Goodman-Paxton Photographic Collection,
Descriptive Summary
- Title
- Goodman-Paxton Photographic Collection,
- Date
- 1934-1942
- Creator
- Goodman, George, 1876-1961
- Extent
- 8 cu. ft. (44 Boxes): 5699 items
- Subjects
- United States--Works Progress Administration
- United States--Work Projects Administration
- United States--Works Progress Administration--Kentucky
- United States--Work Projects Administration-Kentucky
- Repository
- University of Kentucky
Collection Overview
- Biography / History
- In 1900, George H. Goodman (1876-1961) founded a mail order whiskey business which he continued until the enactment of the 1919 Volstead Act (Prohibition). In 1922 he bought the Paducah News-Democrat which he operated until 1929 when he sold it to Edwin J. Paxton (1877-1961). From 1934 through 1941, Goodman was director of the Works Progress Administration in Kentucky, and then he served as state director of the Office of Price Administration from 1942 to 1946.
- Scope and Content
- The collection consists of 5699 black and white photographic prints, taken for and under the direction of George Goodman, Director of the Works Progress Administration (WPA) in Kentucky. Cover in the years 1934 to 1942, these images document the accomplishments of the WPA within the state. Views of building and road construction predominate, although photographs of people enrolled in various WPA training programs are located at the end of each album. The collection documents the construction of schools, hospitals, courthouses, libraries, and municipal buildings.
- Items #1-423 were in the original donation as loose photographs, so designated because the remaining 5276 items in the collection were affixed in either albums, scrapbooks, or as photographic supplements to narrative reports.
- Items #424-989 were originally presented in nine separate albums. The photographs in the albums were arranged by county, this order has been retained.
- Items #990-4968 were originally presented in scrapbook format. The scrapbooks were dissembled, and the photographs have been grouped by county where the projects being documented took place.
- Items #4969-5094 were original presented as part of the First Annual Report of the Second District. Second District refers to the Second Congressional District of Kentucky, which comprised most of Western Kentucky at the time. The report was produce in 1937. The photographs are described from the report, and most include the individual project numbers of their subjects.
- Items #5095-5174 were the photographic supplement to the Semi-Monthly Narrative Reports. The months of September through December of 1936 are represented.
- Items #5175-5640 are the photographic supplement to the full, by-project number narrative reports of WPA progress from the years 1935 through 1937.
- Items #5641-5966 are duplicate of photographs in the collection. They are identified by the item number of the image they duplicate. The duplicate images are not pictured in the container list.
Contents of the Collection
Architecture
Adair County
Allen County
Anderson County
Ballard County
Barren County
Boyd County
Boyle County
Marker at the Ephraim McDowell House in Danville, KY., [n.d.] - [n.d.]
Dedication of Ephraim McDowell House, recently reconditioned by WPA, [n.d.] - [n.d.]
Speakers' platform for a ceremony, [n.d.] - [n.d.]
Spectators, black and white, at dedicatory ceremony, [n.d.] - [n.d.]
Mrs. McDowell, Custodian of the McDowell House, showing instruments used, [n.d.] - [n.d.]
Dr. McCormick, Head of the State Dept. of Health, tries one of the scales used by Dr. McDowell, [n.d.] - [n.d.]
Dr. McCormick shows one of the instruments used to operate on President Polk, [n.d.] - [n.d.]
Dr. Irwin Abell, President of the American Medical Association, at the dedication of the Ephraim McDowell House, [n.d.] - [n.d.]
Rear of the McDowell House, [n.d.] - [n.d.]
Backyard of the McDowell House, [n.d.] - [n.d.]
Ephraim McDowell House prior to renovation, [n.d.] - [n.d.]
Door and plaque, McDowell House, [n.d.] - [n.d.]
McDowell House after renovation, [n.d.] - [n.d.]
McDowell House, [n.d.] - [n.d.]
View of the crowd at the dedication of the McDowell House after renovation by the WPA, [n.d.] - [n.d.]
Another view of the crowd at the dedication, [n.d.] - [n.d.]
Rear porch of the McDowell House, looking to the front hall, [n.d.] - [n.d.]
Pergola (sp?) in backyard of McDowell House, [n.d.] - [n.d.]
Door to living room of the McDowell House before remodeling by WPA, [n.d.] - [n.d.]
Door to living room after remodeling by the WPA, [n.d.] - [n.d.]
Parlor of McDowell House before renovation by WPA, [n.d.] - [n.d.]
Parlor of McDowell House after renovation by the WPA, [n.d.] - [n.d.]
Bedroom above living room of the McDowell House before renovation by the WPA, [n.d.] - [n.d.]
Bedroom above the living room of the McDowell House after renovation, [n.d.] - [n.d.]
Dining room fireplace, McDowell House, before renovation, [n.d.] - [n.d.]
Dining room fireplace after renovation, [n.d.] - [n.d.]
Bed room above the parlor, McDowell House, before renovation, [n.d.] - [n.d.]
Bed room above the parlor. McDowell House, after renovation, [n.d.] - [n.d.]
Kitchen fireplace. McDowell House, before renovation, [n.d.] - [n.d.]
Kitchen fireplace, McDowell House, after renovation by WPA, [n.d.] - [n.d.]
Kitchen entrance, McDowell House, before renovation, [n.d.] - [n.d.]
Rear porch, McDowell House, looking to front hall, [n.d.] - [n.d.]
Front stairs and door to rear porch, McDowell House, [n.d.] - [n.d.]
Bed room above dining room, McDowell House, [n.d.] - [n.d.]
Bedroom above dining room, McDowell Hose, after renovation, [n.d.] - [n.d.]
Boyle County High School, near Danville, [n.d.] - [n.d.]
Caldwell County
Calloway County
Campbell County
Carroll County
Carter County
Casey County
Christian County
Clay County
Clinton County
Corbin County
Estill County
Fayette County
Fleming County
Floyd County
Franklin County
Fulton County
Gallatin County
Graves County
Grayson County
Green County
Greenup County
Hardin County
Swimming Pool at Ft. Knox, [n.d.] - [n.d.]
Commissioned Officers' Club, Ft. Knox, [n.d.] - [n.d.]
Non-commissioned Officers' Club, Ft. Knox, [n.d.] - [n.d.]
Interior, Officers' Club, Ft. Knox, [n.d.] - [n.d.]
Interior, Officers' Club, Ft. Knox, [n.d.] - [n.d.]
Ft. Knox, [n.d.] - [n.d.]
Howe Valley School, [n.d.] - [n.d.]
White Mills School, [n.d.] - [n.d.]
Harlan County
Henderson County
Hopkins County
Front view of Shelter House and Receiving Vault at cemetery, [n.d.] - [n.d.]
Rear of Shelter House, [n.d.] - [n.d.]
New development showing additional lots, [n.d.] - [n.d.]
New development, Rosedale Cemetery, [n.d.] - [n.d.]
West Liberty Jail, [n.d.] - [n.d.]
State highway 109, along eastern front of Rosedale Cemetery, [n.d.] - [n.d.]
View of entrance to Rosedale Cemetery, facing County road running west, [n.d.] - [n.d.]
Shelter House, showing development, [n.d.] - [n.d.]
Main entrance, Rosedale Cemetery, Dawson Springs, KY., [n.d.] - [n.d.]
View of monuments and tombstones in cemetery, [n.d.] - [n.d.]
Concrete Stadium, Madisonville, KY., [n.d.] - [n.d.]
Madisonville High School, [n.d.] - [n.d.]
Madisonville High School, [n.d.] - [n.d.]
Hopkins County Hospital, Madisonville, KY., [n.d.] - [n.d.]
Hopkins County Hospital, [n.d.] - [n.d.]
Gymnasium, [n.d.] - [n.d.]
Municipal Building and Fire Station, Madisonville, KY., [n.d.] - [n.d.]
Madisonville Golf Club Clubhouse, [n.d.] - [n.d.]
Putting green, No. 1 Hole, Madisonville Golf Course, [n.d.] - [n.d.]
Jackson County
Jefferson County
Jefferson County Courthouse, Louisville, KY., [n.d.] - [n.d.]
Courthouse Annex, [n.d.] - [n.d.]
Annex to County Courthouse, Louisville, KY., [n.d.] - [n.d.]
University of Louisville, School of Law, [n.d.] - [n.d.]
Valley Station Swimming Pool, [n.d.] - [n.d.]
Shawnee Branch Public Library, Louisville. KY., [n.d.] - [n.d.]
Administration Building, Bowman Field, Louisville, KY, [n.d.] - [n.d.]
Administration Building, Bowman Field, Louisville, KY, [n.d.] - [n.d.]
Central Park, Louisville, KY., [n.d.] - [n.d.]
Administration Building, Bowman Field, Louisville, KY., [n.d.] - [n.d.]
Administration Building, Bowman Field, Louisville, KY., [n.d.] - [n.d.]
Administration Building, Bowman Field, Louisville, KY, [n.d.] - [n.d.]
Administration Building, Bowman Field, Louisville, KY., [n.d.] - [n.d.]
Dome of the Administration Building, Bowman Field, [n.d.] - [n.d.]
Entrance, Administration Building, Bowman Field, [n.d.] - [n.d.]
Service Building, University of Louisville, [n.d.] - [n.d.]
Baxter Avenue and broken sewer main which washed away, [n.d.] - [n.d.]
Johnson County
Knox County
Laurel County
London City Hall, [n.d.] - [n.d.]
High School, London, KY, [n.d.] - [n.d.]
East Bernstadt Gymnasium, [n.d.] - [n.d.]
East Bernstadt School, [n.d.] - [n.d.]
Hazel Green School and Gymnasium, [n.d.] - [n.d.]
Lawrence County., IN.
Letcher County
Lewis County
Linn County
Logan County
McLean County
McCracken County
McCracken County Courthouse, Paducah, KY., [n.d.] - [n.d.]
Paducah Swimming Pool, [n.d.] - [n.d.]
Municipal Swimming Pool and Clubhouse, Paducah, KY., [n.d.] - [n.d.]
Heath School, Paducah, KY., [n.d.] - [n.d.]
Men working on sewer line, Paducah, KY., [n.d.] - [n.d.]
Ditch for sewer line, Paducah, KY., [n.d.] - [n.d.]
Sewer cave-in, men working at Paducah, KY., [n.d.] - [n.d.]
Clearing land for ditch for sewer construction, Paducah, KY., [n.d.] - [n.d.]
Sewer construction, Paducah, KY., [n.d.] - [n.d.]
Sewer construction, Paducah, KY., [n.d.] - [n.d.]
Sewer cave-in, Paducah, KY., [n.d.] - [n.d.]
McCreary County
Madison County
Marion County
Martin County
Mercer County
Monroe County
Montgomery County
Morgan County
Muhlenburg County
Greenville Hospital, Greenville, KY., [n.d.] - [n.d.]
City Hospital, Greenville, KY., [n.d.] - [n.d.]
Greenville City Hall and Fire Station, [n.d.] - [n.d.]
Central City Gymnasium and Auditorium, [n.d.] - [n.d.]
Nicholas County
Ohio County
Pulaski County
Rockcastle County
Simpson County
Sullivan County., IN.
Todd County
Trigg County
Union County
Union County Courthouse, Morgenfield, KY., [n.d.] - [n.d.]
Union County Courthouse, Morgenfield, KY., [n.d.] - [n.d.]
Union County Courthouse, Morgenfield, KY., [n.d.] - [n.d.]
Union County Courthouse, Morgenfield, KY., [n.d.] - [n.d.]
Warren County
Washington County
Washington County Courthouse, Springfield, KY., [n.d.] - [n.d.]
Washington County Courthouse, Springfield, KY., [n.d.] - [n.d.]
Washington County Courthouse, Springfield, KY., [n.d.] - [n.d.]
Interior of Washington County Courthouse, Springfield, KY., [n.d.] - [n.d.]
Wayne County
Webster County
Whitley County
Wolfe County
Woodford County
Miscellaneous
Oolitic High School, Oolitic, IN., [n.d.] - [n.d.]
Oolitic High School, Oolitic, IN., [n.d.] - [n.d.]
Goodnight Memorial Library and Gymnasium, [n.d.] - [n.d.]
Malrough School, [n.d.] - [n.d.]
Webster County Courthouse, Dixon, KY., [n.d.] - [n.d.]
Webster County Courthouse, Dixon, KY., [n.d.] - [n.d.]
Interior of Webster County Courthouse, Dixon, KY., [n.d.] - [n.d.]
Unidentified building, [n.d.] - [n.d.]
Unidentified building, [n.d.] - [n.d.]
Unidentified building, [n.d.] - [n.d.]
Unidentified building, [n.d.] - [n.d.]
Unidentified building, [n.d.] - [n.d.]
Unidentified building, [n.d.] - [n.d.]
Street scene showing destruction in Jeffersonville, IN., after Ohio River Flood, [n.d.] - [n.d.]
Unidentified Building, [n.d.] - [n.d.]
Unidentified doorway to a large building, [n.d.] - [n.d.]
WPA sign on which appears to be a water purification plant, [n.d.] - [n.d.]
WPA sign on a large concrete culvert, [n.d.] - [n.d.]
Unidentified school building, [n.d.] - [n.d.]
Unidentified school building, [n.d.] - [n.d.]
Unidentified school building, [n.d.] - [n.d.]
Unidentified pedestrian bridge over a pond, [n.d.] - [n.d.]
Unidentified, stone building, [n.d.] - [n.d.]
Unidentified outdoor covered walkway, with large concrete columns on both sides, [n.d.] - [n.d.]
Unidentified plaque on a brick wall; the plaque consists of a pair of wings and a propeller, [n.d.] - [n.d.]
View, looking upward from the ground at a several-story brick building, [n.d.] - [n.d.]
Interior staircase leading from a lobby, [n.d.] - [n.d.]
Flagpole mounted on a circle of ground in the center of a pond, [n.d.] - [n.d.]
Steps leading up to a round, balustrade area with brick walls, [n.d.] - [n.d.]
Unidentified school building, [n.d.] - [n.d.]
Unidentified courthouse with steeple and clock, [n.d.] - [n.d.]
Unidentified building, [n.d.] - [n.d.]
Unidentified power plant with tall smoke stack, [n.d.] - [n.d.]
A log house with first floor of brick, [n.d.] - [n.d.]
Constructing the log house with the first floor of brick, [n.d.] - [n.d.]
Small, steel. roadway bridge with WPA sign, [n.d.] - [n.d.]
Unidentified brick building, [n.d.] - [n.d.]
Unidentified, stone building with WPA sign, [n.d.] - [n.d.]
Unidentified, brick building, [n.d.] - [n.d.]
Single-pipe culvert under a roadway, [n.d.] - [n.d.]
Steeple and clock on unidentified building, [n.d.] - [n.d.]
Unidentified building, [n.d.] - [n.d.]
Unidentified school building, [n.d.] - [n.d.]
Small brick building, possibly a house, [n.d.] - [n.d.]
Unidentified, stone building with WPA sign, [n.d.] - [n.d.]
Unidentified brick school building under construction, [n.d.] - [n.d.]
Stone piers for a bridge under construction, [n.d.] - [n.d.]
Unidentified brick building with WPA sign, [n.d.] - [n.d.]
Steel bridge over a roadway, [n.d.] - [n.d.]
Front entrance to a large, brick building, [n.d.] - [n.d.]
Brick wall interspersed with cement columns and topped with concrete railing; probably the wall is three feet in height, [n.d.] - [n.d.]
Entrance to a large courthouse building; there are winding steps leading up from each side to the doorway, [n.d.] - [n.d.]
Brick schoolhouse under construction by WPA, [n.d.] - [n.d.]
Unidentified, two-story, stone building with WPA sign, [n.d.] - [n.d.]
Concrete bridge on stone piers over a roadway, [n.d.] - [n.d.]
Building under construction; steel girders are being put in place, [n.d.] - [n.d.]
Large. brick building under construction with WPA sign, [n.d.] - [n.d.]
Large, cement culvert with WPA sign, [n.d.] - [n.d.]
Leningrad
Monument of Peter the Great, [n.d.] - [n.d.]
The Admiralty, [n.d.] - [n.d.]
State Theater of Drama, [n.d.] - [n.d.]
Kitchen Factory, [n.d.] - [n.d.]
Peterhof, [n.d.] - [n.d.]
Intourist pier at port (June 18, 1945 - postcard), [n.d.] - [n.d.]
Large banner with stars in a V-shaped pattern; mounted on wall with a man looking up at it, [n.d.] - [n.d.]
Bookshelf, lined with books and with two portraits on top of the cabinet, [n.d.] - [n.d.]
Cityscape
Stockholm
Belgium
Event
Belgium
Verviers, Belgium, when WW II ended; May, 1945; crowds celebrating. This and the following six photos are signed by PFC. Fred Clark, [n.d.] - [n.d.]
Verviers, Belgium, May, 1945; crowd celebrating, [n.d.] - [n.d.]
Vierviers, Belgium, May, 1945; crowd celebrating, [n.d.] - [n.d.]
Verviers, Belgium, May, 1945; street scene with an American MP, [n.d.] - [n.d.]
Verviers, Belgium, May, 1945;one GI cameraman on a street filled with rubble, [n.d.] - [n.d.]
Germany
Germany, May, 1945; four soldiers taking pictures in a town, [n.d.] - [n.d.]
Siegfried Line, 1945; an American GI sitting on a tank obstacle, [n.d.] - [n.d.]
Ladies preparing a picnic table, [n.d.] - [n.d.]
Ladies preparing a picnic table, [n.d.] - [n.d.]
Ladies at a picnic table, [n.d.] - [n.d.]
Louisville Flood
Aerial photo of flooded rural area, [n.d.] - [n.d.]
Crest of Ohio River at 57.1 feet, at New Albany, IN., 1/27/37, [n.d.] - [n.d.]
Ohio River flood stage, U.G. 57.1 feet, at Jeffersonville, IN., 1/27/37. View showing Jeffersonville completely inundated. Note the business section to the right with some factory roofs just out of the water., [n.d.] - [n.d.]
In the background can be seen the Jeffersonville Quartermasters Depot while the surrounding area is inundated. Note the number of houses which have only their roofs out of water; 1/27/37., [n.d.] - [n.d.]
Aerial view of New Albany, IN showing section not affected by the flood waters along with near submerged homes and factories - 1/27/37, [n.d.] - [n.d.]
Aerial view of west section of Louisville looking north from Cecil Ave; white arch is entrance to Ky. State Fair Grounds - 1/27/37, [n.d.] - [n.d.]
Section of Barret and Broadway and the area flooded by Bearcat Creek - 1/27/37, [n.d.] - [n.d.]
View of section at Barret and Broadway showing the new overpass under construction and the Baptist and St. Anthony hospitals - 1/27/37, [n.d.] - [n.d.]
South Louisville section looking northwest; Churchill Downs is in the upper right hand corner, 1/27/37, [n.d.] - [n.d.]
West central section of Louisville, looking north with 7th street station of LG & E County. in foreground - 1/27/37, [n.d.] - [n.d.]
View of western section at the foot of Market Street - 1/27/37, [n.d.] - [n.d.]
Downtown Louisville area; in the center can be seen the Heyburn Building with the Louisville Free Public Library just this side. Photo made looking in 4th Avenue, 1/27/37., [n.d.] - [n.d.]
South central section showing Central Park with Mayflower and Puritan apartments to the right; note the one block on 6th street which is not flooded - 1/27/37, [n.d.] - [n.d.]
Looking east on Broadway from 21st Street, showing American Tobacco Co., the L & N Building and the Federal Land Bank, 1/27/37, [n.d.] - [n.d.]
Shows area flooded by Bearcat Creek, with St. Theresa Church at Schiller and Kentucky Street - 1/27/37, [n.d.] - [n.d.]
View of west end of Louisville with Western Junior High at left center - 1/27/37, [n.d.] - [n.d.]
South Louisville section showing Churchill Downs Race Track - 1/27/37, [n.d.] - [n.d.]
Eastern business area with the Big Four Bridge in background - 1/27/37, [n.d.] - [n.d.]
View showing Ford Motor County. in the center - 1/27/37, [n.d.] - [n.d.]
The Western Pennsy loads refugees and their belongings into boxcars at Frankfort after flood of 1/27/37, [n.d.] - [n.d.]
Group of well-dressed men overlooking flood - 1/27/37, [n.d.] - [n.d.]
Industry
Danville
Spraying Tank, Danville Disposal Plant, Danville, KY., [n.d.] - [n.d.]
Slush Drying Beds, Danville Disposal Plant, Danville, KY., [n.d.] - [n.d.]
Primary Tank, Danville Disposal Plant, Danville, KY., [n.d.] - [n.d.]
Danville Disposal Plant, Danville, KY., [n.d.] - [n.d.]
Laboratory Room, Danville Disposal Plant, Danville, KY/, [n.d.] - [n.d.]
Sewage Entrance Trough, Danville Disposal Plant, Danville, KY., [n.d.] - [n.d.]
Primary Tank, Slush skimming arm in background; Danville Disposal Plant, Danville, KY., [n.d.] - [n.d.]
Pump and Shredding Machine, Danville Disposal Plant, Danville, KY., [n.d.] - [n.d.]
Furnace Room, Danville Disposal Plant, Danville, KY., [n.d.] - [n.d.]
Chlorine Mixing Machine, Danville Disposal Plant, Danville, KY., [n.d.] - [n.d.]
City of Louisville
Men working with tractor and rock grinder, surfacing a road, [n.d.] - [n.d.]
Team of men with helmets, oxygen masks, etc., standing around a manhole with sign reading "Commissioners of Sewage of Louisville.", [n.d.] - [n.d.]
Man with oxygen mask, etc., [n.d.] - [n.d.]
Men with helmets and masks looking down into manhole, [n.d.] - [n.d.]
Men with helmets, masks and tools beside a manhole, [n.d.] - [n.d.]
Men with helmets, masks and tools beside a manhole, [n.d.] - [n.d.]
Men working in a deep ditch, [n.d.] - [n.d.]
Men working on building; WPA sign in foreground, [n.d.] - [n.d.]
Men using welding torch in an interior room, [n.d.] - [n.d.]
Man using a floor sander, [n.d.] - [n.d.]
Men scrubbing a street with fire hose and brushes, [n.d.] - [n.d.]
Men working on a street with roller machine in background, [n.d.] - [n.d.]
Miscellaneous
Farm workers, [n.d.] - [n.d.]
Two men cleaning out a barn, [n.d.] - [n.d.]
Two men loading belongings onto a truck; two men in a small rowboat with a dog; and two men wading in water - all in front of a flooded building, [n.d.] - [n.d.]
Men paving Bowman Field runway, [n.d.] - [n.d.]
Men laying sewer line, [n.d.] - [n.d.]
Men laying sewer line, [n.d.] - [n.d.]
Giant crane in a forest, [n.d.] - [n.d.]
Man operating a tractor pulling a road scrapper, [n.d.] - [n.d.]
Photo of man on a tractor hitched to a road scrapper, [n.d.] - [n.d.]
Photo of a road scrapper, [n.d.] - [n.d.]
View of a piledriver being used on the concrete bridge for Keys Ferry Road, [n.d.] - [n.d.]
Derrick loading rocks from a pile onto a truck, [n.d.] - [n.d.]
Monitoring equipment at a plant, [n.d.] - [n.d.]
Man operating engines and pumps hooked to large tubes, [n.d.] - [n.d.]
