122. 97 1,000.00 15, 324. 18 559. 61 62.50 15, 821.59 $ 874, 434. 07 $ 364, 280.80 $ 62.50 $ 1, 238, 652. 37 $ 335,534. 96$ 3, 674.50 $ $ 339, 209.46 13,308.27 3,232.97 1,239.41 15,301.83 $ 348, 843. 23 $ 6, 907.47 $ 1,2239.41 $ 354,511. 29 $ 174, 287. 36 $ 1, 318, 371. 19 $ 1, 479, 935.86 $ 12, 722. 69 $ 6, 892, 353.08 $ 13,307,.370..62 $ 12, 030,,89D.28 $ 8, 168, 833,42 1. Inter- fund Transfers 2, Transfer from other funds. -13- 17 CONTRACTS AND/OR AGREEMENTS 1. Easement at West Kentucky Experrnent Substation Recorrmendation: that approval be given for an easemant to Norval L. Oliver, Princeton, Kentucky, granting him the right to lay and maintain a one-inch water line pipe 1147 feet in length and extending from the east end of the pipe line supplying water to the University's Western Kentucky Agricultural Experiment Substation to the east boundary line of the tract of land on which the Substation's office building is located, and that the appropriate officers of the University be authorized to execute the necessary document. Background: Norval L. Oliver of Princeton, Kentucky, plans to construct a res- idence on property adjoining the University's Substation and has asked For the right to lay a one--nch water pipe line from the water line supplying the Substation to the east boundary line of the Substation property. At the time the line is connected to the water supply line, the University is to be paid a fee of $125 by the City of Princeton in accordance with our contract with the City of Princeton, dated March 16, 1