Interior
Miscellaneous
Interior of Stockholm City Hall - photo signed by PFC Fred Clark, [n.d.] - [n.d.]
Model train set-up - "Fred's trains" written on back, [n.d.] - [n.d.]
Stairway, [n.d.] - [n.d.]
Stairway, [n.d.] - [n.d.]
Lobby, looking toward an entrance and doorway, [n.d.] - [n.d.]
Stairway, [n.d.] - [n.d.]
Landscape
Miscellaneous
Unpaved road with entrance between two stone pillars, [n.d.] - [n.d.]
View of a pond surrounded by trees, [n.d.] - [n.d.]
View of a hillside with a pond and a few trees, [n.d.] - [n.d.]
WPA project showing men working on a ditch with a portable engine nearby, [n.d.] - [n.d.]
Water-filled ditch running through open field with farm buildings nearby and hills in the background, [n.d.] - [n.d.]
View of water-filled ditch, [n.d.] - [n.d.]
A rock quarry, [n.d.] - [n.d.]
A very muddy roadway, [n.d.] - [n.d.]
A WPA sign on a landscaping project; two cars parked at a curb--one is a 1935 Ford, [n.d.] - [n.d.]
A WPA sign stands against a fence-pole alongside a gravel road, [n.d.] - [n.d.]
A tree-lined paved road, [n.d.] - [n.d.]
Marine
People
Miscellaneous
General view of pupils at the Abraham Lincoln School in Lexington, KY., where WPA school lunches are served, [n.d.] - [n.d.]
Portrait
Miscellaneous
Mary Jo Hagan, [n.d.] - [n.d.]
Edwin J. Paxton with an arm about a girl and a boy who is in an Army uniform, [n.d.] - [n.d.]
Man standing on a bench made from half-cuts of large logs, [n.d.] - [n.d.]
Man astride a horse, [n.d.] - [n.d.]
Edwin J. Paxton standing with a young man in a sailor uniform, [n.d.] - [n.d.]
Edwin J. Paxton and another man exchanging "gifts": a briefcase and a loving cup, [n.d.] - [n.d.]
A lady writing on a note pad while standing between Edwin J. Paxton and another man., [n.d.] - [n.d.]
A man is releasing a young calf while other men watch from a downtown sidewalk. One of the men is Edwin J. Paxton., [n.d.] - [n.d.]
Edwin J. Paxton seated in a parlor, [n.d.] - [n.d.]
Edwin J. Paxton seated in a parlor (duplicate of # 385), [n.d.] - [n.d.]
Edwin J. Paxton seated in a parlor (duplicate of #385), [n.d.] - [n.d.]
Edwin J. Paxton standing and looking at vase of flowers, [n.d.] - [n.d.]
A portrait of a well-dressed young man, [n.d.] - [n.d.]
Edwin J. Paxton and another man standing behind a table on which is an open folio of newspapers, [n.d.] - [n.d.]
Edwin J. Paxton and another man (as in #390) are viewed at a slightly different angle, [n.d.] - [n.d.]
A young boy is paying attention to Edwin J. Paxton., [n.d.] - [n.d.]
Aunt Betty Arnett lived 87 years of her life unable to read or write; she lives far back at the headwaters of Licking River in Magoffin County, KY.. She is now doing well in the first grade in literacy classes offered in the mountains., [n.d.] - [n.d.]
Sport
Miscellaneous
Man drives a golf ball while others watch. One of the men is Edwin J. Paxton., [n.d.] - [n.d.]
Man driving a golf ball while others watch. One of the men is Edwin J. Paxton., [n.d.] - [n.d.]
Four men sitting on benches on a golf course. Man in the dark shirt is Ed Kellow, sports editor of the Paducah-Sun Democrat., [n.d.] - [n.d.]
Man selecting a golf club from bag held by another men, [n.d.] - [n.d.]
Man admiring a golf club; a 1940s vintage car is in the background, [n.d.] - [n.d.]
A group of men is crowded around a bulletin board on a golf course; one man in uniform has a "T-5" insignia on his sleeve (W.W.II era), [n.d.] - [n.d.]
Man is chipping out of a sand trap, [n.d.] - [n.d.]
Young man is being presented an award cup, [n.d.] - [n.d.]
Man being presented an award, [n.d.] - [n.d.]
Man is driving a golf ball while several people look on; a refreshment stand is in the background, [n.d.] - [n.d.]
Presentation of a golf award is made inside a tent, [n.d.] - [n.d.]
Three men at a table as one receives an award cup. One of the men is Edwin J. Paxton., [n.d.] - [n.d.]
Man prepares to drive off a tee with many spectators, [n.d.] - [n.d.]
Street Scene
Miscellaneous
Several 1940 vintage cars are parked on a street and a White Castle shop is on the corner. There are street car tracks on one street, so this is probably Louisville, [n.d.] - [n.d.]
A WPA sign is at the curb of a downtown street, [n.d.] - [n.d.]
Typical road construction in Kentucky by the WPA, [n.d.] - [n.d.]
A paved road along a park, [n.d.] - [n.d.]
Asphalt paved Elm Street, Crittenden County, Marion, KY., [n.d.] - [n.d.]
Asphalt paved Dumesnil Street, Louisville, KY, [n.d.] - [n.d.]
Concrete paved Southern Avenue, Covington, KY., [n.d.] - [n.d.]
Men working on Mitchell Hill Road at Fairdale, running to National Turnpike, [n.d.] - [n.d.]
WPA sign on a gravel country road, [n.d.] - [n.d.]
A street blocked off for repairs, [n.d.] - [n.d.]
A flooded street, [n.d.] - [n.d.]
A downtown street with trolley car and several autos. A White Castle is on the corner, [n.d.] - [n.d.]
A country gravel road, [n.d.] - [n.d.]
A WPA sign beside a dirt road curving through hills, [n.d.] - [n.d.]
Lynwood Avenue, Owensboro, KY, [n.d.] - [n.d.]
A downtown street scene; trolley tracks but no trolleys in view, [n.d.] - [n.d.]
Concrete paved Latonia Avenue, Covington, KY., [n.d.] - [n.d.]
Album 1
Ballard County
Graves County
Ballard County
Caldwell County
Calloway County
Carlisle County
Brick veneered school building, Arlington, KY., [n.d.] - [n.d.]
Completed section of a concrete paved street, Bardwell, KY., [n.d.] - [n.d.]
Wilson Creek, part of a swamp-draining project for malaria control, [n.d.] - [n.d.]
Curbs, gutters and paving with concrete, Bardwell, KY., [n.d.] - [n.d.]
Christian County
Concrete bridge on Pembroke - St. Elmo Road, [n.d.] - [n.d.]
Reconstructed Walnut Street, Hopkinsville, KY., [n.d.] - [n.d.]
Construction of Ninth Street Bridge across Little River, Hopkinsville, KY., [n.d.] - [n.d.]
Completed section of road near Pembroke, [n.d.] - [n.d.]
Crittenden County
Fulton County
Graves County
Hickman County
Livingston County
Lyon County
Marshall County
McCracken County
Heath High School, [n.d.] - [n.d.]
Swimming pool in Noble Park, Paducah, KY., [n.d.] - [n.d.]
Club House, Noble Park, Paducah, KY., [n.d.] - [n.d.]
Noble Park swimming pool under construction, Paducah. KY., [n.d.] - [n.d.]
Rip-rapping a portion of city river front, Paducah, KY., [n.d.] - [n.d.]
Street resurfacing, Paducah, KY, [n.d.] - [n.d.]
Road repair and improvement, [n.d.] - [n.d.]
Trigg County
Road improvement, [n.d.] - [n.d.]
Four room school, Linton, KY., [n.d.] - [n.d.]
Swimming pool constructed near Cadiz, KY, [n.d.] - [n.d.]
Clerks compiling statistics from health records, [n.d.] - [n.d.]
Regular rest periods are kept at the 174 WPA nursery schools, [n.d.] - [n.d.]
Literacy class at CCC Camp taught by WPA teacher, [n.d.] - [n.d.]
WPA colored teacher trains chorus, [n.d.] - [n.d.]
Good sportsmanship and physical training found at WPA recreation centers, [n.d.] - [n.d.]
Typical of comforter projects where 45,807 cotton and wool comforters were processed by women on relief, [n.d.] - [n.d.]
Colored women on relief have their own sewing rooms in west Kentucky counties, [n.d.] - [n.d.]
Each garment made in the Training Work Center is graded on workmanship. Workers turning in poorly constructed garments must rip and remake them, [n.d.] - [n.d.]
142,520 garments with monetary value of $129,211 made to date by women in the Training workers Centers. Garments are released to Sponsors (usually County judges) for distribution to the needy., [n.d.] - [n.d.]
Album 2
Boone County
Campbell County
Resurface Kentucky Drive, Clifton, KY., [n.d.] - [n.d.]
Part of city-wide street improvement, Newport, KY., [n.d.] - [n.d.]
Street resurfaced with bituminous macadam, Bellview, KY., [n.d.] - [n.d.]
Reconstruction of California-Gubser Mill Road, [n.d.] - [n.d.]
Excavation for storm sewers, Newport, KY., [n.d.] - [n.d.]
Part of city-wide sewer construction project, Newport, KY., [n.d.] - [n.d.]
Carroll County
Gallatin County
Reconstruct and resurface Steel Bottom Road, [n.d.] - [n.d.]
Extension of city water mains, Warsaw, KY., [n.d.] - [n.d.]
Lick Creek Road under construction, [n.d.] - [n.d.]
Sanitary sewer construction, Warsaw, KY., [n.d.] - [n.d.]
Grant County
Kenton County
Installation of 30-inch concrete sewer, Ludlow, KY., [n.d.] - [n.d.]
Concrete Street construction, Covington, KY., [n.d.] - [n.d.]
Section of city-wide sewer construction project, Covington, KY., [n.d.] - [n.d.]
Section of city-wide curb and gutter project, Covington, KY., [n.d.] - [n.d.]
Oldham County
Reconstructed city streets in Peewee Valley, Peewee Valley, KY., [n.d.] - [n.d.]
Oregon-Covington Road, Section of an Oldham County Blanket Road, [n.d.] - [n.d.]
Jericho Road, typical construction of a farm-to-market road, [n.d.] - [n.d.]
Westport Road, [n.d.] - [n.d.]
Pendleton County
Concrete bridge, [n.d.] - [n.d.]
A section of graded and drained road with crushed limestone, [n.d.] - [n.d.]
Installation of section of 5,000 foot sanitary sewer system, Dayton, KY., [n.d.] - [n.d.]
Surface treated traffic-bound macadam road, [n.d.] - [n.d.]
Trimble County
Operation of stone quarry, part of Mt. Pleasant Road project, [n.d.] - [n.d.]
Retaining walls constructed on Milton School property, [n.d.] - [n.d.]
Reconstruction of Palmyro Road, [n.d.] - [n.d.]
Father and son attend classes taught by WPA teacher, [n.d.] - [n.d.]
Children at one of the 119 WPA recreation centers, [n.d.] - [n.d.]
Lunch time for children at WPA colored nursery school, [n.d.] - [n.d.]
Recording and checking done by WPA workers in Better Housing Headquarters, [n.d.] - [n.d.]
Graphs showing causes of death are made by sixteen WPA workers on health projects in these ten counties, [n.d.] - [n.d.]
Garments of monetary value of $65,987.13 made to date in these ten counties, [n.d.] - [n.d.]
Pattern shelves made from corrugated boxes, envelopes made from brown wrapping paper, show system of keeping patterns in Training Work Center, [n.d.] - [n.d.]
Orderliness and systematic work is part of the training in the training work centers, [n.d.] - [n.d.]
Colored women in training work centers earnestly endeavoring to make seams and buttonholes similar to model samples displayed on bulletin boards, [n.d.] - [n.d.]
Album 3
Bath County
Gymnasium and auditorium, Sharpsburg, KY., [n.d.] - [n.d.]
Paving city streets with concrete, Owingsville, KY, [n.d.] - [n.d.]
Concrete street pavement, Courthouse Square, Owingsville, KY., [n.d.] - [n.d.]
Reconstruction of Mormon Church Road, [n.d.] - [n.d.]
Boyd County
New Library Building at Ashland, Ky., [n.d.] - [n.d.]
Concrete stadium at Putnam High School, Ashland, KY., [n.d.] - [n.d.]
Rearing ponds constructed as part of Fish Hatchery project at Ashland, [n.d.] - [n.d.]
Typical section of graded road, [n.d.] - [n.d.]
Bracken County
Breathitt County
Five-room native stone building, Big Rock, [n.d.] - [n.d.]
Constructing three-room native stone school building at VanCleave, KY, [n.d.] - [n.d.]
Municipal Building at Jackson, KY., [n.d.] - [n.d.]
Section of county-wide road improvement project, [n.d.] - [n.d.]
Carter County
Brick addition to Grayson School Building, Grayson, KY., [n.d.] - [n.d.]
Eight-room, brick, consolidated building at Upper Tygart, KY., [n.d.] - [n.d.]
Junior High School building at Hitchens, KY., [n.d.] - [n.d.]
Preparing stone for county jail, Grayson, KY., [n.d.] - [n.d.]
Elliott County
Fleming County
Greenup County
Section of county-wide road improvement project, [n.d.] - [n.d.]
Section of county-wide road improvement project, [n.d.] - [n.d.]
Section of city-wide sanitary sewer project, Worthington, KY., [n.d.] - [n.d.]
Bridge construction, part of county-wide road project, [n.d.] - [n.d.]
Harrison County
Lawrence County
Four-room native stone school building, Meades Branch, KY., [n.d.] - [n.d.]
Four-room native stone school building, Falksburg, KY., [n.d.] - [n.d.]
Six-room native stone addition to school building, Louisa, KY., [n.d.] - [n.d.]
Section of county-wide road improvement project, [n.d.] - [n.d.]
Lewis County
Repairing of city streets, Vanceburg, KY., [n.d.] - [n.d.]
Improvement of Tollsboro-Countyvedale Road, [n.d.] - [n.d.]
Reconstruction of Vanceburg-Tannery Road, [n.d.] - [n.d.]
Typical graded section county-wide road improvement project, [n.d.] - [n.d.]
Mason County
Sanitary and storm sewer construction at Woodleigh School. Woodleigh. KY., [n.d.] - [n.d.]
Reinforced concrete bridge construction, Maysville, KY., [n.d.] - [n.d.]
Improvement of Mt. Carmel Road, [n.d.] - [n.d.]
Ditching and shouldering Mayslick-Chactaw Road, [n.d.] - [n.d.]
Menifee County
Concrete surfacing Main and Court streets, Frenchburg, KY., [n.d.] - [n.d.]
Hawkins Branch Road, [n.d.] - [n.d.]
Graded, drained and surfaced portion and constructed bridge on Peter Trace Creek Road, [n.d.] - [n.d.]
McCausey Ridge Road, [n.d.] - [n.d.]
Montgomery County
City high school stadium, Mt. Sterling, KY., [n.d.] - [n.d.]
Graded, drained and surfaced farm-to-market road, [n.d.] - [n.d.]
Road from Salem Church to Spencer Pike, [n.d.] - [n.d.]
Spencer Road, [n.d.] - [n.d.]
Morgan County
A 24-room native stone school building and auditorium, West Liberty, KY., [n.d.] - [n.d.]
A six-room native stone high school building, Wrigley, KY., [n.d.] - [n.d.]
A six-room native stone school building, Carmel City, KY., [n.d.] - [n.d.]
Section of county-wide road improvement project, [n.d.] - [n.d.]
Nicholas County
Completing athletic field and grandstand at Carlisle High School, Carlisle, KY., [n.d.] - [n.d.]
Construction of East Union Road, [n.d.] - [n.d.]
Section of improved East Union Road, [n.d.] - [n.d.]
Bartersville Road improvement by oil-treating surface, [n.d.] - [n.d.]
Powell County
Robertson County
Bridge constructed on county-wide road project, [n.d.] - [n.d.]
Section of road improved on county-wide road project, [n.d.] - [n.d.]
Reconstruction of Cedar Creek Road, [n.d.] - [n.d.]
Riley Mill Road, surfaced with water-bound macadam, [n.d.] - [n.d.]
Rowan County
Native stone County garage at Morehead, Ky., [n.d.] - [n.d.]
Laying foundation walls for native stone six-room school building at Elliottsville, Ky., [n.d.] - [n.d.]
Septic tank under construction at Morehead, KY., [n.d.] - [n.d.]
Section of county-wide road improvement project, [n.d.] - [n.d.]
Wolfe County
Four-room native stone school building at Hazel Green, KY., [n.d.] - [n.d.]
Lacey Creek Road, [n.d.] - [n.d.]
Section of road from Highway #11 to Breathitt County Line, [n.d.] - [n.d.]
Road entering Campton, Ky., [n.d.] - [n.d.]
Boys in handicraft class (WPA Recreation Project) repairing and painting old toys to be given to under-privileged children, [n.d.] - [n.d.]
These women turn out many serviceable garments each day that eventually, through the sponsor, find their way into the homes of the needy, [n.d.] - [n.d.]
Some of the 352,957 baby garments made in the WPA Training Work Center, [n.d.] - [n.d.]
170,516 garments with a monetary value of $126,334.96 made to date in these twenty counties., [n.d.] - [n.d.]
This woman walks four and a half miles to and from work and supports an invalid husband and five children on her WPA wages, [n.d.] - [n.d.]
A representative number of colored women from relief rolls works in training work centers, [n.d.] - [n.d.]
Mountain recipes and scrap books of current events have been developed by the Packhorse librarians who deliver 3,548 books monthly, [n.d.] - [n.d.]
Packhorse librarians cross footlogs to reach home used as a distributing center for that mountain community, [n.d.] - [n.d.]
Many roads can be traveled only on horseback by the carriers on Packhorse Library Projects, [n.d.] - [n.d.]
Some of the homes in East Kentucky visited by WPA literacy teachers, [n.d.] - [n.d.]
0ne of the 183 WPA literacy teachers in Kentucky, [n.d.] - [n.d.]
Album 4
Bell County
Native stone graded school building, Fonda, KY., [n.d.] - [n.d.]
Native stone graded school building, Balkan, KY., [n.d.] - [n.d.]
Bartlett-Rhodes Park Bath House and Swimming Pool, Middlesboro, KY., [n.d.] - [n.d.]
Stadium for city high schools, Pineville, KY., [n.d.] - [n.d.]
Road to State Park, graded, drained and surfaced, [n.d.] - [n.d.]
Clay County
Colored Graded School, Manchester, KY., [n.d.] - [n.d.]
Grade, drain and surface city streets, Manchester, KY., [n.d.] - [n.d.]
Sandstone base on Burning Springs-Foggerton Road, [n.d.] - [n.d.]
Sandston Quarry; stone to be used for road base in connection with Blanket Road Project, [n.d.] - [n.d.]
Clinton County
Typical culvert built as part of county-wide road improvement project, [n.d.] - [n.d.]
Ida-Desda Road, section of road improvement project, [n.d.] - [n.d.]
Cartwright-Cumberland City Road, [n.d.] - [n.d.]
Section of road repaired on county-wide improvement project, [n.d.] - [n.d.]
Cumberland County
Reconstructed high school building at Burkeville, Ky., [n.d.] - [n.d.]
Gymnasium building constructed in connection with Consolidated School at Marrowbone, KY., [n.d.] - [n.d.]
Bear Creek Bridge on Modoc-Frogue Road, [n.d.] - [n.d.]
Amandaville Road, [n.d.] - [n.d.]
Section through rock cut, [n.d.] - [n.d.]
Harlan County
Cumberland, KY., City Hall building constructed of native stone, [n.d.] - [n.d.]
City Hall, Cumberland, KY., [n.d.] - [n.d.]
Swimming pool at Girls' Recreation Center, [n.d.] - [n.d.]
Hall Memorial Gymnasium constructed of native stone, [n.d.] - [n.d.]
Gymnasium building in Verda, KY., constructed of native stone, [n.d.] - [n.d.]
Jackson County
Graded, drained and surfaced, Sand Gap-Kirby Knob Road, [n.d.] - [n.d.]
Graded, drained and surfaced Foxtown Road, [n.d.] - [n.d.]
Graded, drained and surfaced Sand Gap-Kirby Knob Road, [n.d.] - [n.d.]
Quarrying limestone for Clover Bottom Road, [n.d.] - [n.d.]
Knox County
School in Flat Lick, KY., [n.d.] - [n.d.]
Native stone high school and auditorium building, Barbourville, KY., [n.d.] - [n.d.]
Lynn, KY., school and auditorium, [n.d.] - [n.d.]
Artemus High School, Artemus, KY., [n.d.] - [n.d.]
Gymnasium and auditorium addition to City High School, Barbourville, KY., [n.d.] - [n.d.]
Laurel County
Eight-room native stone school building, East Bernstadt, KY.,, [n.d.] - [n.d.]
Twelve-room native stone high school building, London, KY., [n.d.] - [n.d.]
Reconstruction of streets and sidewalks, London, KY., [n.d.] - [n.d.]
Graded, drained and surfaced with crushed limestone, Piney Grove Road, [n.d.] - [n.d.]
Leslie County
Constructing an eighteen-room school building of native stone at Hyden, KY., [n.d.] - [n.d.]
Road to Hyden down Middle Fork Creek, [n.d.] - [n.d.]
Hyden Road down Middle Fork Creek, showing cut necessary to construction, [n.d.] - [n.d.]
Road construction through rock cut, [n.d.] - [n.d.]
McCreary County
Swimming pool and club house in connection with recreational facilities at Stearns, KY., [n.d.] - [n.d.]
Parkers Lake School, [n.d.] - [n.d.]
Street under construction in Whitley City, KY., [n.d.] - [n.d.]
Marsh's Siding-Ritner Road, [n.d.] - [n.d.]
Monroe County
School and gymnasium building at Gamaliel, KY, [n.d.] - [n.d.]
Office building constructed for Monroe County Board of Education, [n.d.] - [n.d.]
White Oak Road, [n.d.] - [n.d.]
Section of the Monroe Blanket Road Project under construction, [n.d.] - [n.d.]
Owsley County
Bridge over Cow Creek in connection with farm-to-market road, [n.d.] - [n.d.]
Bridge in connection with farm-to-market road, [n.d.] - [n.d.]
Bear Run Road, [n.d.] - [n.d.]
Gravel surfaced Levi Travelers Rest Road, [n.d.] - [n.d.]
Pulaski County
Rockcastle County
Russell County
Wayne County
City Hall and Fire Station constructed of native stone at Monticello, KY., [n.d.] - [n.d.]
Completed section of road leading to Lock #21, [n.d.] - [n.d.]
Murl Road, [n.d.] - [n.d.]
No-Nox Inn Road, [n.d.] - [n.d.]
Whitley County
Completed 26-room building, landscaped grounds and constructed driveways at Cumberland Falls Lodge, [n.d.] - [n.d.]
constructed bridge on Jack's Fork Road, [n.d.] - [n.d.]
Constructing native stone addition to Williamsburg School, Williamsburg, KY., [n.d.] - [n.d.]
Constructing jail at Williamsburg, KY., [n.d.] - [n.d.]
Constructing native stone, eight-room high school and gymnasium at Woodbine, Ky., [n.d.] - [n.d.]
Each woman cuts, fits and sews each of the garments she makes on the WPA project, [n.d.] - [n.d.]
325,331 garments with a monetary value of $212,580.08 made to date in these 17 counties, [n.d.] - [n.d.]
Learning to thread the loom and weave is part of the training women receive in the Training Work Centers, [n.d.] - [n.d.]
Women learn to re-bottom chairs as part of the one-hour daily training period in a Training Work Center, [n.d.] - [n.d.]
Valuable public records are typed from loose index cards to permanent ledger sheets by WPA workers, [n.d.] - [n.d.]
WPA workers alphabetize index cards in county courthouse before writing them in permanent record books in twenty counties, [n.d.] - [n.d.]
WPA Packhorse librarian visits isolated mountain house, carrying books in saddle bags and home-made hickory baskets, [n.d.] - [n.d.]
Books donated for distribution on WPA Packhorse Library Project. 3,914 books and 8,808 magazines delivered monthly in these 17 counties., [n.d.] - [n.d.]
Packing saddle bags with carefully chosen books which will be distributed in rural and mountain communities, [n.d.] - [n.d.]
Four of the Packhorse librarians ready for the day's work, [n.d.] - [n.d.]
One of the mountain homes visited by WPA Packhorse librarian. Man was permanently injured by bullet wound, [n.d.] - [n.d.]
General
Pack Horse Librarians start down Greasy Creek to remote homes of mountaineers anxious for books., [n.d.] - [n.d.]
Album 5
Adair County
Gymnasium building constructed in connection with Graded and High School, Columbia, KY., [n.d.] - [n.d.]
Bridge erected as part of Eunice to Casey County Line Road Project, [n.d.] - [n.d.]
construction of sewage disposal plant, Columbia, KY., [n.d.] - [n.d.]
Sparksville-Weed Road, [n.d.] - [n.d.]
Gadberry Road, [n.d.] - [n.d.]
Anderson County
Gymnasium addition to Western High School, Johnsonville, KY., [n.d.] - [n.d.]
Woodford Street, Lawrenceburg, KY., [n.d.] - [n.d.]
Typical section of Lawrenceburg street improvement project, [n.d.] - [n.d.]
Ninevah Road, [n.d.] - [n.d.]
Section of county-wide road improvement plan, [n.d.] - [n.d.]
Barren County
Breckenridge County
Imhoff Tank, part of sewage disposal system, Hardinsburg, KY, [n.d.] - [n.d.]
Steel Bridge constructed on County road project, [n.d.] - [n.d.]
Hardinsburg-Balltown Road, [n.d.] - [n.d.]
Crushing and spreading stone on county road, [n.d.] - [n.d.]
Bullitt County
Grayson County
Green County
Hancock County
Farm Shop and Economics Building addition to Hawesville High School, Hawesville, KY., [n.d.] - [n.d.]
Constructing concrete streets around Courthouse Square, [n.d.] - [n.d.]
Main Cross Street, Hawesville, KY., [n.d.] - [n.d.]
Farm-to-market road under construction, [n.d.] - [n.d.]
Hardin County
Warehouse Building, Elizabethtown, KY., [n.d.] - [n.d.]
Box culvert typical of those constructed on County road program, [n.d.] - [n.d.]
Miles Street, Elizabethtown, KY., [n.d.] - [n.d.]
Grade and drain County road, [n.d.] - [n.d.]
Hart County
Larue County
Marion County
Meade County
Metcalfe County
Auditorium and gymnasium building, addition to Graded and High School at Edmonton, KY., [n.d.] - [n.d.]
Sulphur Well-Center Road, [n.d.] - [n.d.]
Cave Ridge-Echo Road, [n.d.] - [n.d.]
Cedar Flat-Randolph Road, [n.d.] - [n.d.]
Nelson County
Shelby County
Bridge constructed on Rattletrap Road, [n.d.] - [n.d.]
Narrow gauge bridge across Clear Creek, [n.d.] - [n.d.]
Typical of structures being constructed on County road program, [n.d.] - [n.d.]
Washington Street, Shelbyville, KY., [n.d.] - [n.d.]
Spencer County
Taylor County
Washington County
Gymnasium constructed in connection with Graded and High school, Mackville, KY., [n.d.] - [n.d.]
Walnut Street concrete bridge, [n.d.] - [n.d.]
High Street, Springfield, KY, [n.d.] - [n.d.]
Battle Road, [n.d.] - [n.d.]
Each woman in the Training Center makes a notebook with samples showing various stitches, tucks, pleats, rugs, etc., [n.d.] - [n.d.]
238,626 garments with monetary value of $161,702.54 made to date in these 18 counties., [n.d.] - [n.d.]
33 1/3 " of the women now doing efficient work in training work centers of the state had never before sewn, [n.d.] - [n.d.]
Waste-baskets and lamp shades made from discarded boxes, bulletin board from burlap sacks, storage shelves from orange crates, were made by these women in addition to their regular sewing, [n.d.] - [n.d.]
62-year-old woman, totally deaf, busy making toys on WPA recreation project, [n.d.] - [n.d.]
Children are taught fundamentals of checker-playing by WPA recreation leaders for city-wide tournament, [n.d.] - [n.d.]
WPA provides teachers for boys in CCC camps, [n.d.] - [n.d.]
WPA worker typing old historical records, [n.d.] - [n.d.]
A nourishing lunch and regular rest period are responsible for gain in weight of children in WPA Nursery Schools, [n.d.] - [n.d.]
Album 6
Jefferson County
Cement bound macadam road construction. Shawnee Park, Louisville, KY., [n.d.] - [n.d.]
Addition to Bowman Field Administration Building, Louisville, KY, [n.d.] - [n.d.]
Yacht Basin, Louisville, KY., [n.d.] - [n.d.]
New Service Building, Belknap Campus, University of Louisville, [n.d.] - [n.d.]
Concrete roadway, Waverly Hills Sanitarium, Louisville, KY., [n.d.] - [n.d.]
Swimming pool, equipment and shelter house at Cypress and Algonquin Parkway Playground, Louisville, KY., [n.d.] - [n.d.]
Eastern Parkway at Preston Street, Louisville, KY., [n.d.] - [n.d.]
Asphaltic retread surface, [n.d.] - [n.d.]
Asphaltic retread surface, [n.d.] - [n.d.]
Asphaltic retread surface, [n.d.] - [n.d.]
Completed section of Eastern Parkway at entrance to Cherokee Park, Louisville, KY, [n.d.] - [n.d.]
City-wide street improvement program, Louisville, KY., [n.d.] - [n.d.]
Asphaltic retread surface, [n.d.] - [n.d.]
Supervised play given to children of pre-school age in WPA Nursery schools, [n.d.] - [n.d.]
64,062 garments with monetary value of $53,385.17 made to date in Jefferson County, [n.d.] - [n.d.]
Six unskilled colored women report for work at the Training Work Center, [n.d.] - [n.d.]
Training Work Centers employing 6,236 relief women are efficient because of accurate instructions and close supervision of details, [n.d.] - [n.d.]
University of Louisville seal painted by artist of Federal Art Project, [n.d.] - [n.d.]
WPA laboratory technicians aid in malaria control on State Board of Health, [n.d.] - [n.d.]
WPA workers are trained in use of Hollerith Machine in recording diseases on State Board of Health Project, [n.d.] - [n.d.]
Hundreds of children have benefited through the diphtheria immunization project, [n.d.] - [n.d.]
WPA musicians collected mountain ballads in isolated sections and copy the music for those old Anglo-Saxon phrases, [n.d.] - [n.d.]
Permanent record systems have been made by workers on the WPA Juvenile Delinquency Study, [n.d.] - [n.d.]
Bench work. WPA Recreation workers making useful articles from discarded prune boxes, [n.d.] - [n.d.]
Album 7
Floyd County
Two-room stone school building at Cracker, KY., [n.d.] - [n.d.]
Section of city-wide street improvement project, Prestonsburg, KY., [n.d.] - [n.d.]
Section of county-wide road improvement project, [n.d.] - [n.d.]
Section of stone retaining wall on street project, Prestonsburg, KY., [n.d.] - [n.d.]
Johnson County
Native stone library building at Paintsville, KY., [n.d.] - [n.d.]
Gymnasium and auditorium at Van Lear, KY., [n.d.] - [n.d.]
Section of county-wide road improvement project, [n.d.] - [n.d.]
Quarry, part of county-wide road improvement project, [n.d.] - [n.d.]
Knott County
Yellow Creek School constructed of native stone, Sassafras, KY., [n.d.] - [n.d.]
Native stone County Jail, Hindman, KY., [n.d.] - [n.d.]
Carr Creek school building under construction, [n.d.] - [n.d.]
Montgomery Creek Road, [n.d.] - [n.d.]
Letcher County
Brick addition to County Courthouse, [n.d.] - [n.d.]
Brick addition to Jenkins Graded School, Jenkins, KY., [n.d.] - [n.d.]
Four-room frame addition to graded school building at McRoberts, KY., [n.d.] - [n.d.]
Concrete street construction, Whitesburg, KY., [n.d.] - [n.d.]
Magoffin County
Martin County
Perry County
A ten-room brick school building at Hazard, KY., [n.d.] - [n.d.]
Masonry dam, part of Boy Scout Camp, [n.d.] - [n.d.]
Eight-room stone school building, including gymnasium at Ary, KY., [n.d.] - [n.d.]
Suspension bridge across the Kentucky River at Hazard, KY., [n.d.] - [n.d.]
Pike County
Native stone, colored school building constructed at Pikeville, KY., [n.d.] - [n.d.]
Constructed of native stone, eight-room elementary school building at Shelbiana, KY., [n.d.] - [n.d.]
Section of county-wide road improvement project, [n.d.] - [n.d.]
Constructing vehicle suspension bridge, length 390 feet between towers, [n.d.] - [n.d.]
Baby outfitted in garments made in Training Work Center. (Baby blanket made from cutting scraps, [n.d.] - [n.d.]
Wool furnished Kentucky by Federal Surplus Relief Corporation was processed on WPA comforter projects by relief women and made into warm comforters, [n.d.] - [n.d.]
137,489 garments with monetary value of $92,131.24 made to date in these eight counties, [n.d.] - [n.d.]
Mother of two children (husband is tubercular and bed ridden) supports her family and buys necessary medical supplies with her WPA wages, [n.d.] - [n.d.]
Typical mountain worker operating loom at Training Work Center, [n.d.] - [n.d.]
Toy band organized on WPA Recreation Project, [n.d.] - [n.d.]
Pre-school children from needy families attend WPA Nursery School, [n.d.] - [n.d.]
Scraps from Training Work Centers used to make toys on WPA Recreation Project, [n.d.] - [n.d.]
Album 8
Bourbon County
One of four painted school buildings in Paris, KY., [n.d.] - [n.d.]
Walks constructed in Park in Paris, KY., [n.d.] - [n.d.]
Main Street surfaced with concrete, Paris, Ky., [n.d.] - [n.d.]
Entrance driveway to County Poor Farm, [n.d.] - [n.d.]
Boyle County
Casey County
Construction of gymnasium at Liberty High School, Liberty, KY., [n.d.] - [n.d.]
Construction of Middleburg High School, Middleburg, KY., [n.d.] - [n.d.]
Construction of Yosemite-Gilpin Road, [n.d.] - [n.d.]
Construction of Phil-Highway #80, [n.d.] - [n.d.]
Section of road repaired on county-wide road improvement project, [n.d.] - [n.d.]
Clark County
Asphaltic paved street with concrete curbs and gutters, Winchester, KY., [n.d.] - [n.d.]
Rock asphalt paved street, Winchester, KY., [n.d.] - [n.d.]
Graded, drained and surfaced farm-to-market road, [n.d.] - [n.d.]
Limestone paving and concrete bridge on Goose Creek Road, [n.d.] - [n.d.]
Estill County
Bridge constructed in connection with farm-to-market road, [n.d.] - [n.d.]
Reconstructed bridge to raise above high-water mark, [n.d.] - [n.d.]
Reconstructed bridge on Wagersville Road, [n.d.] - [n.d.]
Concrete curb, gutters and asphaltic paved city streets, Irvine, KY., [n.d.] - [n.d.]
Graded, drained and surfaced farm-to-market road, [n.d.] - [n.d.]
Fayette County
Briar Hill School, [n.d.] - [n.d.]
Squires Road, [n.d.] - [n.d.]
Second Street, paved with concrete, Lexington, KY., [n.d.] - [n.d.]
Concrete press box, part of improvement to stadium, University of Kentucky, [n.d.] - [n.d.]
Franklin County
Garrard County
Typical draining structure on County master road project, [n.d.] - [n.d.]
Kirksville Road, [n.d.] - [n.d.]
Section of road surfaced with black top, [n.d.] - [n.d.]
Section of county-wide road improvement project, [n.d.] - [n.d.]
Section of county-wide road improvement project, [n.d.] - [n.d.]
Henry County
Bridge constructed on Point Pleasant-Franklenton Road, [n.d.] - [n.d.]
Grade, drain and surface Drennon Springs Road, [n.d.] - [n.d.]
Reconstruction and macadam surfacing of Harper's Ferry Road, [n.d.] - [n.d.]
Street construction, Newcastle, KY., [n.d.] - [n.d.]
Jessamine County
One-room school at Marble Creek, [n.d.] - [n.d.]
Retaining walls typical of those constructed on County road program, [n.d.] - [n.d.]
Typical section of city-wide street improvement project, Nicholasville, KY., [n.d.] - [n.d.]
Rock quarry, part of county-wide road improvement project, [n.d.] - [n.d.]
Lee County
Graded, drained and surfaced road from Highway #11 to Fixer, [n.d.] - [n.d.]
Graded, drained and surfaced Pine Grove Road, [n.d.] - [n.d.]
Road to Yellow Rock Quarry, [n.d.] - [n.d.]
Graded, drained and surfaced Ida May Hiedelberg Road, [n.d.] - [n.d.]
Lincoln County
Improvement to Hustonville Public School, [n.d.] - [n.d.]
Combination auditorium and gymnasium at Crab Orchard High School, Crab Orchard, KY., [n.d.] - [n.d.]
Gymnasium construction at Waynesburg High School, Waynesburg, KY., [n.d.] - [n.d.]
Construction of Mason Gap Road, [n.d.] - [n.d.]
Madison County
Outdoor amphitheater, Eastern State Teachers College, [n.d.] - [n.d.]
Reconstructing and enlarging dam at city reservoir, Richmond, KY., [n.d.] - [n.d.]
Concrete curbs, gutters and paving of campus driveway, Eastern State Teachers College, [n.d.] - [n.d.]
Widened and surfaced with water--bound macadam Walnut Meadow Pike, [n.d.] - [n.d.]
Mercer County
Kirkwood Bridge, [n.d.] - [n.d.]
Forsythe Mill Bridge, [n.d.] - [n.d.]
Bohon Bridge, [n.d.] - [n.d.]
Unity Pike, [n.d.] - [n.d.]
Completed section of Whitenack Lane, [n.d.] - [n.d.]
Owen County
Improved County Courthouse, [n.d.] - [n.d.]
Four-room native stone school building under construction at New Columbus, KY., [n.d.] - [n.d.]
Improvement of road typical of work done on County road program, [n.d.] - [n.d.]
Poplar Grove-Glencoe Road, [n.d.] - [n.d.]
Scott County
Concrete stand-pipe, part of Stamping Ground water system project, [n.d.] - [n.d.]
College Street, Georgetown, KY., [n.d.] - [n.d.]
Section of traffic bound Macadam road, [n.d.] - [n.d.]
Water-bound macadam road, [n.d.] - [n.d.]
Woodford County
Constructing sanitary sewer in Versailles, KY., [n.d.] - [n.d.]
Concrete bridge with stone abutments, part of Watts Ferry Road, [n.d.] - [n.d.]
Typical section of county-wide road improvement project, [n.d.] - [n.d.]
Typical section of county-wide road improvement project, [n.d.] - [n.d.]
Public library books donated locally to be mended by WPA workers, [n.d.] - [n.d.]
Valuable health records are catalogued by WPA clerks on Health Project, [n.d.] - [n.d.]
WPA Recreation leader gives instructions at County high schools in musical games and dancing, [n.d.] - [n.d.]
Lunch at WPA Nursery School often constitutes the child's most nourishing meal of the day, [n.d.] - [n.d.]
WPA teacher holds evening shorthand class, [n.d.] - [n.d.]
Children wearing garments made in Training Work Center. Toys made from scraps, [n.d.] - [n.d.]
Scraps used to weave rugs typical of the economy learned by these women in Training Work Center, [n.d.] - [n.d.]
Winchester - The best garment made daily is placed on the bulletin board in this workroom, [n.d.] - [n.d.]
169,039 garments with monetary value of $124,184.27 made to date in these 17 counties, [n.d.] - [n.d.]
The old mansion "Castlewood in Fayette County is the location for this Training Work Center, [n.d.] - [n.d.]
Album 9
Allen County
Consolidated school constructed at Petroleum, KY., [n.d.] - [n.d.]
Brick veneer school under construction at Mt. Zion, KY., [n.d.] - [n.d.]
Construction of concrete water reservoir, Scottsville, KY., [n.d.] - [n.d.]
East Walnut Street, Scottsville, KY., [n.d.] - [n.d.]
Butler County
Brick veneered school, gymnasium and auditorium building, Morgantown, KY., [n.d.] - [n.d.]
Completed section of County road project, [n.d.] - [n.d.]
Completed section of County road project, [n.d.] - [n.d.]
Farm-to-market road under construction, [n.d.] - [n.d.]
Daviess County
Freeman Street, Owensboro, KY., [n.d.] - [n.d.]
Ninth Street, Owensboro, KY., [n.d.] - [n.d.]
Extending Owensboro (Paducah) sewer system, [n.d.] - [n.d.]
McCreary Street, Owensboro, KY., [n.d.] - [n.d.]
Drained and surfaced with asphalt, Veach Road, [n.d.] - [n.d.]
Edmonson County
Auditorium and gymnasium addition to school at Sunfish, Ky., [n.d.] - [n.d.]
Liberty Road, [n.d.] - [n.d.]
Rocky Hill Road, [n.d.] - [n.d.]
Arthur Road, [n.d.] - [n.d.]
Grading County road, [n.d.] - [n.d.]
Henderson County
Hopkins County
Municipal Building and Fire Hall, Madisonville, KY., [n.d.] - [n.d.]
Reinforced concrete stadium under construction, Madisonville, KY., [n.d.] - [n.d.]
Excavating for new city hospital building, Madisonville, KY/, [n.d.] - [n.d.]
Logan County
McLean County
Construction of school building, Sacramento, KY., [n.d.] - [n.d.]
Foundation of plant for the manufacture of concrete pipe for work on County road program, [n.d.] - [n.d.]
Road improvement, typical of County road program, [n.d.] - [n.d.]
Muhlenberg County
City Hospital nearing completion, [n.d.] - [n.d.]
Health Building, Greenville, KY., [n.d.] - [n.d.]
Swimming pool and bath house under construction in Central Park, Central City, KY., [n.d.] - [n.d.]
Grandstand and athletic field in Central Park, Central City, KY., [n.d.] - [n.d.]
Reconstructing "A" Street, Central City, KY., [n.d.] - [n.d.]
Concrete culvert constructed as part of county Blanket Road Project, [n.d.] - [n.d.]
Ohio County
City Hall and Fire Station, Hartford, KY., [n.d.] - [n.d.]
Pump House and Imhoff Tank, part of sanitary sewer project, Beaver Dam, KY., [n.d.] - [n.d.]
Church Street, Hartford, KY., [n.d.] - [n.d.]
Completed section of County road, [n.d.] - [n.d.]
Simpson County
Todd County
Gymnasium building, Trenton, KY., [n.d.] - [n.d.]
Concrete culvert typical of road improvement program, [n.d.] - [n.d.]
Completed section of farm-to-market road, [n.d.] - [n.d.]
Daysville-Allentown Road, [n.d.] - [n.d.]
Union County
Recreational Building, Morganfield, KY., [n.d.] - [n.d.]
Swimming pool under construction, part of park improvement project, Morganfield, KY., [n.d.] - [n.d.]
Humphrey-McFall Road, [n.d.] - [n.d.]
Givens-Highland Bridge Road, [n.d.] - [n.d.]
Quarrying operation in connection with county Blanket Road Program, [n.d.] - [n.d.]
Warren County
Surfacing Eleventh Street, Bowling Green. KY., [n.d.] - [n.d.]
Rock asphalt street construction, Bowling Green, KY., [n.d.] - [n.d.]
Surfacing Small House Pike, [n.d.] - [n.d.]
Airport Road, [n.d.] - [n.d.]
Surface with crushed stone, Richmond-Rockfield Road, [n.d.] - [n.d.]
Webster County
Concrete stadium, Clay, KY., [n.d.] - [n.d.]
Wanamaker Road, [n.d.] - [n.d.]
Section of road graded, drained and surfaced, [n.d.] - [n.d.]
Tilden-Poole Road, [n.d.] - [n.d.]
Part of 2,263 children, ages 2 to 5, who attend WPA nursery schools, [n.d.] - [n.d.]
Typical WPA Training Work Center where relief women enjoy working for their livelihood, [n.d.] - [n.d.]
In this Training Work Center, these women learn to make "something from nothing." Waste baskets from discarded packing boxes, [n.d.] - [n.d.]
This old colored woman who had never learned to sew before assigned to work in the Training Work Center, now makes all the clothing worn by her family, [n.d.] - [n.d.]
One of the first lessons requisitions in Government Training Work Centers - learning to cut economically, [n.d.] - [n.d.]
Clean, starched smock worn by these WPA workers were their first accomplishments. Each woman made her own smock., [n.d.] - [n.d.]
234,030 garments with monetary value of #170,288.30 made to date in these 15 counties, [n.d.] - [n.d.]
Rehearsing a play. Children given training on Recreation Project in pantomime, impromptu dramatics and play production, [n.d.] - [n.d.]
WPA provides 200 workers on state-wide health projects. These workers compile statistical data from health records., [n.d.] - [n.d.]
General
Scrapbook
Adair County
Portrait of an unidentified man, [n.d.] - [n.d.]
Columbia Sewer Project, 1936/4/23 - 1937/2/22
Columbia Sewer Project, 1936/4/23 - 1937/2/22
Columbia Gymnasium, 1935/12/9 - 1936/12/21
Columbia Gymnasium, 1935/12/9 - 1936/12/21
County Judge W. G. Shepherd, 1942, 1942
Columbia WPA Warehouse, 1938/12/12 - 1939/8/31
Columbia street project constructed by WPA, 1941, 1941
Columbia street project constructed by WPA, 1942, 1942
Columbia street project constructed by WPA, 1942, 1942
Allen County
Retaining wall in Scottsville built by WPA, [n.d.] - [n.d.]
County quarry operated by WPA, [n.d.] - [n.d.]
Scottsville street and sidewalk built by WPA, [n.d.] - [n.d.]
Scottsville water system, 1936/8/23 - 1937/10/1
Scottsville street constructed by WPA, [n.d.] - [n.d.]
Walnut Street in Scottsville constructed by WPA, [n.d.] - [n.d.]
Old Allen County Almshouse, [n.d.] - [n.d.]
New Allen County Almshouse built by WPA, [n.d.] - 1937/12/21
Petroleum School constructed by WPA, 1936/4/1 - 1936/12/5
Bridge and road constructed by WPA, 1941, 1941
Bridge and road constructed by WPA, 1941, 1941
Scottsville City High School, 1940/8/22 - 1941/12/6
Scottsville City High School, 1940/8/22 - 1941/12/6
Erecting trusses for Scottsville City High School, 1940/8/22 - 1941/12/6
Scottsville City High School, 1940/8/22 - 1941/12/6
Scottsville City High School, 1940/8/22 - 1941/12/6
Scottsville City High School, 1940/8/22 - 1941/12/6
Anderson County
Western High School Gymnasium, 1935/11/4 - 1937/5/28
Western High School Gymnasium, 1935/11/4 - 1937/5/28
Sand Spring School, 1938/10/3 - 1939/10/6
Lawrenceburg School, 1938/10/3 - 1939/10/2
Highway and railroad bridge over Kentucky River at Tyrone, Ky., 1940, 1940
Highway and railroad bridge over Kentucky River at Tyrone, Ky., 1940, 1940
Highway and railroad bridge over Kentucky River at Tyrone, Ky., 1940, 1940
Lawrenceburg Disposal Plant, 1937/7/14 - [n.d.]
Lawrenceburg Disposal Plant, 1937/7/14 - [n.d.]
Lawrenceburg Disposal Plant, 1937/7/14 - [n.d.]
Lawrenceburg Disposal Plant, 1937/7/14 - [n.d.]
Lawrenceburg Disposal Plant, 1937/7/14 - [n.d.]
Lawrenceburg Disposal Plant, 1937/7/14 - [n.d.]
Lawrenceburg Disposal Plant, 1937/7/14 - [n.d.]
Lawrenceburg Disposal Plant, 1937/7/14 - [n.d.]
Clifton road construction in Lawrenceburg, 1942, 1942
County road construction in Anderson County, 1942, 1942
Lawrenceburg Sewer construction by WPA, 1942, 1942
Broadway Street construction in Lawrenceburg, 1942, 1942
Woodford Street construction in Lawrenceburg, 1942, 1942
Bond's Mill Bridge constructed by WPA, 1942, 1942
Broadway Street construction in Lawrenceburg, 1942, 1942
Downtown street construction in Lawrenceburg, 1942, 1942
Lawrenceburg Sewer construction by WPA, 1942, 1942
Lawrenceburg Quarry, 1942, 1942
Lawrenceburg Quarry, 1942, 1942
Ballard County
Barlow School, 1935/2/27 - 1938/10/25
Barlow School, 1935/2/27 - 1938/10/25
Kevil School Gymnasium, 1938/8/29 - 1939/2/20
La Center Street constructed by WPA, [n.d.] - [n.d.]
Drainage ditch constructed by WPA, [n.d.] - [n.d.]
County Judge R.E. Hall, 1942, 1942
Barren County
Glasgow Water Works Pump Station and Filtration Plant, 1937/8/19 - 1939/4/18
Glasgow Water Works Pump Station and Filtration Plant, 1937/8/19 - 1939/4/18
Glasgow Water Works Pump Station and Filtration Plant, 1937/8/19 - 1939/4/18
Barren County WPA Warehouse, 1939/10/19 - 1941/6/4
Crusher at Glasgow Quarry, [n.d.] - [n.d.]
Power unit, crusher and bin at Glasgow Quarry, [n.d.] - [n.d.]
Temple Hill School, 1938/9/7 - 1939/12/5
Temple Hill School, 1938/9/7 - 1939/12/5
Temple Hill School, 1938/9/7 - 1939/12/5
Storage lot in rear of WPA warehouse in Glasgow, 1941, 1941
Storm drainage constructed by WPA, [n.d.] - [n.d.]
Sidewalks in Glasgow constructed by WPA, [n.d.] - [n.d.]
Golf course at Glasgow, 1937/1/22 - 1937/7/23
Merry Oaks Road constructed by WPA, [n.d.] - [n.d.]
Mount Herman Road constructed by WPA, [n.d.] - [n.d.]
Bath County
Salt Lick School, 1939/1/3 - 1940/5/8
Salt Lick School, 1939/1/3 - 1940/5/8
Salt Lick School, 1939/1/3 - 1940/5/8
Sharpsburg Gymnasium, 1935/11/29 - 1937/5/24
Interior of Sharpsburg Gymnasium, 1935/11/29 - 1937/5/24
Bethel School, 1939/4/24 - 1940/4/17
Bethel School, 1939/4/24 - 1940/4/17
Licking River Road constructed by WPA, [n.d.] - [n.d.]
Owingsville pavement construction by WPA, 1940, 1940
Mormon Church Road near Owingsville constructed by WPA, [n.d.] - [n.d.]
Stulltown Road constructed by WPA, [n.d.] - [n.d.]
Bell County
Pineville Courthouse, 1941, 1941
Pineville Jail, City Hall, and Fire Station, 1938/7/18 - 1940/12/30
Pineville Jail, City Hall, and Fire Station, 1938/7/18 - 1940/12/30
Pineville Jail, City Hall, and Fire Station, 1938/7/18 - 1940/12/30
Pineville Jail, City Hall, and Fire Station, 1938/7/18 - 1940/12/30
Pineville Jail, City Hall, and Fire Station, 1938/7/18 - 1940/12/30
Bartlett State Park Spillway in Middlesboro, 1935/11/14 - 1937/3/27
Footbridge at Bartlett State Park in Middlesboro, 1935/11/14 - 1937/3/27
Pavilion at Bartlett State Park in Middlesboro, 1935/11/14 - 1937/3/27
Lodge at Bartlett State Park in Middlesboro, 1935/11/14 - 1937/3/27
Bathouse and outdoor oven at Bartlett State Park in Middlesboro, 1935/11/14 - 1937/3/27
Bathouse and outdoor oven at Bartlett State Park in Middlesboro, 1935/11/14 - 1937/3/27
Pineville Swimming Pool, 1937/9/29 - 1938/5/13
Pineville Swimming Pool, 1937/9/29 - 1938/5/13
Pineville Swimming Pool, 1937/9/29 - 1938/5/13
Lone Jack Gymnasium, 1936/9/21 - 1937/11/13
Lone Jack Gymnasium, 1936/9/21 - 1937/11/13
Hutch School, 1935/12/2 - 1936/8/21
Fonde School, 1936/2/14 - 1937/6/2
Pineville Stadium construction, 1936/8/10 - 1937/7/13
Pineville Stadium construction, 1936/8/10 - 1937/7/13
Balhan School construction, 1936/2/14 - 1937/8/6
Culvert constructed by WPA on Amesbury Street in Middlesboro, [n.d.] - [n.d.]
Bridge abutment constructed by WPA, [n.d.] - [n.d.]
Fonde Road constructed by WPA, [n.d.] - [n.d.]
Bell County Flood control Project, [n.d.] - [n.d.]
Drainage work by WPA on Yellow Creek, [n.d.] - [n.d.]
Little Clear Creek Road constructed by WPA, [n.d.] - [n.d.]
WPA community Sanitation Project (Outhouses), [n.d.] - [n.d.]
Retaining wall constructed by WPA in Middlesboro, 1941, 1941
WPA sewer construction project, [n.d.] - [n.d.]
WPA sewer construction project, [n.d.] - [n.d.]
Middlesboro Golf Course (2nd oldest golf course in United States), [n.d.] - [n.d.]
Middlesboro Golf Course (2nd oldest golf course in United States), [n.d.] - [n.d.]
Middlesboro Golf Course (2nd oldest golf course in United States), [n.d.] - [n.d.]
Main Street in Middlesboro, 1941, 1941
Middlesboro Airport, 1936/3/14 - 1936/11/13
Boone County
Beaver Road constructed by WPA, [n.d.] - [n.d.]
Beaver Road constructed by WPA, [n.d.] - [n.d.]
Excavation of Indian Burial Mound during archeological survey project, [n.d.] - [n.d.]
Excavation of Indian Burial Mound during archeological survey project, [n.d.] - [n.d.]
Archeological Survey Project shack, [n.d.] - [n.d.]
Detail of curb of Defense Highway Project #25 out of Florence, Ky., [n.d.] - [n.d.]
Defense Highway Project #25, 1941, 1941
Curb construction on Defense Highway Project #25, 1941, 1941
Defense Highway Project #25, 1941, 1941
Bourbon County
Master Sewer Project, Paris, Ky., [n.d.] - [n.d.]
Master Sewer Project along Houston Creek, Paris, Ky., [n.d.] - [n.d.]
City Park, Paris, Ky., [n.d.] - [n.d.]
Main Street in Paris, Ky., constructed under Master Street Project, [n.d.] - [n.d.]
Houston Avenue Bridge, Paris, Ky., 1937/10/11 - 1938/6/9
Millersburg Military Institute sign, [n.d.] - [n.d.]
WPA sewer construction project in Paris, Ky., [n.d.] - [n.d.]
WPA sewer construction project in Paris, Ky., [n.d.] - [n.d.]
WPA sidewalk construction in Paris, Ky., [n.d.] - [n.d.]
Boyd County
Boyd County Sediment Basin, Ashland, Ky., 1939/7/29 - 1939/12/13
Boyd County Sediment Basin, Ashland, Ky., 1939/7/29 - 1939/12/13
Boyd County Sediment Basin, Ashland, Ky., 1939/7/29 - 1939/12/13
Boyd County Sediment Basin, Ashland, Ky., 1939/7/29 - 1939/12/13
Boyd County Sediment Basin, Ashland, Ky., 1939/7/29 - 1939/12/13
Boyd County Sediment Basin, Ashland, Ky., 1939/7/29 - 1939/12/13
Boyd County Sediment Basin, Ashland, Ky., 1939/7/29 - 1939/12/13
Boyd County Sediment Basin, Ashland, Ky., 1939/7/29 - 1939/12/13
Boyd County Sediment Basin, Ashland, Ky., 1939/7/29 - 1939/12/13
Ashland Public Library, 1935/11/6 - [n.d.]
Central Park Pool, Ashland, 1935/12/6 - 1936/5/27
Ashland Stadium, 1936/1/29 - 1937/7/28
Ashland Stadium, 1936/1/29 - 1937/7/28
Cannonsburg School, 1941/9/17 - 1942/2/3
Cannonsburg School, 1941/9/17 - 1942/2/3
Fairview Gymnasium construction, Ashland, 1938/7/29 - 1939/12/23
Fairview Gymnasium, Ashland, 1938/7/29 - 1939/12/23
Fairview Gymnasium, Ashland, 1938/7/29 - 1939/12/23
476 surplus wheelbarrows at Ashland, 1940, 1940
Concrete pipe in back of new Ashland WPA office building, 1940, 1940
Concrete pipe made by WPA, Ashland, 1940, 1940
Catlettsburg playground and bleachers, 1937/10/11 - 1938/6/28
Birdseye view of Ashland taken from Water Reservoir, 1940, 1940
Catlettsburg District Employment Office, [n.d.] - [n.d.]
Pouring foundation for new Ashland WPA office building, 1940/5/29 - 1941/9/30
Ashland WPA office building construction, 1940/5/29 - 1941/9/30
New Ashland WPA office building on right, old warehouse on left, 1940/5/29 - 1941/9/30
Ashland Water Tank excavation, 1938/12/14 - 1941/9/30
Ashland Water Tank excavation, 1938/12/14 - 1941/9/30
Interior construction of Ashland Water Tank, 1938/12/14 - 1941/9/30
Ashland Water Tank excavation, 1938/12/14 - 1941/9/30
Ashland Water Tank construction, 1938/12/14 - 1941/9/30
Ashland Water Tank construction, 1938/12/14 - 1941/9/30
Interior and exterior construction of Ashland Water Tank, 1938/12/14 - 1941/9/30
Ashland Water Tank construction, 1938/12/14 - 1941/9/30
Interior construction of Ashland Water Tank, 1938/12/14 - 1941/9/30
Ashland Water Tank construction, 1938/12/14 - 1941/9/30
Inside of Ashland Water Tank (over 2 million gallon capacity), 1938/12/14 - 1941/9/30
Ashland Water Tank construction built into highest hill near Ashland, 1938/12/14 - 1941/9/30
Steel laid for reinforcing slab over Ashland Water Tank, 1938/12/14 - 1941/9/30
Daniel's Fork Road constructed by WPA, [n.d.] - [n.d.]
Retaining wall along railroad tracks in Ashland built by WPA, [n.d.] - [n.d.]
Steel arch on Garner Road built by WPA, [n.d.] - [n.d.]
Concrete street in Catlettsburg constructed by WPA, [n.d.] - [n.d.]
Concrete street in Ashland constructed by WPA, [n.d.] - [n.d.]
Shopic's Creek Road constructed by WPA, [n.d.] - [n.d.]
Concrete paving for Cemetery Road, [n.d.] - [n.d.]
Cannonsburg Road constructed by WPA, [n.d.] - [n.d.]
Boyd County WPA Quarry, [n.d.] - [n.d.]
Deep Ashland sewer under construction, [n.d.] - [n.d.]
Deep Ashland sewer under construction, [n.d.] - [n.d.]
Ashland Fish Hatcheries, 1936/1/19 - 1936/7/28
Fairview Gymnasium, 1938/7/29 - 1939/12/23
Boyle County
WPA District Warehouse and Office, Danville, [n.d.] - [n.d.]
WPA District Warehouse and Office, Danville, [n.d.] - [n.d.]
WPA District Warehouse and Office, Danville, [n.d.] - [n.d.]
Ephraim McDowell House, Danville, restored by WPA, 1936/7/27 - 1938/11/23
State Hospital for Insane (Soldiers' Hospital 1942) built by PWA, [n.d.] - [n.d.]
Boyle County School, Danville, 1938/2/7 - 1939/2/11
Boyle County School, Danville, 1938/2/7 - 1939/2/11
Office at County quarry near Perryville, 1939/4/12 - 1939/8/5
County quarry near Perryville, 1940, 1940
Crushed stone stockpiled in Danville, 1941, 1941
Constitution Square in Danville built by State Park Commission, [n.d.] - [n.d.]
Forkland Gymnasium, 1939/5/22 - 1941/1/23
Forkland Gymnasium, 1939/5/22 - 1941/1/23
Flower beds in front of WPA Warehouse and Office, Danville, 1941, 1941
Road construction in Boyle County, 1941, 1941
Road construction looking toward entrance leading to Gwinn Island, [n.d.] - [n.d.]
Road being built into Gwinn Island Camp, [n.d.] - [n.d.]
Mackville Road constructed by WPA, 1941, 1941
Mackville Road constructed by WPA, 1941, 1941
Blacktopped road in Boyle County, [n.d.] - [n.d.]
County road constructed by WPA, [n.d.] - [n.d.]
Stony Point Quarry operated by WPA, 1941, 1941
Perryville Dynamite Magazine, 1941, 1941
Mackville Road and Bridge constructed by WPA, 1941, 1941
Mackville Road and Bridge constructed by WPA, 1941, 1941
College Street, Danville, constructed by WPA, 1941, 1941
Danville sewers under construction by WPA, 1941, 1941
Danville sewers under construction by WPA, 1941, 1941
Danville Disposal Plant, December 18, 1942, 1940/11/25 - 1942/6/27
Danville Disposal Plant, December 18, 1942, 1940/11/25 - 1942/6/27
Danville Disposal Plant, December 18, 1942, 1940/11/25 - 1942/6/27
Danville Disposal Plant, December 18, 1942, 1940/11/25 - 1942/6/27
Danville Disposal Plant, December 18, 1942, 1940/11/25 - 1942/6/27
Excavation for Danville Disposal Plant, 1940/11/25 - 1942/6/27
Concrete work at Danville Disposal Plant, 1940/11/25 - 1942/6/27
Concrete work at Danville Disposal Plant, 1940/11/25 - 1942/6/27
Two of 110 ft. sprinkling basins at Danville Disposal Plant, 1940/11/25 - 1942/6/27
Inside 110 ft sprinkling basin at Danville Disposal Plant, 1940/11/25 - 1942/6/27
Dumping filter rock in sprinkling basin at Danville Disposal Plant, 1940/11/25 - 1942/6/27
110 ft. sprinkling basin at Danville Disposal Plant, 1940/11/25 - 1942/6/27
Blacktopped road leading to Danville Disposal Plant, 1940/11/25 - 1942/6/27
Looking toward 110 ft sprinkling basin at Danville Disposal Plant, 1940/11/25 - 1942/6/27
Danville Disposal Plant building construction and scaffolding, 1940/11/25 - 1942/6/27
Twin 110 ft sprinkling basins at Danville Disposal Plant, 1940/11/25 - 1942/6/27
One 110 ft sprinkling basin at Danville Disposal Plant, 1940/11/25 - 1942/6/27
Danville Disposal Plant construction, 1940/11/25 - 1942/6/27
Danville Disposal Plant construction, 1940/11/25 - 1942/6/27
View of one 110 ft sprinkling basin at Danville Disposal Plant, 1940/11/25 - 1942/6/27
Danville Disposal Plant construction, 1940/11/25 - 1942/6/27
Danville Disposal Plant construction, 1940/11/25 - 1942/6/27
Danville Disposal Plant construction, 1940/11/25 - 1942/6/27
View of 110 ft sprinkling basin at Danville Disposal Plant, 1940/11/25 - 1942/6/27
Twin 110 ft sprinkling basins at Danville Disposal Plant, 1940/11/25 - 1942/6/27
Danville Scrap Pile, September, 1942, 1942
Danville Scrap Pile, September, 1942, 1942
Danville Scrap Pile, September, 1942, 1942
Danville Scrap Pile, September, 1942, 1942
Bracken County
Sewer construction in Augusta, 1941, 1941
Riley Mill Road constructed by WPA, 1941, 1941
Culvert on Dutch Ridge Road, Brooksville, constructed by WPA, [n.d.] - [n.d.]
Brooksville Courthouse, 1941, 1941
Bridge on Vermillion Road constructed by WPA, [n.d.] - [n.d.]
Bridge on Vermillion Road constructed by WPA, [n.d.] - [n.d.]
Breathitt County
Breathitt County Jail in Jackson, Ky., 1938/6/3 - 1940/2/24
Breathitt County Jail in Jackson, Ky., 1938/6/3 - 1940/2/24
Breathitt County Jail in Jackson, Ky., 1938/6/3 - 1940/2/24
County School at Big Rock, 1935/11/5 - 1937/4/24
Quarrying bridge stone along new grade and drain project, [n.d.] - [n.d.]
Jackson Courthouse, "Scene of murder trials galore," 1941, 1941
Grade and drain project, [n.d.] - [n.d.]
School playground in Jackson, Ky., 1936/1/24 - 1939/5/4
Road work, [n.d.] - [n.d.]
Floyd Fugate and his team of oxen at Hardshell, Ky., 1941, 1941
Floyd Fugate and oxen plowing in Hardshell, Ky., 1941, 1941
Overcrowded job in Breathitt County, [n.d.] - [n.d.]
Tent used for school while building was being built, [n.d.] - [n.d.]
Log schoolhouse still in use in Breathitt County, [n.d.] - [n.d.]
Portable Crusher in road construction operation by WPA, [n.d.] - [n.d.]
Frozen Cedar Road constructed by WPA, [n.d.] - [n.d.]
Highland Road constructed by WPA, [n.d.] - [n.d.]
Quicksand Auditorium for State Experiment Station, 1940/9/12 - 1941/11/3
Quicksand Auditorium for State Experiment Station, 1940/9/12 - 1941/11/3
Quicksand Auditorium for State Experiment Station, 1940/9/12 - 1941/11/3
Quicksand Auditorium for State Experiment Station, 1940/9/12 - 1941/11/3
Quicksand Auditorium for State Experiment Station, 1940/9/12 - 1941/11/3
Quicksand Auditorium for State Experiment Station, 1940/9/12 - 1941/11/3
Bridge piers being constructed by WPA, [n.d.] - [n.d.]
Culvert under construction on County road by WPA, [n.d.] - [n.d.]
Strongfort School constructed by WPA, [n.d.] - [n.d.]
Portsmouth School, 1935/12/23 - 1937/12/2
Breathitt County WPA Warehouse in Jackson, 1938/5/2 - 1938/12/16
Rousseau School, 1938/7/2 - 1939/10/25
Breckinridge County
Imhoff Tank - Hardinsburg, 1936/1/27 - 1938/8/10
Hardinsburg sewer project, 1938/6/18 - 1940/2/27
Custer School in Hardinsburg, 1937/1/11 - 1938/1/14
Filling of ditch after construction of sewers in Hardinsburg, 1940, 1940
Scrap collected by WPA in Irvington, October, 1942, 1942
Scrap collected by WPA in Irvington, October, 1942, 1942
Bullitt County
Bridge on Hebron Lane constructed by WPA Master Road Project, [n.d.] - [n.d.]
Bridge on Hebron Lane constructed by WPA Master Road Project, [n.d.] - [n.d.]
County Courthouse in Shepherdsville, KY., 1941, 1941
Hebron Lane constructed by WPA, [n.d.] - [n.d.]
L & N Bridge across Salt River at Shepherdsville during 1940 flood, [n.d.] - [n.d.]
L & N Bridge across Salt River at Shepherdsville during 1940 flood, [n.d.] - [n.d.]
Shepherdsville flood, 1940, 1940
Shepherdsville flood, 1940, 1940
Double box culvert on Wilson Creek constructed by WPA, [n.d.] - [n.d.]
Butler County
County Judge B.H. Embry, 1942, 1942
Morgantown Courthouse, 1942, 1942
Morgantown Auditorium, 1935/8/26 - 1936/12/22
Morgantown Auditorium, 1935/8/26 - 1936/12/22
Stone masonry bridge abutment, 1940, 1940
Sign in Judge's Office in Morgantown, 1941, 1941
Grading on county road by WPA, 1941, 1941
Morgantown sewer under construction by WPA, [n.d.] - [n.d.]
Morgantown sewer under construction by WPA, [n.d.] - [n.d.]
Ferry crossing the Green River near Morgantown, September, 1942, 1942
Ferry crossing the Green River near Morgantown, September, 1942, 1942
Caldwell County
Princeton, KY. Courthouse, 1938/9/6 - 1941/2/15
Interior of courtroom in Princeton, KY. Courthouse, 1938/9/6 - 1941/2/15
Opening of Circuit Court at new Princeton, KY. Courthouse, 1938/9/6 - 1941/2/15
Princeton, KY. Courthouse under construction, 1938/9/6 - 1941/2/15
Princeton, KY. Courthouse under construction, 1938/9/6 - 1941/2/15
Princeton, KY. Courthouse after completion, 1938/9/6 - 1941/2/15
Princeton, KY. Negro High School, 1938/5/20 - 1940/11/14
Princeton, KY. Negro High School, 1938/5/20 - 1940/11/14
Princeton, KY. Negro High School, 1938/5/20 - 1940/11/14
Old Courthouse in Princeton, KY razed for new courthouse, 1938, 1938
Market Street in Princeton, KY constructed by WPA, [n.d.] - [n.d.]
Freedonia Road constructed by WPA, [n.d.] - [n.d.]
Calloway County
Murray Stadium, 1935/12/16 - 1936/3/13
Murray Stadium, 1935/12/16 - 1936/3/13
Murray Stadium, 1935/12/16 - 1936/3/13
County Judge C.A. Hail, 1942, 1942
New Concord School, 1938/8/2 - 1939/3/22
Training facility at Murray Normal School constructed by NYA, 1941, 1941
College Blvd. In Murray, KY constructed by WPA, [n.d.] - [n.d.]
College Blvd. In Murray, KY constructed by WPA, [n.d.] - [n.d.]
Street in Murray, KY constructed by WPA, [n.d.] - [n.d.]
9th Street in Murray, KY constructed by WPA, [n.d.] - [n.d.]
Macadam street in Murray, KY constructed by WPA, [n.d.] - [n.d.]
Sewer under construction in Murray, KY, [n.d.] - [n.d.]
Music and Art Building in Murray, KY, 1941/7/11 - [n.d.]
Music and Art Building in Murray, KY, 1941/7/11 - [n.d.]
Music and Art Building in Murray, KY, 1941/7/11 - [n.d.]
Music and Art Building in Murray, KY, 1941/7/11 - [n.d.]
Making concrete blocks for Music and Art Building, Murray, KY, 1941/7/11 - [n.d.]
Campbell County
1940 Flood in Newport taken from Ohio Toll Bridge, [n.d.] - [n.d.]
1940 Flood in Florence at Covington & Newport bridge, [n.d.] - [n.d.]
1940 Flood in Newport, [n.d.] - [n.d.]
1940 Flood in Newport, [n.d.] - [n.d.]
1940 Flood in Newport, [n.d.] - [n.d.]
Newport stadium and athletic field, 1937/3/24 - 1938/6/30
Newport stadium and athletic field, 1937/3/24 - 1938/6/30
Newport stadium and athletic field, 1937/3/24 - 1938/6/30
Bellvue Alley construction by WPA, [n.d.] - [n.d.]
Bellvue Alley construction by WPA, [n.d.] - [n.d.]
Silver Grove, KY pump house, 1936/10/29 - 1937/8/21
Newport sewer constructed by WPA, 1940, 1940
Newport sewer constructed by WPA, 1940, 1940
Outfall sewer in Newport, 1940, 1940
Landscaping at Newport Filter Plant and Pump Station, 1938/7/28 - 1941/6/21
Landscaping at Newport Filter Plant and Pump Station, 1938/7/28 - 1941/6/21
Landscaping at Newport Filter Plant and Pump Station, 1938/7/28 - 1941/6/21
Landscaping at Newport Filter Plant and Pump Station, 1938/7/28 - 1941/6/21
Alexandria Water Works, 1939/7/7 - 1941/6/26
Alexandria Water Works, 1939/7/7 - 1941/6/26
Alexandria Water Works, 1939/7/7 - 1941/6/26
Alexandria Water Works, 1939/7/7 - 1941/6/26
Alexandria Water Works, 1939/7/7 - 1941/6/26
Alexandria Water Works, 1939/7/7 - 1941/6/26
Alexandria Water Works Dam and Spillway, 1939/7/7 - 1941/6/26
Alexandria Water Works Dam, 1939/7/7 - 1941/6/26
Alexandria Water Works Spillway Construction, 1939/7/7 - 1941/6/26
Alexandria Water Works Filtration Beds and Pump Station, 1939/7/7 - 1941/6/26
Newport street construction by WPA, [n.d.] - [n.d.]
Woodlawn Street in Newport showing street, curb, and gutter, [n.d.] - [n.d.]
Curb and gutter construction by WPA in Newport, KY, [n.d.] - [n.d.]
Covert Run Pike constructed by WPA, [n.d.] - [n.d.]
Alexandria Pike constructed by WPA, [n.d.] - [n.d.]
Ft. Thomas, KY tennis courts constructed by WPA, [n.d.] - [n.d.]
Ft. Thomas, KY bakery constructed by WPA, [n.d.] - [n.d.]
Carlisle County
County Judge Dan S. Bishop, 1942, 1942
Arlington School and Gymnasium, 1935/11/4 - 1936/11/30
Street ready for paving in Bardwell, KY, [n.d.] - [n.d.]
Bardwell, KY scrap pile, October 1942, 1942
Bardwell, KY scrap pile, October 1942, 1942
Carroll County
Carrollton, KY sewer under construction by WPA, [n.d.] - [n.d.]
County Judge Walter S. Brim, [n.d.] - [n.d.]
Carrollton School and Gymnasium, 1938/4/21 - 1940/10/8
Carrollton School and Gymnasium, 1938/4/21 - 1940/10/8
Carrollton School and Gymnasium, 1938/4/21 - 1940/10/8
Carrollton School and Gymnasium, 1938/4/21 - 1940/10/8
Buffalo Creek Road constructed by WPA, [n.d.] - [n.d.]
Worthville Road constructed by WPA, [n.d.] - [n.d.]
Ghent School foundation construction work, 1940/10/11 - 1942/3/7
Ghent School foundation construction work, 1940/10/11 - 1942/3/7
Ghent School brickwork construction, 1940/10/11 - 1942/3/7
Ghent School brickwork construction, 1940/10/11 - 1942/3/7
Ghent School construction, 1940/10/11 - 1942/3/7
Ghent School construction, 1940/10/11 - 1942/3/7
Ghent School construction, 1940/10/11 - 1942/3/7
Ghent School construction, 1940/10/11 - 1942/3/7
Ghent School construction, 1940/10/11 - 1942/3/7
Ghent School, 1940/10/11 - 1942/3/7
Ghent School, 1940/10/11 - 1942/3/7
Cincinnati Highway Beautification Program near Carrollton, 1941, 1941
Carter County
Carter County Jail in Grayson, KY, 1935/12/2 - 1939/3/17
Carter County Jail in Grayson, KY, 1935/12/2 - 1939/3/17
Carter County Jail in Grayson, KY, 1935/12/2 - 1939/3/17
City Hall and Fire Station in Grayson, KY, 1936/10/8 - 1937/8/17
City Hall and Fire Station in Grayson, KY, 1936/10/8 - 1937/8/17
NYA City Hall and Jail in Pineville, KY, 1941, 1941
Carter County School in Grayson, KY, 1935/12/10 - 1937/12/17
County Judge George McClave, [n.d.] - [n.d.]
Hitchins School, 1937/3/8 - 1939/4/30
Hitchins School, 1937/3/8 - 1939/4/30
Hitchins School, 1937/3/8 - 1939/4/30
Hitchins Gymnasium, 1940/12/9 - 1941/12/13
Hitchins Gymnasium, 1940/12/9 - 1941/12/13
Hitchins Gymnasium, 1940/12/9 - 1941/12/13
Jailer's House, 1935/12/2 - 1939/3/17
County WPA Warehouse in Grayson, KY, 1937/1/3 - 1939/3/17
County Quarry, [n.d.] - [n.d.]
Bridge abutment and pier, 1940, 1940
Bridge abutment and pier, 1940, 1940
Carter County City School, 1939/3/18 - 1941/3/15
Carter County City School, 1939/3/18 - 1941/3/15
Carter County City School, 1939/3/18 - 1941/3/15
Carter County City School and Gymnasium, 1939/3/18 - 1941/3/15
Carter County City School, 1939/3/18 - 1941/3/15
County road constructed by WPA, [n.d.] - [n.d.]
County road constructed by WPA, [n.d.] - [n.d.]
Grade for county road, [n.d.] - [n.d.]
Road cut into side of hill by WPA, [n.d.] - [n.d.]
County road constructed by WPA, [n.d.] - [n.d.]
County road constructed by WPA, [n.d.] - [n.d.]
Bridge constructed by WPA, [n.d.] - [n.d.]
Olive Hill, KY street under construction by WPA, [n.d.] - [n.d.]
Casey County
Liberty, KY WPA Warehouse, 1939/1/4 - 1939/6/10
Liberty, KY WPA Warehouse, 1939/1/4 - 1939/6/10
Liberty, KY WPA Warehouse, 1939/1/4 - 1939/6/10
Repairing and repainting Liberty, KY Courthouse, [n.d.] - [n.d.]
County Judge T.M. Zachary, 1942, 1942
Liberty, KY Fire Station and City Hall, 1941/7/14 - 1942/5/16
Liberty, KY Fire Station and City Hall, 1941/7/14 - 1942/5/16
Liberty, KY Fire Station and City Hall, 1941/7/14 - 1942/5/16
Middleburg School and Auditorium, 1938/10/19 - 1939/4/4
Middleburg School and Auditorium, 1938/10/19 - 1939/4/4
Middleburg School and Auditorium, 1938/10/19 - 1939/4/4
Middleburg School and Auditorium, 1938/10/19 - 1939/4/4
Deer in Casey County woodland, 1941, 1941
Deer in Casey County field, 1941, 1941
Road drainage and hillside slope construction, [n.d.] - [n.d.]
Drainage structure construction, [n.d.] - [n.d.]
Drainage construction, [n.d.] - [n.d.]
Grade for road, [n.d.] - [n.d.]
Napping rock on county road, [n.d.] - [n.d.]
County road constructed by WPA, [n.d.] - [n.d.]
Making heavy cut for county road, [n.d.] - [n.d.]
County road constructed by WPA, [n.d.] - [n.d.]
Loading gravel along Casey County stream, [n.d.] - [n.d.]
Widening shoulders on state highway, 1941, 1941
Liberty, KY Gymnasium, 1936/2/10 - 1937/12/18
Interior of Liberty, KY Gymnasium, 1936/2/10 - 1937/12/18
Building roof for Liberty, KY Gymnasium, 1936/2/10 - 1937/12/18
Scrap collected by WPA, November 1942, 1942
Christian County
Building concrete rebar supports for Hopkinsville Ninth Street Bridge, 1935/11/25 - 1937/6/12
Completed Ninth Street Bridge in Hopkinsville, 1935/11/25 - 1937/6/12
Completed Ninth Street Bridge in Hopkinsville, 1935/11/25 - 1937/6/12
Completed Ninth Street Bridge in Hopkinsville, 1935/11/25 - 1937/6/12
Hopkinsville Stadium (view from field looking at grandstand), 1936/10/12 - 1938/10/28
Hopkinsville Stadium (outside view of grandstand), 1936/10/12 - 1938/10/28
Hopkinsville Stadium (view from field looking at grandstand), 1936/10/12 - 1938/10/28
Hopkinsville Stadium (outside view of grandstand), 1936/10/12 - 1938/10/28
Home of George F Shaw's father, [n.d.] - [n.d.]
County Judge James E. Higgins, 1942, 1942
Pembroke School, 1941/1/16 - 1942/1/24
Pembroke School, 1941/1/16 - 1942/1/24
Pembroke School, 1941/1/16 - 1942/1/24
Interior of Pembroke School, 1941/1/16 - 1942/1/24
County quarry operated by WPA, [n.d.] - [n.d.]
Walnut Street in Hopkinsville, rebuilt by WPA, [n.d.] - [n.d.]
County road constructed by WPA, [n.d.] - [n.d.]
Clark County
Remodeled Clark County Courthouse in Winchester, KY, 1938/3/21 - 1939/6/24
Remodeled Clark County Courthouse in Winchester, KY, 1938/3/21 - 1939/6/24
Remodeled Clark County Courthouse in Winchester, KY, 1938/3/21 - 1939/6/24
Remodeled Clark County Courthouse in Winchester, KY, 1938/3/21 - 1939/6/24
New street, curb and gutter rounded to property line of Davis house in Winchester, KY 1940, 1940
New street, curb and gutter rounded in front of first house on left in Winchester, KY 1940, 1940
New street, curb and gutter rounded into house of Mr. Freeman in Winchester, KY 1940, 1940
Streets and roads constructed by WPA on Goose Creek Road, [n.d.] - [n.d.]
Streets and roads constructed by WPA in Winchester, KY, [n.d.] - [n.d.]
Streets and roads constructed by WPA on Jackson Ferry Road, [n.d.] - [n.d.]
Streets and roads constructed by WPA in Winchester, KY, [n.d.] - [n.d.]
Winchester Negro School, 1938/6/27 - 1939/6/1
Boonesboro Road Quarry, [n.d.] - [n.d.]
Boonesboro Road Quarry, [n.d.] - [n.d.]
Winchester Negro School, 1938/6/27 - 1939/6/1
Boonesboro Road Quarry, [n.d.] - [n.d.]
Winchester Scrap Piles, September 1942, 1942
Winchester Scrap Piles, September 1942, 1942
Winchester Scrap Piles wire fencing collected, September 1942, 1942
Clay County
Old Courthouse in Manchester, KY that burned, [n.d.] - [n.d.]
Courthouse in Manchester, KY, 1937/5/21 - 1939/6/19
Courthouse in Manchester, KY, 1937/5/21 - 1939/6/19
Courthouse in Manchester, KY, 1937/5/21 - 1939/6/19
Courthouse in Manchester, KY, 1937/5/21 - 1939/6/19
Rear View of Courthouse in Manchester, KY, 1937/5/21 - 1939/6/19
Laurel Creek School, 1936/9/8 - 1937/6/15
Manchester Warehouse, 1941, 1941
Otter Creek School Constructed by WPA on a county wide school project, [n.d.] - [n.d.]
Flat Creek School, 1936/9/8 - 1937/5/20
Manchester School, 1941/7/22 - 1941/10/15
Manchester School, 1941/7/22 - 1941/10/15
Manchester School, 1941/7/22 - 1941/10/15
Manchester School, 1941/7/22 - 1941/10/15
Pack Horse Library Carrier visiting man with gun shot wound., [n.d.] - [n.d.]
Pack Horse Library Carrier, [n.d.] - [n.d.]
Pack Horse Library Carrier visiting mountain home, [n.d.] - [n.d.]
Burning School Road Constructed by WPA, [n.d.] - [n.d.]
Bridge and Tiger Road Constructed by WPA, [n.d.] - [n.d.]
Manchester Scrap Pile, September 1942, 1942
Clinton County
WPA Office and Warehouse in Albany, KY, 1940/8/15 - 1940/11/18
WPA Office and Warehouse in Albany, KY, 1940/8/15 - 1940/11/18
Concrete file manufactured by WPA, [n.d.] - [n.d.]
Albany Gymnasium, 1937/12/10 - 1939/4/28
Albany Gymnasium, High School gym in Albany, KY, 1937/12/10 - 1939/4/28
Albany Gymnasium, 1937/12/10 - 1939/4/28
Old Water Mill, [n.d.] - [n.d.]
Dynamite and cap magazines built from material cut on job, [n.d.] - [n.d.]
County Road construction by WPA Locating Road, [n.d.] - [n.d.]
County Road constructed by WPA before surfacing, [n.d.] - [n.d.]
County Road construction by WPA, Road Graded by hand and man power only, [n.d.] - [n.d.]
County Road Construction by WPA, [n.d.] - [n.d.]
County Road Construction by WPA New Grade, [n.d.] - [n.d.]
County Road Construction by WPA Sloping Bank on Huntersville Road, [n.d.] - [n.d.]
County Road Construction by WPA Ida-Desda Road, [n.d.] - [n.d.]
County Road Construction by WPA Cartwright Road, [n.d.] - [n.d.]
WPA Workers building Roads by hand, [n.d.] - [n.d.]
WPA Workers building Roads by hand, [n.d.] - [n.d.]
County Road construction by WPA Cumberland City Road, [n.d.] - [n.d.]
Road Construction by WPA, [n.d.] - [n.d.]
County Road Construction by WPA, [n.d.] - [n.d.]
County Road Construction by WPA, [n.d.] - [n.d.]
County Road Construction by WPA, [n.d.] - [n.d.]
County Road Construction by WPA, [n.d.] - [n.d.]
County Road Construction by WPA Paola Church Road, [n.d.] - [n.d.]
County Road Construction by WPA Road drainage structure, [n.d.] - [n.d.]
County Roads constructed by WPA Duvall Valley Road, [n.d.] - [n.d.]
County Roads constructed by WPA Duvall Valley Road, [n.d.] - [n.d.]
County Roads constructed by WPA Station Road, [n.d.] - [n.d.]
County Roads Constructed by WPA, [n.d.] - [n.d.]
County Roads constructed by WPA Ida Road, [n.d.] - [n.d.]
Dynamite Magazine Durall Valley Road, [n.d.] - [n.d.]
Dynamite Magazine, [n.d.] - [n.d.]
Quarry operated by WPA, [n.d.] - [n.d.]
Cave Springs Crusher operated by WPA, [n.d.] - [n.d.]
Drainage culverts constructed by WPA Laying pipe culvert, [n.d.] - [n.d.]
Drainage culverts constructed by WPA Double Box Culvert, [n.d.] - [n.d.]
Drainage Culverts constructed by WPA Pipe culvert with headwalls, [n.d.] - [n.d.]
Drainage Culverts constructed by WPA Paolo Church Road, [n.d.] - [n.d.]
Drainage Culverts constructed by WPA Pier and abuttment bridge, [n.d.] - [n.d.]
Drainage culverts constructed by WPA, [n.d.] - [n.d.]
Drainage culverts constructed by WPA Note side drainage structure on newly graded road, [n.d.] - [n.d.]
Drainage culverts constructed by WPA, [n.d.] - [n.d.]
Steel tied for bridge slab, [n.d.] - [n.d.]
Crittenden County
Marion High School, 1938/4/7 - 1940/12/12
Marion High School, 1938/4/7 - 1940/12/12
Concrete pipe supply Marion, KY 1940, 1940
Commercial Quarry in Crittenden County 1940, 1940
Commercial Quarry in Crittenden County 1940, 1940
County Courthouse 1942. "Old courthouse at Marion, Crittenden County. Probably the worst run down court house in state.", [n.d.] - [n.d.]
C.E. (Ches) Truitt, County Judge 1942, 1942
WPA Street Project in Marion, KY, [n.d.] - [n.d.]
WPA Street Project in Marion, KY, [n.d.] - [n.d.]
WPA Street Project in Marion, KY, [n.d.] - [n.d.]
Cumberland County
Concrete Pipe Supply in Burkesville, KY 1940. Burkesville Tile., [n.d.] - [n.d.]
Road constructed by WPA under Master Road Project 1940, 1940
Warehouse in Burkesville, KY, 1938/10/18 - 1938/12/13
Warehouse in Burkesville, KY, 1938/10/18 - 1938/12/13
Warehouse in Burkesville, KY, 1938/10/18 - 1938/12/13
Cumberland County Bridge 1940, 1940
Cumberland County Bridge 1940, 1940
Cumberland County Bridge 1940, 1940
Frogue Road Constructed by WPA 1940, 1940
Frogue Road Constructed by WPA 1940, 1940
Frogue Road Constructed by WPA 1940, 1940
Roads constructed by WPA Sulphur Spring Road, [n.d.] - [n.d.]
Roads constructed by WPA Wash Bottom Road, [n.d.] - [n.d.]
Roads constructed by WPA Frogue Road, [n.d.] - [n.d.]
Roads constructed by WPA Frogue Road, [n.d.] - [n.d.]
Roads constructed by WPA Progue Road, [n.d.] - [n.d.]
WPA Bridge construction Waterview Bridge, [n.d.] - [n.d.]
WPA Bridge construction Bear Creek Bridge, [n.d.] - [n.d.]
B.R. Norris, County Judge 1942, 1942
WPA Drainage Construction Stone masonry culvert, [n.d.] - [n.d.]
Drainage construction Piers for Waterview Bridge, [n.d.] - [n.d.]
WPA Drainage construction, [n.d.] - [n.d.]
WPA Drainage Construction. Excavation for Drainage structure, [n.d.] - [n.d.]
WPA Drainage construction, [n.d.] - [n.d.]
County Quarry Bin, [n.d.] - [n.d.]
WPA Street Construction in Burkesville, [n.d.] - [n.d.]
WPA street construction in Burkesville, [n.d.] - [n.d.]
WPA Street Construction in Burkesville, [n.d.] - [n.d.]
Road Construction Grade and Drain, [n.d.] - [n.d.]
Road Construction, [n.d.] - [n.d.]
Road Construction Sulphur Creek Road, [n.d.] - [n.d.]
Road Construction Grading, [n.d.] - [n.d.]
Road construction. Rock excavation for grade., [n.d.] - [n.d.]
Road Construction Amaudaville Road, [n.d.] - [n.d.]
Road construction Sidehill cut, [n.d.] - [n.d.]
Road Construction. Loading truck on big fill., [n.d.] - [n.d.]
Road Construction Making Fill, [n.d.] - [n.d.]
Road Construction Black's Ferry Road, [n.d.] - [n.d.]
Roads Constructed by WPA Modoe Road, [n.d.] - [n.d.]
Roads Constructed by WPA Speartown Road, [n.d.] - [n.d.]
Roads Constructed by WPA Irish Bottom Road, [n.d.] - [n.d.]
Roads constructed by WPA Amaudaville Road, [n.d.] - [n.d.]
Roads constructed by WPA Amaudaville Road, [n.d.] - [n.d.]
Roads constructed by WPA Modoe Road, [n.d.] - [n.d.]
Roads Constructed by WPA Modoe Road, [n.d.] - [n.d.]
Marrowbone Gymnasium constructed by WPA on a Master Project Frances School, [n.d.] - [n.d.]
Marrowbone Gymnasium constructed by WPA on a Master Project Roofing Marrowbone Gym, [n.d.] - [n.d.]
Marrowbone Gymnasium constructed by WPA on a Master Project, [n.d.] - [n.d.]
Marrowbone Gymnasium Constructed WPA on a Master project, [n.d.] - [n.d.]
Burkesville Graded and High School constructed by WPA on a Master Project, [n.d.] - [n.d.]
Young School Constructed by WPA on a Master Project, [n.d.] - [n.d.]
Valley School Constructed by WPA on a Master Project, [n.d.] - [n.d.]
Daviess County
Boiler Room and Garage at Owensboro Hospital 1940, 1940
Owensboro Hospital, 1939/1/28 - 1942/3/7
Owensboro Hospital, 1939/1/28 - 1942/3/7
Owensboro Hospital, 1939/1/28 - 1942/3/7
Owensboro Hospital showing heating and laundry plant building at right, 1939/1/28 - 1942/3/7
Owensboro Hospital, 1939/1/28 - 1942/3/7
Owensboro Hospital, 1939/1/28 - 1942/3/7
Parking Apron in front of Owensboro Hospital, 1939/1/28 - 1942/3/7
Owensboro Hospital, 1939/1/28 - 1942/3/7
Owensboro School. "Starting new school building at Owensboro, Daviess County. Will be a very large building.", 1940/2/14 - 1941/12/20
Owensboro School. "Foundation of new school at Owensboro.", 1940/2/14 - 1941/12/20
Owensboro School. Foundation of school building., 1940/2/14 - 1941/12/20
Owensboro School, 1940/2/14 - 1941/12/20
Owensboro School, 1940/2/14 - 1941/12/20
Owensboro School, 1940/2/14 - 1941/12/20
Owensboro School, 1940/2/14 - 1941/12/20
Owensboro School, 1940/2/14 - 1941/12/20
Owensboro School, 1940/2/14 - 1941/12/20
Owensboro School, 1940/2/14 - 1941/12/20
Owensboro School. One of the entrances to new Technical High School, 1940/2/14 - 1941/12/20
Owensboro School, 1940/2/14 - 1941/12/20
Owensboro School, 1940/2/14 - 1941/12/20
Drainage structure built by WPA 1941. 22 foot Arch drainage structure., [n.d.] - [n.d.]
Drainage structure built by WPA 1941, 1941
Drainage structure built by WPA 1941, 1941
Road constructed by WPA, [n.d.] - [n.d.]
Owensboro Stadium, 1940/7/8 - 1941/12/20
Owensboro Stadium, 1940/7/8 - 1941/12/20
Owensboro Stadium, 1940/7/8 - 1941/12/20
Owensboro Stadium, 1940/7/8 - 1941/12/20
Owensboro Stadium, 1940/7/8 - 1941/12/20
Owensboro Stadium, 1940/7/8 - 1941/12/20
Owensboro Stadium, 1940/7/8 - 1941/12/20
Owensboro Stadium Lunch stand, 1940/7/8 - 1941/12/20
Band rehearsing in front of Owensboro Stadium, 1940/7/8 - 1941/12/20
Owensboro Sewer Cave in, [n.d.] - [n.d.]
WPA Sewer construction in Owensboro, [n.d.] - [n.d.]
WPA Sewer construction in Owensboro, [n.d.] - [n.d.]
WPA Sewer construction in Owensboro, [n.d.] - [n.d.]
WPA Sewer construction in Owensboro, [n.d.] - [n.d.]
WPA street construction in Owensboro, [n.d.] - [n.d.]
WPA street construction in Owensboro Corner of McCreary and Griffith Avenues, [n.d.] - [n.d.]
WPA street construction in Owensboro, [n.d.] - [n.d.]
WPA street construction in Owensboro, [n.d.] - [n.d.]
Owensboro Warehouse, 1938/8/25 - 1939/12/31
Utica School. Monolithic concrete Building., 1939/7/22 - 1941/4/26
Utica School. "End of gym. Note modernistic lettering and glass brick windows.", 1939/7/22 - 1941/4/26
Utica School. "Monolithic Concrete School", 1939/7/22 - 1941/4/26
Utica School Rear view, 1939/7/22 - 1941/4/26
Utica School. "Side entrance to Utica School showing modernistic design.", 1939/7/22 - 1941/4/26
Sutherland Gymnasium, 1940/7/15 - 1941/1/6
Scrap collected by WPA on October, 1942 in Owensboro, KY, [n.d.] - [n.d.]
Scrap collected by WPA on October, 1942 in Owensboro, KY, [n.d.] - [n.d.]
Scrap collected by WPA on October, 1942 in Owensboro, KY, [n.d.] - [n.d.]
Edmonson County
Brownsville School and Gymnasium, 1940/10/7 - [n.d.]
Brownsville School and Gymnasium, 1940/10/7 - [n.d.]
Brownsville School and Gymnasium, 1940/10/7 - [n.d.]
Brownsville School and Gymnasium, 1940/10/7 - [n.d.]
Brownsville School and Gymnasium, 1940/10/7 - [n.d.]
Brownsville School and Gymnasium, 1940/10/7 - [n.d.]
Brownsville School and Gymnasium, 1940/10/7 - [n.d.]
Sunfish Gymnasium, Sunfish, KY, 1936/2/25 - 1936/8/20
Edmonson County Courthouse, Brownsville, KY, [n.d.] - [n.d.]
Storm Water Ditch Constructed by WPA in Brownsville, KY, [n.d.] - [n.d.]
County Quarry operated by WPA, [n.d.] - [n.d.]
County Roads Constructed by WPA Liberty Road, [n.d.] - [n.d.]
County Roads Constructed by WPA Rocky Hill Road, [n.d.] - [n.d.]
County Roads Constructed by WPA Bigg Road, [n.d.] - [n.d.]
County Roads Constructed by WPA Grassland Road, [n.d.] - [n.d.]
Elliott County
Warehouse in Sandy Hook, KY, 1938/2/17 - 1938/7/16
Mountain View 1941. Road skirting mountain Constructed by WPA, [n.d.] - [n.d.]
Mountain Scene 1942, 1942
Courthouse, Sandy Hook. KY. Foundation put in under K.E.R.A., [n.d.] - 1938/4/1
Sandy Hook School, 1936/6/20 - 1938/7/11
Gymnasium and Community House, Sandy Hook, KY, 1935/11/11 - 1938/12/15
Gymnasium and Community House, Sandy Hook, KY, 1935/11/11 - 1938/12/15
Ray Fannin, County Judge, 1942, 1942
Road in Elliott County, 1941, 1941
Mountain View, 1941., [n.d.] - [n.d.]
Bridge abutment constructed by WPA, [n.d.] - [n.d.]
Grading, Draining and Road Construction by WPA, [n.d.] - [n.d.]
Grading, Draining and Road Construction by WPA, Grade & Drain by Hand, [n.d.] - [n.d.]
Grading, draining and road construction by WPA, [n.d.] - [n.d.]
Drainage Structure, [n.d.] - [n.d.]
Road Construction by WPA, [n.d.] - [n.d.]
Grade & Drain Road Construction by WPA, [n.d.] - [n.d.]
Road Construction by WPA. Road and grade around cliff, [n.d.] - [n.d.]
Road and grading by WPA, [n.d.] - [n.d.]
Road and grading by WPA, [n.d.] - [n.d.]
Estill County
Estill County School, 1938/7/22 - 1939/6/17
Estill County School, 1938/7/22 - 1939/6/17
Addition to Irvine Grade School, 1939/2/20 - 1939/12/2
Addition to Irvine Grade School, 1939/2/20 - 1939/12/2
Two wing addition to Irvine High School, 1939/10/18 - 1940/5/17
Two wing addition to Irvine High School, 1939/10/18 - 1940/5/17
Two wing addition to Irvine High School, 1939/10/18 - 1940/5/17
Two wing addition to Irvine High School, 1939/10/18 - 1940/5/17
Irvine Courthouse, 1940/1/25 - 1942/6/1
Irvine Courthouse, 1940/1/25 - 1942/6/1
Irvine Courthouse Sideview, 1940/1/25 - 1942/6/1
Irvine Courthouse . "Plastering a new courthouse in Irvine.", 1940/1/25 - 1942/6/1
Irvine Courthouse . "Plastering a new courthouse in Irvine.", 1940/1/25 - 1942/6/1
Irvine Courthouse, 1940/1/25 - 1942/6/1
Irvine Courthouse. Sideview of courthouse., 1940/1/25 - 1942/6/1
Irvine Courthouse, 1940/1/25 - 1942/6/1
Irvine Courthouse, 1940/1/25 - 1942/6/1
Irvine Courthouse Entrance, 1940/1/25 - 1942/6/1
Irvine Courthouse, 1940/1/25 - 1942/6/1
Irvine Courthouse, 1940/1/25 - 1942/6/1
Wagerville Bridge Constructed by WPA, [n.d.] - [n.d.]
Wagerville Bridge Constructed by WPA, [n.d.] - [n.d.]
Irvine Street constructed by WPA, [n.d.] - [n.d.]
Quarry and Crusher operated by WPA, [n.d.] - [n.d.]
Quarry and Crusher operated by WPA, [n.d.] - [n.d.]
Pryse Road Bridge constructed by WPA, [n.d.] - [n.d.]
Road Construction by WPA, [n.d.] - [n.d.]
Road Construction by WPA, [n.d.] - [n.d.]
Road Construction by WPA, [n.d.] - [n.d.]
Road Construction by WPA. River Road., [n.d.] - [n.d.]
Fayette County
WPA School Lunch at Abraham Lincoln School, Lexington, KY 1940 "Serving a school lunch for pupils of Abraham Lincoln school in Lexington, KY.", [n.d.] - [n.d.]
WPA School Lunch at Abraham Lincoln School, Lexington, KY 1940 "General view of the room where WPA lunches are served at Abraham Lincoln School in Lexington.", [n.d.] - [n.d.]
WPA School Lunch at Abraham Lincoln School, Lexington, KY 1940 "One of the four tables served SPA Lunches at the Abraham Lincoln School in Lexington.", [n.d.] - [n.d.]
Washing dishes after a WPA school lunch has been served. Abraham Lincoln School, Lexington, KY, March, 1940, 1940
Stacking dishes after a school lunch was served at the Abraham Lincoln School, Lexington, KY, March, 1940, 1940
Type of house where children live that are eating school lunches. Abraham Lincoln School, Lexington, KY., [n.d.] - [n.d.]
Lexington Nursery School operated by WPA, [n.d.] - [n.d.]
Shorthand Class operated by WPA, [n.d.] - [n.d.]
Lexington Toy mending project operated by WPA, [n.d.] - [n.d.]
Lexington Toy mending project operated by WPA, [n.d.] - [n.d.]
Lubrication Project, University of Kentucky, [n.d.] - [n.d.]
Lubrication Project, University of Kentucky, [n.d.] - [n.d.]
Lubrication Project, University of Kentucky, [n.d.] - [n.d.]
Lubrication Project, University of Kentucky, [n.d.] - [n.d.]
Lubrication Project, University of Kentucky, [n.d.] - [n.d.]
Lubrication Project, University of Kentucky, [n.d.] - [n.d.]
Lubrication Project, University of Kentucky, [n.d.] - [n.d.]
Lubrication Project, University of Kentucky, [n.d.] - [n.d.]
Colored Class in Elementary English conducted in Lexington, KY by WPA, [n.d.] - [n.d.]
Colored Music Festival, May 12, 1940, 1940
Colored Music Festival, May 12, 1940, 1940
Colored Music Festival, May 12, 1940, 1940
Colored Music Festival, May 12, 1940, 1940
Colored Music Festival, May 12, 1940, 1940
Colored Music Festival, May 12, 1940, 1940
Colored Music Festival, May 12, 1940, 1940
Colored Music Festival, May 12, 1940, 1940
Project Shacks being built in Lexington, KY, [n.d.] - [n.d.]
Lexington District Operations Office 1940, 1940
Lot on which old Post Office stood in Lexington and which WPA removed 1940, 1940
Lot on which old Post Office stood in Lexington and which WPA removed 1940, 1940
County Quarry and Crusher operated by WPA, [n.d.] - [n.d.]
County Quarry and Crusher operated by WPA, [n.d.] - [n.d.]
Straightening Town Branch in Lexington, KY by WPA, [n.d.] - [n.d.]
Lexington Sewer Construction by WPA, [n.d.] - [n.d.]
University of Kentucky Greenhouse constructed by WPA, [n.d.] - [n.d.]
University of Kentucky Press box constructed by WPA, [n.d.] - [n.d.]
Reconstruction of Stoll Field by WPA, [n.d.] - [n.d.]
Running Track at University of Kentucky Stadium, 1935/11/23 - 1936/8/14
Addition to Barber Hall at the University of Kentucky, 1938/2/11 - 1938/12/15
Plaque in fence build around Stoll Field by WPA at the University of Kentucky, [n.d.] - [n.d.]
Concrete Fence constructed by WPA at Stoll Field, University of Kentucky, [n.d.] - [n.d.]
Concrete Fence constructed by WPA at Stoll Field, University of Kentucky, [n.d.] - [n.d.]
Lexington Armory, 1940/10/8 - 1941/12/8
Lexington Armory, 1940/10/8 - 1941/12/8
Lexington Armory, 1940/10/8 - 1941/12/8
Lexington Armory, 1940/10/8 - 1941/12/8
Lexington Armory, 1940/10/8 - 1941/12/8
Lexington Armory, 1940/10/8 - 1941/12/8
Lexington Armory Rear View, 1940/10/8 - 1941/12/8
Lexington Armory, 1940/10/8 - 1941/12/8
Lexington Armory Side View, 1940/10/8 - 1941/12/8
Lexington Armory, 1940/10/8 - 1941/12/8
Lexington Armory Rear View, 1940/10/8 - 1941/12/8
Lexington Armory Southwest View, 1940/10/8 - 1941/12/8
Lexington Armory Drill Hall, 1940/10/8 - 1941/12/8
Lexington Armory Front View, 1940/10/8 - 1941/12/8
Lexington Armory Drill Hall, 1940/10/8 - 1941/12/8
Lexington Armory Southeast View, 1940/10/8 - 1941/12/8
Lexington Armory Main Entrance, 1940/10/8 - 1941/12/8
Grading on Lexington Airport, 1941/7/21 - [n.d.]
Grading on Lexington Airport, 1941/7/21 - [n.d.]
Grading on Lexington Airport, 1941/7/21 - [n.d.]
Grading operations at Lexington Airport, 1941/7/21 - [n.d.]
Grading operations at Lexington Airport, 1941/7/21 - [n.d.]
Grading at Lexington Airport, 1941/7/21 - [n.d.]
Sheepfoot Roller operating at Lexington Airport, 1941/7/21 - [n.d.]
Scraper in action at Lexington Airport, 1941/7/21 - [n.d.]
Lexington Airport. Two tractors with 16 yd. scrapers, 1941/7/21 - [n.d.]
Grading at Lexington Airport, 1941/7/21 - [n.d.]
16 yd. Scraper at Airport, 1941/7/21 - [n.d.]
Brick Flume for drainage at Lexington Airport, 1941/7/21 - [n.d.]
Sod pegged in place at Lexington Airport, 1941/7/21 - [n.d.]
Lexington Airport sodded section, 1941/7/21 - [n.d.]
Lexington Airport Shaping and sodding, 1941/7/21 - [n.d.]
Lexington Airport, 1941/7/21 - [n.d.]
Lexington Airport, 1941/7/21 - [n.d.]
Lexington Airport Concrete Shed, 1941/7/21 - [n.d.]
Lexington Airport Batchplant, 1941/7/21 - [n.d.]
Lexington Airport Sand and Stone Stockpile, 1941/7/21 - [n.d.]
Lexington Airport Birdseye view of general operation, 1941/7/21 - [n.d.]
Lexington Airport Runway, 1941/7/21 - [n.d.]
Lexington Airport. Forms set ahead of paver., 1941/7/21 - [n.d.]
Lexington Airport. Finishing concrete., 1941/7/21 - [n.d.]
Lexington Airport, 1941/7/21 - [n.d.]
Lexington Airport Runway, 1941/7/21 - [n.d.]
Lexington Airport, 1941/7/21 - [n.d.]
Entrance to Lexington Airport, 1941/7/21 - [n.d.]
Entrance to Lexington Airport with #60 in background, 1941/7/21 - [n.d.]
Lexington Airport Batchplant, 1941/7/21 - [n.d.]
Lexington Airport, 1941/7/21 - [n.d.]
Lexington Airport Batchplant, 1941/7/21 - [n.d.]
Lexington Airport, 1941/7/21 - [n.d.]
Lexington Airport Intersections of Runways, 1941/7/21 - [n.d.]
Lexington Airport #1 Runway, 1941/7/21 - [n.d.]
Lexington Airport, 1941/7/21 - [n.d.]
Lexington Streets Constructed by WPA. Concrete Streets., [n.d.] - [n.d.]
Lexington Streets Constructed by WPA. Resurfacing., [n.d.] - [n.d.]
Lexington Streets Constructed by WPA, [n.d.] - [n.d.]
Brier Hill School, 1935/10/10 - 1936/7/21
Slaughter house at the County Infirmary Constructed by WPA, [n.d.] - [n.d.]
Addition to Bryan Station School Constructed by WPA, [n.d.] - [n.d.]
Athens School Addition, 1935/10/10 - 1936/1/24
Views of the Morgan House in Lexington, KY on September 13, 1938, 1938
Views of the Morgan House in Lexington, KY on September 13, 1938, 1938
Views of the Morgan House in Lexington, KY on September 13, 1938, 1938
Views of the Morgan House in Lexington, KY on September 13, 1938, 1938
Views of the Morgan House in Lexington, KY on September 13, 1938, 1938
Views of the Morgan House in Lexington, KY on September 13, 1938, 1938
Views of the Morgan House in Lexington, KY on September 13, 1938, 1938
Views of the Morgan House in Lexington, KY on September 13, 1938, 1938
Views of the Morgan House in Lexington, KY on September 13, 1938, 1938
Views of the Morgan House in Lexington, KY on September 13, 1938, 1938
Fleming County
Flemingsburg School Front entrance, 1938/1/26 - 1941/12/18
Angle shot of front of Flemingsburg School, 1938/1/26 - 1941/12/18
Flemingsburg School, 1938/1/26 - 1941/12/18
Flemingsburg School Front View, 1938/1/26 - 1941/12/18
Showing steel trusses in roof construction of Flemingsburg School, 1938/1/26 - 1941/12/18
Flemingsburg School, 1938/1/26 - 1941/12/18
Flemingsburg school under roof, 1938/1/26 - 1941/12/18
Flemingsburg School, 1938/1/26 - 1941/12/18
Flemingsburg School, 1938/1/26 - 1941/12/18
Flemingsburg School, 1938/1/26 - 1941/12/18
Flemingsburg School, 1938/1/26 - 1941/12/18
Flemingsburg School, 1938/1/26 - 1941/12/18
Flemingsburg School, 1938/1/26 - 1941/12/18
Flemingsburg School Entrance, 1938/1/26 - 1941/12/18
Flemingsburg School, 1938/1/26 - 1941/12/18
Flemingsburg School Thru entrance posts, 1938/1/26 - 1941/12/18
Flemingsburg School, 1938/1/26 - 1941/12/18
Flemingsburg School, 1938/1/26 - 1941/12/18
Flemingsburg School, 1938/1/26 - 1941/12/18
Flemingsburg School, 1938/1/26 - 1941/12/18
Flemingsburg School, 1938/1/26 - 1941/12/18
Flemingsburg School, 1938/1/26 - 1941/12/18
Flemingsburg School, 1938/1/26 - 1941/12/18
Flemingsburg School, 1938/1/26 - 1941/12/18
Interior views of Flemingsburg School, 1938/1/26 - 1941/12/18
Interior views of Flemingsburg School, 1938/1/26 - 1941/12/18
Interior views of Flemingsburg School, 1938/1/26 - 1941/12/18
Hillsboro High School, 1936/11/27 - 1938/1/15
Hillsboro High School Inside entrance, 1936/11/27 - 1938/1/15
Entrance to Hillsboro High School, 1936/11/27 - 1938/1/15
Hillsboro High School, 1936/11/27 - 1938/1/15
Quarry and Portable Crusher operated by WPA, [n.d.] - [n.d.]
Quarry and Portable Crusher operated by WPA, [n.d.] - [n.d.]
Quarry and Portable Crusher operated by WPA, [n.d.] - [n.d.]
Cramtown Road Constructed by WPA, [n.d.] - [n.d.]
Convict Road Constructed by WPA, [n.d.] - [n.d.]
Floyd County
Prestonsburg High School and Gymnasium Foundation, 1937/9/21 - 1941/1/11
Prestonsburg High School and Gymnasium South-east view, 1937/9/21 - 1941/1/11
Prestonsburg High School and Gymnasium Rear view, 1937/9/21 - 1941/1/11
Prestonsburg High School and Gymnasium. "One of the largest school jobs in the state.", 1937/9/21 - 1941/1/11
Prestonsburg High School and Gymnasium, 1937/9/21 - 1941/1/11
Prestonsburg High School and Gymnasium, 1937/9/21 - 1941/1/11
Prestonsburg High School and Gymnasium, 1937/9/21 - 1941/1/11
Prestonsburg High School and Gymnasium, 1937/9/21 - 1941/1/11
Prestonsburg Court House 1942, 1942
Building railroad in Floyd County 1941, 1941
Building railroad in Floyd County 1941, 1941
Building railroad in Floyd County 1941, 1941
Building railroad in Floyd County 1941, 1941
Building railroad in Floyd County 1941 in Prestonsburg, KY, [n.d.] - [n.d.]
Building railroad in Floyd County 1941 in Prestonsburg, KY, [n.d.] - [n.d.]
Crusher operating in Floyd County 1941, 1941
Crusher operating in Floyd County 1941, 1941
Coal from new Floyd County Field 1941, 1941
WPA workers repairing bridge at Martin, [n.d.] - [n.d.]
Drainage Structure 1941, 1941
Dynamite magazine 1941, 1941
Stone Masonry abutment on bridge in Floyd County Constructed by WPA in 1941, 1941
Prestonsburg School Lunch Program 1942, 1942
Prestonsburg School Lunch Program 1942, 1942
WPA Warehouse in Prestonsburg, KY, [n.d.] - [n.d.]
Mine sealing project operated by WPA, [n.d.] - [n.d.]
Mine sealing project operated by WPA, [n.d.] - [n.d.]
Drainage Structure constructed by WPA, [n.d.] - [n.d.]
Prestonsburg streets constructed by WPA Garfield Street, [n.d.] - [n.d.]
Prestonsburg streets constructed by WPA 8th Street, [n.d.] - [n.d.]
Prestonsburg Retaining Wall and streets constructed by WPA, [n.d.] - [n.d.]
Prestonsburg Streets constructed by WPA, [n.d.] - [n.d.]
Prestonsburg Streets constructed by WPA, [n.d.] - [n.d.]
WPA workers surveying for bridge location, [n.d.] - [n.d.]
Cracker School constructed by WPA, [n.d.] - [n.d.]
Water Gap School constructed by WPA, [n.d.] - [n.d.]
McDowell School, 1936/1/28 - 1939/3/31
County Road construction by WPA Harold Road, [n.d.] - [n.d.]
County Road construction by WPA Abbott Creek Road, [n.d.] - [n.d.]
County Road construction by WPA. Surfacing road., [n.d.] - [n.d.]
County Road Construction by WPA. Surfacing Floyd County Roads., [n.d.] - [n.d.]
County Road Construction by WPA. Grade and Drain., [n.d.] - [n.d.]
County Road Construction by WPA, [n.d.] - [n.d.]
County Road Construction by WPA, [n.d.] - [n.d.]
Flash Flood at Beaver Creek in Floyd County on July 9, 1942, 1942
Bridge and stone building near Garret, KY during flash flood in Floyd County on July 9, 1942., [n.d.] - [n.d.]
Flash Flood in Floyd County on July 9, 1942. "Homes which wer flooded in Garrett, Kentucky. Water had fallen about 3 foot when picture was taken., [n.d.] - [n.d.]
Homes flooded in Garrett, KY during flash flood in Floyd County on July 9, 1942., [n.d.] - [n.d.]
Flood scene at Garrett, KY during flash flood in Floyd County on July 9, 1942., [n.d.] - [n.d.]
Flash Flood at Beaver Creek in Floyd County on July 9, 1942, 1942
Scene at Beaver Creek during flash flood in Floyd County on July 9, 1942., [n.d.] - [n.d.]
Water over highway near Garrett, KY during flash flood in Floyd County on July 9, 1942., [n.d.] - [n.d.]
Look up Beaver Creek from Garrett, KY during flash flood in Floyd County on July 9, 1942., [n.d.] - [n.d.]
Scene at Beaver Creek during flash flood in Floyd County on July 9, 1942., [n.d.] - [n.d.]
Near Garrett, KY during flash flood in Floyd County on July 9, 1942., [n.d.] - [n.d.]
Pearl Sexton, WPA Garden Foreman holding large radishes. October, 1942, 1942
Sam Isabell and Bud Towny supervising the weighing of scrap at Garret School. Picture taken during Operation Scrap project. October, 1942, 1942
Bud Towny, WPA Supt.; Edward Hill, Floyd County Judge; Sam Isabell, Salvace Chr with Floyd County Stockpile in background. Picture taken during Operation Scrap Project. October, 1942, 1942
Chas Clark, teacher; Curtis Owen, Principal, Garrett School, Floyd County. Picture taken during Operation Scrap Project. October, 1942., [n.d.] - [n.d.]
WPA workers who challenge the rest of the state. Picture taken during Operation Scrap Project. October, 1942., [n.d.] - [n.d.]
Bud Towny, Sam Isabell, Judge Hill. Picture taken during Operation Scrap Project. October, 1942, 1942
Bud Towny, WPA superintendent,; Edward Hill, Floyd County Judge; Sam Isabell, Salvage Com. Chr. Picture taken during Operation Scrap Project. October, 1942., [n.d.] - [n.d.]
Fort Knox
Exterior & Interior Views of filtration Plant at Fort Knox constructed by WPA, 1940. Filtration Plant, October 14, 1940., [n.d.] - [n.d.]
Exterior view of Filtration Plant at Fort Knox constructed by WPA, 1940. Sedimentation Basins., [n.d.] - [n.d.]
Interior view of Filtration Plant at Fort Knox constructed by WPA, 1940. Chlorine Mixing Machine, [n.d.] - [n.d.]
Interior view of Filtration Plant at Fort Knox constructed by WPA, 1940. Soda Ash Mixer, [n.d.] - [n.d.]
Interior view of Filtration Plant at Fort Knox constructed by WPA, 1940. Meter Panel., [n.d.] - [n.d.]
Interior view of Filtration Plant at Fort Knox constructed by WPA, 1940. Transformers., [n.d.] - [n.d.]
Interior view of Filtration Plant at Fort Knox constructed by WPA, 1940. Chemical Laboratory for testing water., [n.d.] - [n.d.]
Interior view of Filtration Plant at Fort Knox constructed by WPA, 1940. Control Panel., [n.d.] - [n.d.]
Interior view of Filtration Plant at Fort Knox constructed by WPA, 1940. Alum Tanks., [n.d.] - [n.d.]
Filtration Plant at Fort Knox constructed by WPA, 1940. Pumping station and pipe from spring that supplies water., [n.d.] - [n.d.]
Filtration Plant constructed by WPA at Fort Knox, 1940. Alum mixing beds., [n.d.] - [n.d.]
Filtration Plant constructed by WPA at Fort Knox, 1940. Inlet Valves., [n.d.] - [n.d.]
Filtration Plant constructed by WPA at Fort Knox, 1940. Filter beds., [n.d.] - [n.d.]
Interior view of Fort Knox Officers' Club constructed by WPA, 1940., [n.d.] - [n.d.]
Exterior view of Fort Knox Officers' Club constructed by WPA, 1940., [n.d.] - [n.d.]
Interior view of Fort Knox Officers' Club constructed by WPA, 1940., [n.d.] - [n.d.]
Interior view of Fort Knox Officers' Club constructed by WPA, 1940., [n.d.] - [n.d.]
Franklin County
Peak's Mill School, 1938/7/21 - 1939/10/13
Peak's Mill School, 1938/7/21 - 1939/10/13
Peak's Mill School, 1938/7/21 - 1939/10/13
Peak's Mill School, 1938/7/21 - 1939/10/13
Peak's Mill School, 1938/7/21 - 1939/10/13
Quarry and Crusher operated by WPA, [n.d.] - [n.d.]
Quarry and Crusher operated by WPA, [n.d.] - [n.d.]
Quarry Dynamite Magazine Constructed by WPA, [n.d.] - [n.d.]
Peak's Mill Road Constructed by WPA, [n.d.] - [n.d.]
New State Office Building at Frankfort, KY. October, 1942, 1942
New State Office Building at Frankfort, KY. October, 1942, 1942
State Capitol (view form top of Capitol Hill), Frankfort, KY. May, 1942., [n.d.] - [n.d.]
State Capitol (view form top of Capitol Hill), Frankfort, KY. May, 1942., [n.d.] - [n.d.]
Fulton County
Cayce School, 1935/11/11 - 1937/3/15
Cayce School, 1935/11/11 - 1937/3/15
Cayce School, 1935/11/11 - 1937/3/15
Steps at Clinton, 1939/1/10 - 1939/8/9
Steps at Clinton, 1939/1/10 - 1939/8/9
Steps at Clinton, 1939/1/10 - 1939/8/9
Cayce School, 1935/11/11 - 1937/3/15
Homer Robers, County Judge. 1942, 1942
Fulton County Certified road worker, [n.d.] - [n.d.]
Practice not recommended by Mr. Creech, [n.d.] - [n.d.]
Gravel Pit operated by WPA, [n.d.] - [n.d.]
Concrete pavement constructed by WPA, [n.d.] - [n.d.]
WPA workers ditching to correct slide on Terrell Street in Hickman, [n.d.] - [n.d.]
WPA workers sloping by hand on Hickman Streets, [n.d.] - [n.d.]
Hickman sewers under construction by WPA, [n.d.] - [n.d.]
Hickman sewers under construction by WPA, [n.d.] - [n.d.]
Hickman sewers under construction by WPA, [n.d.] - [n.d.]
County Road near Hickman built by WPA, [n.d.] - [n.d.]
West view of Carr Institute, 1942/1/7 - [n.d.]
Southeast view of Carr Institute, 1942/1/7 - [n.d.]
East end view of Carr Institute, 1942/1/7 - [n.d.]
Carr Institute, 1942/1/7 - [n.d.]
Carr Institute, 1942/1/7 - [n.d.]
South view of Carr Institute, 1942/1/7 - [n.d.]
Library at Carr Institute, 1942/1/7 - [n.d.]
Front entrance of Carr Institute, 1942/1/7 - [n.d.]
Gallatin County
Warsaw Courthouse remodeled by WPA. Gallatin County Courthouse being remodeled., 1938/6/15 - 1940/1/30
Warsaw Courthouse remodeled by WPA. Gallatin County Courthouse when work was started., 1938/6/15 - 1940/1/30
Warsaw Courthouse remodeled by WPA. Gallatin County Courthouse., 1938/6/15 - 1940/1/30
Warsaw Courthouse remodeled by WPA. Gallatin County Courthouse., 1938/6/15 - 1940/1/30
Warsaw Courthouse remodeled by WPA. Gallatin County Courthouse., 1938/6/15 - 1940/1/30
Warsaw Courthouse remodeled by WPA, 1938/6/15 - 1940/1/30
Warsaw Courthouse remodeled by WPA. Gallatin County., 1938/6/15 - 1940/1/30
Warsaw Courthouse remodeled by WPA. Warsaw Courthouse., 1938/6/15 - 1940/1/30
Sewer construction by WPA at Warsaw. Sewer Construction Warsaw Gallatin Co., [n.d.] - [n.d.]
Sewer construction by WPA at Warsaw. Sewer Construction Warsaw Gallatin Co., [n.d.] - [n.d.]
Bridge under construction by WPA. Bridge construction on Gallatin Co. Rd., [n.d.] - [n.d.]
Lick Creek Road constructed by WPA. Lick Creek Road Gallatin Co., [n.d.] - [n.d.]
Water mains being installed by WPA at Warsaw. Laying water mains Warsaw Gallatin Co., [n.d.] - [n.d.]
Garrard County
Garrard County Warehouse, 1939/4/21 - 1940/2/13
Portable Crusher on Buena Vista Road, Garrard Co., [n.d.] - [n.d.]
View of Buena Vista Road after construction was completed. Buena Vista Rd. Garrard Co., [n.d.] - [n.d.]
Scott's Fork Bridge Built by WPA (1940). Scott's Fork Bridge, Garrard Co., [n.d.] - [n.d.]
Grading for Mt. Hebron Road, Garrard Co., [n.d.] - [n.d.]
Mount Hebron Road construction completed. Mt. Hebron Road, Garrard Co., [n.d.] - [n.d.]
Lancaster Colored School. Negro school at Lancaster, Garrard Co., 1938/3/25 - 1939/8/15
Lancaster Colored School. Negro school at Lancaster, Garrard Co., 1938/3/25 - 1939/8/15
Lancaster Colored School. Colored School, Garrard Co, Lancaster, KY, 1938/3/25 - 1939/8/15
Garrard County Quarry operated by WPA, Garrard County Quarry, [n.d.] - [n.d.]
WPA Crusher Bin, Crusher Bin, Garrard Co., [n.d.] - [n.d.]
Fisher Ford Road constructed by WPA. Draining a structure at start of Fisher Ford Rd., Garrard Co., [n.d.] - [n.d.]
Fisher Ford Road constructed by WPA. Grading Fisher Ford Road., Garrard Co., [n.d.] - [n.d.]
Fisher Ford Road constructed by WPA. Fisher Ford Road., Garrard Co., [n.d.] - [n.d.]
Fisher Ford Road constructed by WPA. Fisher Ford Road., Garrard Co., [n.d.] - [n.d.]
WPA surfacing sewer trenches. Surfacing sewer trenches. Lancaster, Garrard Co., [n.d.] - [n.d.]
County Road constructed by WPA, Garrard County Rd., [n.d.] - [n.d.]
Culvert, Retaining Wall and Bridge construction by WPA, Garrard County Culvert., [n.d.] - [n.d.]
Culvert, Retaining Wall and Bridge construction by WPA. Pouring concrete for culvert on Sugar Creek Road, Garrard Co., [n.d.] - [n.d.]
Culvert, Retaining Wall and Bridge construction by WPA. Steel Arch culvert on Sugar Creek Road, Garrard Co., [n.d.] - [n.d.]
Culvert, Retaining Wall and Bridge construction by WPA. Retaining wall on Fair Yard Road, Garrard Co., [n.d.] - [n.d.]
Culvert, Retaining Wall and Bridge construction by WPA. Drainage structure, Garrard Co., [n.d.] - [n.d.]
Culvert, Retaining Wall and Bridge construction by WPA. Flooring bridge, Garrard Co., [n.d.] - [n.d.]
Fork's Church Road constructed by WPA. Forks Church Rd, Garrard Co., [n.d.] - [n.d.]
Fork's Church Road constructed by WPA. Forks Church Rd, Garrard Co., [n.d.] - [n.d.]
Gillespie Road constructed by WPA. Gillispi Road, Garrard Co., [n.d.] - [n.d.]
Kirksville Road constructed by WPA. Culvert construction on Kirkesville Road, Garrard Co., [n.d.] - [n.d.]
Kirksville Road constructed by WPA. Kirkesville Road, Garrard Co., [n.d.] - [n.d.]
Kirksville Road constructed by WPA. Kirkesville Road, Garrard Co., [n.d.] - [n.d.]
Kirksville Road constructed by WPA. Kirkesville Road, Garrard Co., [n.d.] - [n.d.]
Grant County
Williamstown Football Field. Grading Football Field at Williamstown, Grant Co., 1936/12/18 - 1937/3/13
Williamstown Football Field. Football Field Williamstown, KY, Grant Co., 1936/12/18 - 1937/3/13
Bridge Painting Project 1940, Bridge Painting, Grant Co., [n.d.] - [n.d.]
Bridge Painting Project 1940, Painting Bridge, Grant Co., [n.d.] - [n.d.]
Grant County Courthouse, Grant County, Williamstown, [n.d.] - [n.d.]
Charles A. Pettit, County Judge 1942, Judge Pettit, Grant Co., [n.d.] - [n.d.]
Bridge construction by WPA. Two span bridge, Grant Co., [n.d.] - [n.d.]
Bridge Construction by WPA. Concrete bridge, Grant Co., [n.d.] - [n.d.]
Williamstown Road constructed by WPA. Williamstown Rd, Grant Co., [n.d.] - [n.d.]
Cooperstown Road constructed by WPA. Cooperstown Rd, Grant Co., [n.d.] - [n.d.]
Lawrenceville Road constructed by WPA, Lawrenceville Road, Grant Co., [n.d.] - [n.d.]
WPA Warehouse, W.P.A. Whse, Grant Co. 7/25/38-7/20/39, 1938/7/25 - 1939/7/20
Graves County
Farmington School built prior to July 1, 1935 by Kentucky Emergency Relief Administration. Farmington School, Graves Co., K.E.R.A., [n.d.] - [n.d.]
Hickory School, 1936/8/17 - 1937/4/9
Hickory School, Grade School At Hickory Grove, 1936/8/17 - 1937/4/9
Hickory School, Grade School At Hickory Grove, 1936/8/17 - 1937/4/9
Graves County Courthouse 1942. Courthouse at Mayfield, Graves County., [n.d.] - [n.d.]
Sedalia High School, 1940/2/10 - 1941/6/25
Rear of Sedalia High School, 1940/2/10 - 1941/6/25
Sedalia High School, 1940/2/10 - 1941/6/25
Sedalia High School, 1940/2/10 - 1941/6/25
Entrance to Sedalia High School, 1940/2/10 - 1941/6/25
Sedalia High School, 1940/2/10 - 1941/6/25
WPA Malaria Control Drainage, Wilson Creek Drainage Ditch, [n.d.] - [n.d.]
WPA Malaria Control Drainage. Drain ditch for malaria control., [n.d.] - [n.d.]
WPA Malaria Control Drainage. Ferraprin Creek., [n.d.] - [n.d.]
Building constructed by NYA at Mayfield for training school. 1941., [n.d.] - [n.d.]
Famous Woolridge Monuments at Mayfield, 1941., [n.d.] - [n.d.]
Famous Woolridge Monuments at Mayfield, 1941., [n.d.] - [n.d.]
New Hope Road constructed by WPA. Surfacing New Hope Road., [n.d.] - [n.d.]
New Hope Road constructed by WPA., [n.d.] - [n.d.]
Viola Bridge under construction by WPA. Emergency construction of Viola Bridge., [n.d.] - [n.d.]
Obion Creek Bridge under construction by WPA., [n.d.] - [n.d.]
Red Duck Creek Culvert construct by WPA. Red Duck Creek triple box Culvert, Mayfield., [n.d.] - [n.d.]
Paving Construction by WPA. Street Construction at Mayfield., [n.d.] - [n.d.]
Paving Construction by WPA. Street Construction at Mayfield., [n.d.] - [n.d.]
Paving Construction by WPA. Concrete Pouring, Mayfield., [n.d.] - [n.d.]
Graves County Sewer construction by WPA. Sewer Installation, Mayfield., [n.d.] - [n.d.]
Wilson Creek drainage ditch constructed by WPA., [n.d.] - [n.d.]
Shovel being operated by WPA. Shovel operating in Graves Co., [n.d.] - [n.d.]
Equipment at Gravel Pit operated by WPA, [n.d.] - [n.d.]
Grayson County
George H. Goodman School, Big Clifty. Dedicated September 30, 1937, 1937/2/13 - 1937/10/28
Grayson Co. Courthouse at Litchfield, [n.d.] - [n.d.]
County garage. Grayson County Garage at Litchfield which houses the WPA offices., 1937/8/20 - 1940/10/30
City Hall and Fire Station at Litchfield, 1940/8/21 - 1940/10/30
City Hall and Fire Station at Litchfield, 1940/8/21 - 1940/10/30
Road in Grayson County constructed by WPA 1940, 1940
Retaining Walls on Litchfield sidewalk project under construction by WPA 1941., [n.d.] - [n.d.]
Grayson County Quarry operated by WPA, [n.d.] - [n.d.]
Leitchfield Sewers under construction by WPA., [n.d.] - [n.d.]
Leitchfield Sewers under construction by WPA., [n.d.] - [n.d.]
Shrewsburg School, 1936/7/11 - 1936/11/20
Edward's Mill Road constructed by WPA, [n.d.] - [n.d.]
Big Clifty Road constructed by WPA, [n.d.] - [n.d.]
Snap Road constructed by WPA, [n.d.] - [n.d.]
Hughes' Mill Road constructed by WPA, [n.d.] - [n.d.]
Sadler Road constructed by WPA. New Grade on Sadler Road., [n.d.] - [n.d.]
Sadler Road constructed by WPA., [n.d.] - [n.d.]
Stock of Concrete Pipe constructed by WPA, [n.d.] - [n.d.]
WPA Grayson County Road Sign, [n.d.] - [n.d.]
Concrete Magazines constructed by WPA for storing dynamite and caps., [n.d.] - [n.d.]
Millertown Road constructed by WPA, [n.d.] - [n.d.]
Scrapmetal stockpile collected by WPA in October 1942., [n.d.] - [n.d.]
Foundation for Clarkson School, 1941/7/23 - [n.d.]
Scaffolding on Clarkson School, 1941/7/23 - [n.d.]
Northwest view of Clarkson School, 1941/7/23 - [n.d.]
Work shack at Clarkson School. Grayson Co. Only [project I have visited which has flag flying., 1941/7/23 - [n.d.]
Rear view of Clarkson School, 1941/7/23 - [n.d.]
Main entrance to Clarkson School, 1941/7/23 - [n.d.]
View of West end of Clarkson School, 1941/7/23 - [n.d.]
Gym At Clarkson School, 1941/7/23 - [n.d.]
Close up of coverile work and rear door entering gym at Clarkson School., 1941/7/23 - [n.d.]
Library of Clarkson School from outside, 1941/7/23 - [n.d.]
Green County
Base for intake tank at Greensburg Waterworks, 1935/12/26 - 1937/4/3
Greensburg Waterworks. Rear view of water station & intake tank., 1935/12/26 - 1937/4/3
Greensburg Waterworks. Storage tank on top of big bush hill near Greensburg. Terrific pressure., 1935/12/26 - 1937/4/3
Greensburg Waterworks Pump Station, 1935/12/26 - 1937/4/3
Greensburg Waterworks, 1935/12/26 - 1937/4/3
Green County Courthouse at Greensburg, [n.d.] - [n.d.]
Pilson Smith, County Judge 1942, 1942
WPA Warehouse and office, [n.d.] - [n.d.]
Bridge under construction by WPA. Single span bridge under construction ., [n.d.] - [n.d.]
Liletown Road Bridge constructed by WPA, [n.d.] - [n.d.]
Stock of Concrete Pipe manufactured by WPA. Concrete pipe made in Green Co., [n.d.] - [n.d.]
Greensburg Sewer being installed by WPA. Installation of Greensburg Sewers thru almost solid rock., [n.d.] - [n.d.]
Greensburg Swere being installed by WPA. Greensburg sewers thru solid rock., [n.d.] - [n.d.]
Abutment for drainage. Structure under construction by WPA. Abuttments for Green Co. drainage structure., [n.d.] - [n.d.]
Bridge painting by WPA. Painting bridge across Barren River., [n.d.] - [n.d.]
Bridge painting by WPA. Painting bridge across Barren River., [n.d.] - [n.d.]
Clearing, grubbing and grading by WPA., [n.d.] - [n.d.]
Clearing, grubbing and grading by WPA. New grade., [n.d.] - [n.d.]
Clearing, grubbing and grading by WPA. New grade in Green Co., [n.d.] - [n.d.]
Portable crusher being operated by WPA. Portable crusher working in Green Co., [n.d.] - [n.d.]
Greensburg Streets constructed by WPA., [n.d.] - [n.d.]
Greensburg Streets constructed by WPA., [n.d.] - [n.d.]
Greensburg Streets constructed by WPA., [n.d.] - [n.d.]
Bush Creek Road constructed by WPA, [n.d.] - [n.d.]
Green County Quarry operated by WPA. Dempster-Dumpster at work in Green Co. quarry., [n.d.] - [n.d.]
Green County Quarry operated by WPA. Crusher heir at Green Co. Quarry., [n.d.] - [n.d.]
Greenup County
Stone work on Fullerton School, 1937/7/6 - 1939/12/18
Fullerton School, 1937/7/6 - 1939/12/18
Fullerton School, 1937/7/6 - 1939/12/18
Fullerton School, 1937/7/6 - 1939/12/18
G.W. Burchett, County Judge 1942, 1942
Shaping stones for Greenup Courthouse, 1938/1/4 - 1940/12/2
Stone arch basement entrance to Greenup Courthouse, 1938/1/4 - 1940/12/2
Rear view of Greenup Courthouse, 1938/1/4 - 1940/12/2
Greenup Courthouse rear view, 1938/1/4 - 1940/12/2
Greenup Courthouse, 1938/1/4 - 1940/12/2
Side view of Greenup Courthouse. Was closed down this week until Judge buys materials., 1938/1/4 - 1940/12/2
Greenup Courthouse, 1938/1/4 - 1940/12/2
Courtroom at Greenup Courthouse, 1938/1/4 - 1940/12/2
Greenup City School, 1938/3/9 - 1940/11/14
Greenup City School, 1938/3/9 - 1940/11/14
Greenup City School, 1938/3/9 - 1940/11/14
Greenup City School. New stone masonry school at Greenup, Greenup. Co., 1938/3/9 - 1940/11/14
WPA sewer construction at Raceland, [n.d.] - [n.d.]
WPA street construction at Russell. Concrete Sts. Russell., [n.d.] - [n.d.]
Bridge construction by WPA. Kehoe Road bridge., [n.d.] - [n.d.]
Bridge construction by WPA., [n.d.] - [n.d.]
Alcorn Road constructed by WPA, [n.d.] - [n.d.]
Flatwood Road constructed by WPA, [n.d.] - [n.d.]
Wingo Creek Road constructed by WPA, [n.d.] - [n.d.]
Whetsone Road constructed by WPA, [n.d.] - [n.d.]
Cheap to Advance Road, [n.d.] - [n.d.]
Hancock County
Rear of Hawesville School, 1937/8/9 - 1939/6/28
Hawesville School, City School at Hawesville, 1937/8/9 - 1939/6/28
Pellville Gymnasium, 1937/3/6 - 1938/7/14
Hawesville School. Rear of High School at Hawesville., 1937/8/9 - 1939/6/28
Home Economics and Manual Training Building in Hawesville, 1936/1/27 - 1936/11/29
Utility Road under construction by WPA, [n.d.] - [n.d.]
Bend in Ohio River at Hawesville, 1941, 1941
Easton Road constructed by WPA, [n.d.] - [n.d.]
Hawesville Domestic Science Building. Domestic science & school lunch bld'g at Hawesville., 1941/4/14 - 1941/10/17
Hawesville Domestic Science Building. Cafeteria and Domestic Science bld'g at Hawesville., 1941/4/14 - 1941/10/17
Street, curbing and guttering construction by WPA. Concrete streets. Patterson's Drug Store pictured., [n.d.] - [n.d.]
Street, curbing and guttering construction by WPA., [n.d.] - [n.d.]
Street, curbing and guttering construction by WPA. Excavation for curb & gutter at Hawesville., [n.d.] - [n.d.]
Scrap collected by WPA, October, 1942. Part of stockpile in Hawesville., [n.d.] - [n.d.]
Scrap collected by WPA, October, 1942. Close up of steel boiler in Hancock Co. Lots of good scrap here., [n.d.] - [n.d.]
Scrap collected by WPA, October, 1942. Loading boiler in Hancock Co., [n.d.] - [n.d.]
Scrap collected by WPA, October, 1942. Scrap stockpile at Hawesville., [n.d.] - [n.d.]
Hardin County
WPA Warehouse and Office, 1936/10/5 - 1937/1/23
Handrgarding by WPA in 1936 on Hardin Co. Road, [n.d.] - [n.d.]
White Hills School in Hardin Co., 1936/8/13 - 1937/10/7
Interior of Howe Valley School and Gymnasium, 1938/1/10 - 1938/12/10
Howe Valley School and Gymnasium, 1938/1/10 - 1938/12/10
Elizabethtown Water Works, 1937/8/24 - 1937/11/2
Elizabethtown Water Works. Spring which supplies E'town its water., 1937/8/24 - 1937/11/2
Vine Grove School Addition, 1938/7/13 - 1939/5/2
Preparing blacktop for Elizabethtown streets, [n.d.] - [n.d.]
Finished Elizabethtown Street constructed by WPA, [n.d.] - [n.d.]
Sonora Street construction in Elizabethtown, [n.d.] - [n.d.]
Ditching for storm sewers in Elizabethtown, [n.d.] - [n.d.]
Road shovel being operated by WPA, [n.d.] - [n.d.]
New grade on county road constructed by WPA, [n.d.] - [n.d.]
Star Mill Road constructed by WPA, [n.d.] - [n.d.]
Solway-Limp Road constructed by WPA, [n.d.] - [n.d.]
Hardin Springs Road constructed by WPA, [n.d.] - [n.d.]
County road constructed by WPA, [n.d.] - [n.d.]
County road constructed by WPA, [n.d.] - [n.d.]
Gravel surfaced county road constructed by WPA, [n.d.] - [n.d.]
County road constructed by WPA, [n.d.] - [n.d.]
Quarry access road under construction by WPA in 1941, 1941
Quarry access road under construction by WPA in 1941, 1941
Quarry access road with stone crusher in 1941, 1941
Stone crusher on quarry access road, [n.d.] - [n.d.]
Stone crusher on quarry access road, [n.d.] - [n.d.]
Quarry access road under construction by WPA in 1941, 1941
Grade and drain on quarry road in 1941, 1941
Crusher and skip-truck at quarry in 1941, 1941
Harlan County
#1 Fairway from tee on Harlan County Golf Course, 1940/10/23 - 1940/12/23
#4 Fairway from green tee (indicated by arrow) on Harlan Golf Course, 1940/10/23 - 1940/12/23
Water tank with site of clubhouse in distant rear at golf course, 1940/10/23 - 1940/12/23
#2 Fairway is long curvy over ravine on right. #3 Fairway is bling hole 3 par. Harlan County Golf Course, 1940/10/23 - 1940/12/23
Harlan County Golf Course, 1940/10/23 - 1940/12/23
#4 Fairway on Harlan County Golf Course, 1940/10/23 - 1940/12/23
Taken from #4 tee at Harlan County Golf Course. Man in lower center by tree is working on #6 tee., 1940/10/23 - 1940/12/23
Entrance drive up to Harlan County Golf Course Clubhouse., 1940/10/23 - 1940/12/23
Entrance to Harlan County Golf Course, 1940/10/23 - 1940/12/23
Foundation for Harlan County Golf Course Clubhouse, 1939/9/29 - 1940/12/23
Harlan County Golf Course Clubhouse under construction, 1939/9/29 - 1940/12/23
Harlan County Golf Course Clubhouse under construction, 1939/9/29 - 1940/12/23
Harland County Golf Course Clubhouse under construction (side view), 1939/9/29 - 1940/12/23
Completed Harlan County Golf Course Clubhouse, 1939/9/29 - 1940/12/23
#7 Green at Harlan County Golf Course in 1941, 1941
Completed Harlan County Golf Course Clubhouse, 1939/9/29 - 1940/12/23
#9 Fairway, green, and clubhouse at Harlan County Golf Course, 1939/9/29 - 1940/12/23
#2 Green at Harlan County Golf Course. Note terraces to keep ball from rolling to bottom of the hill, 1939/9/29 - 1940/12/23
Completed Harlan County Golf Course Clubhouse (side view), 1939/9/29 - 1940/12/23
Completed Harlan County Golf Course Clubhouse (side view), 1939/9/29 - 1940/12/23
Harlan County Golf Course with Clubhouse in background, 1939/9/29 - 1940/12/23
Harlan County Golf Course, 1939/9/29 - 1940/12/23
#5 Green at Harlan County Golf Course, 1939/9/29 - 1940/12/23
Blackstar School Gymnasium, 1938/3/12 - 1941/4/1
Blackstar School Gymnasium. A gem in this practically abandoned coal camp., 1938/3/12 - 1941/4/1
Blackstar School Gymnasium, 1938/3/12 - 1941/4/1
Interior of Cumberland City Hall in Harlan County, 1936/8/25 - 1936/1/24
Exterior of Cumberland City Hall in Harlan County, 1936/8/25 - 1936/1/24
Swimming pool at Girls Recreation Center in Harlan, 1935/11/8 - 1937/7/23
Swimming pool at Girls Recreation Center in Harlan, 1935/11/8 - 1937/7/23
Hall Memorial Gymnasium, 1936/1/31 - 1937/11/8
Hall Memorial Gymnasium, 1936/1/31 - 1937/11/8
Twila School, 1936/8/25 - 1937/1/9
Brookside School, 1936/7/29 - 1937/12/18
Brookside School, 1936/7/29 - 1937/12/18
Totz School, 1938/12/27 - 1939/6/23
Harlan (Colored) Negro School, 1937/1/11 - 1937/10/8
Harlan Negro School, 1937/1/11 - 1937/10/8
Harlan County Infirmary, 1938/9/9 - 1939/9/29
Verda School Gymnasium, 1938/5/9 - 1938/12/23
Verda School Gymnasium, 1938/5/9 - 1938/12/23
Verda School Gymnasium, 1938/5/9 - 1938/12/23
Bridge over Poor Fork Creek in Cumberland, [n.d.] - [n.d.]
Packhorse Librarian visiting mountain home, [n.d.] - [n.d.]
Forms for concrete retaining wall on Harlan street, [n.d.] - [n.d.]
Cumberland sewers under construction by WPA, [n.d.] - [n.d.]
Bulldozer operating at Benham Athletic Field, 1939/10/24 - 1941/6/9
Quarrying stone and excavating for bleachers for Benham Athletic Field, 1939/10/24 - 1941/6/9
Abuttments for bridge approaching Benham Stadium. Note fence on side of mountain in background., 1939/10/24 - 1941/6/9
Benham Stadium bleachers hewn from side of mountain., 1939/10/24 - 1941/6/9
Benham Stadium under construction, 1939/10/24 - 1941/6/9
Rear of Benham Stadium and dressing room, 1939/10/24 - 1941/6/9
Benham Stadium bleachers hewn from side of mountain., 1939/10/24 - 1941/6/9
Benham Stadium in side of cliff which overhangs bleachers in places, 1939/10/24 - 1941/6/9
Stone masonry bleachers at Benham Athletic Field, 1939/10/24 - 1941/6/9
Benham Stadium bleachers showing fence in background, 1939/10/24 - 1941/6/9
Clubhouse at Benham Golf Course, 1939/10/24 - 1941/6/9
Concrete retaining wall on one of Harlan's streets, 1940, 1940
Concrete street in Harlan, 1940, 1940
Entrance to Paddock Street, which is entrance to Green property, 1940, 1940
Paddock Street, which is also entrance to property of E.B. Green, 1940, 1940
New house being built on one of Harlan streets constructed by WPA, [n.d.] - [n.d.]
Quarrying stone along highway in Harlan County, 1940. When I passed there was no flag man., [n.d.] - [n.d.]
Quarry on top of Pine Mountain operated by WPA, 1940, 1940
Roadhouse moved about 100 yards and left partially on highway during flash flood, July 9, 1942. Sign says Pine Mt. Inn, [n.d.] - [n.d.]
Building concrete street in Harlan, 1941, 1941
Building concrete street in Harlan, 1941, 1941
Building concrete street in Harlan, 1941, 1941
Building concrete street in Harlan, 1941, 1941
Road leading to Kenvir School, 1939/1/19 - 1940/1/23
Kenvir School. Needs landscaping, 1939/1/19 - 1940/1/23
Kenvir School. Needs landscaping, 1939/1/19 - 1940/1/23
Pump and filtration house for Evarts Water Works, 1940/6/24 - 1941/12/31
Pump and filtration house for Evarts Water Works, 1940/6/24 - 1941/12/31
Pump and filtration house for Evarts Water Works, 1940/6/24 - 1941/12/31
Harlan Armory, 1940/11/13 - 1942/7/11
Harlan Armory, 1940/11/13 - 1942/7/11
Harlan Armory, 1940/11/13 - 1942/7/11
Harlan Armory, 1940/11/13 - 1942/7/11
Harlan Armory, 1940/11/13 - 1942/7/11
Harlan Armory, 1940/11/13 - 1942/7/11
First floor slab at Harlan Armory, 1940/11/13 - 1942/7/11
Form work on Harlan Armory, 1940/11/13 - 1942/7/11
Completed Harlan Armory, 1940/11/13 - 1942/7/11
Harrison County
Cynthiana street constructed by WPA, 1940, 1940
Cynthiana Stadium, 1940/6/6 - 1941/6/20
Driveway to Cynthiana Stadium, 1940/6/6 - 1941/6/20
Cynthiana Stadium, 1940/6/6 - 1941/6/20
Sidewalk, curb and gutter in Cynthiana constructed by WPA, [n.d.] - [n.d.]
Curb and gutter on Miller Street in Cynthiana, [n.d.] - [n.d.]
Surfacing Pike Street with concrete in Cynthiana, [n.d.] - [n.d.]
Junction Road constructed by WPA, [n.d.] - [n.d.]
Community sanitation project operated by WPA, [n.d.] - [n.d.]
WPA workers painting school, [n.d.] - [n.d.]
Mudlick Road constructed by WPA, [n.d.] - [n.d.]
Wornall Road constructed by WPA, [n.d.] - [n.d.]
Hart County
Ship truck at Priceville Road Quarry operated by WPA, [n.d.] - [n.d.]
Priceville Road Quarry operated by WPA, [n.d.] - [n.d.]
Priceville Road Quarry operated by WPA, [n.d.] - [n.d.]
Northtown Quarry operated by WPA, [n.d.] - [n.d.]
Portable stone crusher at Priceville Road Quarry operated by WPA, [n.d.] - [n.d.]
Horse Cave street constructed by WPA, 1941. Marcum and Vance Clothes, and Young's Department store signs in view., [n.d.] - [n.d.]
Horse Cave street constructed by WPA, 1941. Marcum and Vance Clothes, and Young's Department store signs in view., [n.d.] - [n.d.]
Horse Cave street under construction, 1941, 1941
Priceville Quarry Road constructed by WPA, 1940, 1940
Priceville Road constructed by WPA, 1940, 1940
Priceville Road under construction by WPA, 1940. WPA workers clearing brush from proposed roadway., [n.d.] - [n.d.]
Priceville Road after gravel surface application, 1940, 1940
Dog Run Road Bridge constructed by WPA, [n.d.] - [n.d.]
Dog Run Road Bridge constructed by WPA, [n.d.] - [n.d.]
Bonnieville Road constructed by WPA, [n.d.] - [n.d.]
Bonnieville Road constructed by WPA, [n.d.] - [n.d.]
WPA workers moving fence to widen road, [n.d.] - [n.d.]
Defries Road constructed by WPA, [n.d.] - [n.d.]
Canmer Road constructed by WPA, [n.d.] - [n.d.]
Canmer Road constructed by WPA, [n.d.] - [n.d.]
WPA Waterboy, [n.d.] - [n.d.]
WPA workers mixing concrete for Northtown Road, [n.d.] - [n.d.]
Installing concrete pipe along roadway, [n.d.] - [n.d.]
Leaning wheel graders in action on county road, [n.d.] - [n.d.]
Clearing and grading Bales Curve Road, [n.d.] - [n.d.]
New grade on county road, [n.d.] - [n.d.]
Grading county road, [n.d.] - [n.d.]
Clearing brush from proposed roadway, [n.d.] - [n.d.]
Cub Run Road construction, [n.d.] - [n.d.]
Rowletts Road constructed and graveled by WPA, [n.d.] - [n.d.]
Dynamite magazine constructed by WPA, [n.d.] - [n.d.]
WPA workers washing sand in creek, [n.d.] - [n.d.]
Henderson County
Henderson swimming pool and bathhouse, 1935/11/22 - 1937/7/10
WPA Office and Warehouse at Henderson, 1939/1/8 - 1939/9/16
WPA Office and Warehouse at Henderson, 1939/1/8 - 1939/9/16
Henderson Negro Commodity Distribution in Henderson, September, 1940, 1940
Henderson Negro Commodity Distribution in Henderson, September, 1940, 1940
Henderson Negro Commodity Distribution in Henderson, September, 1940. They brought every conceivable kind of push cart for hauling the commodities., [n.d.] - [n.d.]
Old courthouse at Henderson, [n.d.] - [n.d.]
County Judge Fred Crooks, Jr., 1942, 1942
Audubon Museum entrance driveway constructed by WPA, 1936/2/17 - 1939/6/30
Audubon Museum Tower constructed by WPA, 1936/2/17 - 1939/6/30
Audubon Museum Passage Porch, 1936/2/17 - 1939/6/30
Close up architecture of Gatehouse at Audubon Museum constructed by WPA, 1936/2/17 - 1939/6/30
Railing on porch of Audubon Museum, 1936/2/17 - 1939/6/30
Gatehouse entrance at Audubon Museum, 1936/2/17 - 1939/6/30
Gatehouse at Audubon Museum, 1936/2/17 - 1939/6/30
Bird's Eye View of Audubon Museum and Gatehouse, 1936/2/17 - 1939/6/30
Interior view of Audubon Museum, 1936/2/17 - 1939/6/30
Interior view of Audubon Museum looking down spiral staircase from second floor, 1936/2/17 - 1939/6/30
Interior of gallery of Audubon Museum, 1936/2/17 - 1939/6/30
Interior view of Audubon Museum showing entrance hall and spiral staircase., 1936/2/17 - 1939/6/30
Exterior view of Audubon Museum showing tower, 1936/2/17 - 1939/6/30
Exterior view of Audubon Museum showing tower, 1936/2/17 - 1939/6/30
Gatehouse at Audubon Park, 1936/2/17 - 1939/6/30
Rear view of Audubon Museum, 1936/2/17 - 1939/6/30
Gatehouse to Audubon Museum and Audubon Park, 1936/2/17 - 1939/6/30
Henderson sewer construction, [n.d.] - [n.d.]
Henderson sewer construction, [n.d.] - [n.d.]
Henderson sewer construction, [n.d.] - [n.d.]
Henderson county road construction by WPA, [n.d.] - [n.d.]
Henderson county road construction by WPA, [n.d.] - [n.d.]
Concrete street in Henderson, [n.d.] - [n.d.]
Street being paved with concrete in Henderson, [n.d.] - [n.d.]
Henderson street being readied for concrete paving, [n.d.] - [n.d.]
Henderson street being paved with concrete, [n.d.] - [n.d.]
Henry County
Main Street in New Castle constructed by WPA, [n.d.] - [n.d.]
WPA Warehouse in New Castle, 1941, 1941
Henry County Courthouse in New Castle, 1942, 1942
County Judge Orva D. Turner, 1942, 1942
Grading and resetting fence on county road by WPA, [n.d.] - [n.d.]
Resetting fence along a new grade on county road, [n.d.] - [n.d.]
Point Pleasant Road constructed by WPA, [n.d.] - [n.d.]
Turner's Road under construction by WPA, [n.d.] - [n.d.]
Foree Road curve constructed by WPA, [n.d.] - [n.d.]
Franklin Road constructed by WPA, [n.d.] - [n.d.]
New Castle street resurfaced by WPA, [n.d.] - [n.d.]
Drainage structure constructed by WPA, [n.d.] - [n.d.]
Quarry operated by WPA, [n.d.] - [n.d.]
Hickman County
Clinton street constructed by WPA, 1939, 1939
Rolling asphalt on Clinton, Ky. Street, 1939, 1939
Clinton street constructed by WPA, 1939, 1939
Clinton street constructed by WPA, 1939, 1939
Rock asphalt street in Clinton, Ky., 1939, 1939
County Judge R.L. Bolin, 1942, 1942
Milburn Road constructed by WPA, [n.d.] - [n.d.]
Scrap pile at Clinton, [n.d.] - [n.d.]
Hopkins County
Madisonville City Hall and Fire Station, 1935/11/6 - 1936/9/5
Earlington Gymnasium, 1937/1/11 - 1938/6/21
Hopkins County Hospital in Madisonville, 1936/4/7 - 1937/4/22
Hopkins County Hospital in Madisonville, 1936/4/7 - 1937/4/22
Hopkins County Hospital in Madisonville, 1936/8/25 - 1939/7/22
Hopkins County Hospital in Madisonville, 1936/8/25 - 1939/7/22
Ambulance entrance to Hopkins County Hospital in Madisonville, 1936/8/25 - 1939/7/22
Hopkins County Hospital in Madisonville (side view), 1936/8/25 - 1939/7/22
Hopkins County Hospital in Madisonville (front view), 1936/8/25 - 1939/7/22
Interior view of entrance to Hopkins County Hospital in Madisonville, 1936/8/25 - 1939/7/22
Ward room in Hopkins County Hospital in Madisonville, 1936/8/25 - 1939/7/22
Operating room in Hopkins County Hospital in Madisonville, 1936/8/25 - 1939/7/22
Madisonville High School (front view, winter scene), 1937/3/8 - 1939/9/6
Madisonville High School (side view, winter scene), 1937/3/8 - 1939/9/6
Madisonville High School (front view, fall/winter scene), 1937/3/8 - 1939/9/6
Madisonville High School (winter scene), 1937/3/8 - 1939/9/6
Madisonville High School entrance (summer scene), 1937/3/8 - 1939/9/6
Madisonville High School entrance (summer scene), 1937/3/8 - 1939/9/6
Madisonville High School (summer scene), 1937/3/8 - 1939/9/6
Home Economics Room at Madisonville High School, 1937/3/8 - 1939/9/6
WPA Warehouse and Office in Madisonville, 1937/7/22 - 1939/10/6
Mortons Gap School, 1938/10/15 - 1939/3/21
Wall Street in Dawson Springs, 1940, constructed by WPA, [n.d.] - [n.d.]
Concrete street in Dawson Springs under construction, 1940, 1940
City quarry in Madisonville, 1940, 1940
Stone crusher at city quarry in Madisonville, 1940, 1940
Storm sewer installation in Madisonville, [n.d.] - [n.d.]
Water line trench in Madisonville, [n.d.] - [n.d.]
Madisonville sewer construction, [n.d.] - [n.d.]
WPA District Office and Warehouse at Madisonville. Note county warehouse being built at left., 1940/9/9 - 1941/1/31
WPA District Office and Warehouse at Madisonville., 1940/9/9 - 1941/1/31
WPA District Office and Warehouse at Madisonville., 1940/9/9 - 1941/1/31
WPA District Office and Warehouse at Madisonville., 1940/9/9 - 1941/1/31
Foundation for Clubhouse at Madisonville Golf Course, 1938/7/7 - 1939/5/21
Concrete block Clubhouse at City Park in Madisonville, 1938/7/7 - 1939/5/21
Clubhouse at Madisonville Park and Golf Course (front and side view), 1938/7/7 - 1939/5/21
Clubhouse at Madisonville Golf Course (rear view), 1938/7/7 - 1939/5/21
#2 Fairway with lake in background at Madisonville Golf Course, 1938/7/7 - 1939/5/21
#1 Green at the Madisonville Golf Course, 1938/7/7 - 1939/5/21
Rustic bridge on Madisonville Golf Course, 1938/7/7 - 1939/5/21
Screened dining shelter in City Park at Madisonville, 1938/7/7 - 1939/5/21
Driveway entrance to Madisonville Golf Course, 1938/7/7 - 1939/5/21
#1 Fairway at Madisonville Golf Course, 1938/7/7 - 1939/5/21
Clubhouse with lake in background at Madisonville City Park, 1938/7/7 - 1939/5/21
Parking lot showing automobiles during dedication of Madisonville Golf Course, May 30, 1941, 1938/7/7 - 1939/5/21
Rear of concrete grandstand at Madisonville City Park, 1938/7/7 - 1939/5/21
Rear of concrete grandstand at Madisonville City Park. Expect to use for Kitty League baseball games this summer., 1938/7/7 - 1939/5/21
Concrete grandstand at Madisonville City Park. Note massive concrete arms to support steel roof., 1938/7/7 - 1939/5/21
Completed concrete grandstand at Madisonville City Park (front view)., 1938/7/7 - 1939/5/21
Construction of concrete grandstand for baseball field for Madisonville City Park., 1938/7/7 - 1939/5/21
Concrete grandstand at Madisonville City Park. Note concrete arms holding roof., 1938/7/7 - 1939/5/21
Concrete block fence around baseball diamond at Madisonville City Park., 1938/7/7 - 1939/5/21
Steel arch culvert in Earlington constructed by WPA, 1941, 1941
Steel arch drainage structure at Earlington built by WPA, 1941, 1941
New state highway in Hopkins County, 1941, 1941
Street work in Earlington, [n.d.] - [n.d.]
Black topping Hopkins County road., [n.d.] - [n.d.]
Hanson Road constructed by WPA, [n.d.] - [n.d.]
Jackson County
McKee High School (rear view), 1936/9/21 - 1938/11/3
McKee High School (side view), 1936/9/21 - 1938/11/3
McKee High School (side view), 1936/9/21 - 1938/11/3
Jackson County quarry, 1940, 1940
Stone crusher at Jackson County quarry, 1940, 1940
Jackson County quarry, 1940, 1940
Jackson County Courthouse at McKee, 1942, 1942
County Judge Milas Sparks, 1942, 1942
Librarians checking out rural carrier at McKee Public Library operated by WPA, [n.d.] - [n.d.]
Interior view of McKee Public Library operated by WPA, [n.d.] - [n.d.]
Tyner Gymnasium (front view), 1936/2/1 - 1937/6/1
Tyner Gymnasium (side view), 1936/2/1 - 1937/6/1
Tyner Gymnasium after fire., 1936/2/1 - 1937/6/1
Grayhawk School under construction, 1938/9/6 - 1938/12/23
Bridge abutment under construction by WPA, [n.d.] - [n.d.]
Grayhawk Road constructed by WPA, [n.d.] - [n.d.]
Jefferson County
Law Building at the University of Louisville, 1938/2/7 - 1939/7/20
Law Building at the University of Louisville, 1938/2/7 - 1939/7/20
Main Hallway of Law Building, University of Louisville, 1938/2/7 - 1939/7/20
Courtroom in Law Building, University of Louisville, 1938/2/7 - 1939/7/20
Interior view of Shawnee Branch Public Library, 1937/5/17 - 1938/2/26
Interior view of Shawnee Branch Public Library, 1937/5/17 - 1938/2/26
Shawnee Branch Public Library (front exterior view), 1937/5/17 - 1938/2/26
Shawnee Branch Public Library (front exterior view), 1937/5/17 - 1938/2/26
Jefferson County Fiscal Court Building (front view), 1938/4/5 - 1939/11/4
Jefferson County Fiscal Court Building (front view), 1938/4/5 - 1939/11/4
Jefferson County Fiscal Court Building (side view), 1938/4/5 - 1939/11/4
Entrance to Jefferson County Fiscal Court Building, 1938/4/5 - 1939/11/4
Stone work in center front of stage at Iroquois Park Amphitheatre, 5/20/1938 - July, 1939
Iroquois Park Amphitheatre (front view of stage), 5/20/1938 - July, 1939
Iroquois Park Amphitheatre (view of grandstand), 5/20/1938 - July, 1939
Iroquois Park Amphitheatre (side view of grandstand), 5/20/1938 - July, 1939
University of Louisville Laboratory under construction, [n.d.] - [n.d.]
WPA workers widening University of Louisville driveway, [n.d.] - [n.d.]
University of Louisville Service Building constructed by WPA, [n.d.] - [n.d.]
University of Louisville Service Building constructed by WPA, [n.d.] - [n.d.]
Central Park concrete tennis courts under construction, [n.d.] - [n.d.]
Completed concrete tennis courts at Central Park, [n.d.] - [n.d.]
Central Park pergola and arbor repaired by WPA, [n.d.] - [n.d.]
Central Park pergola and arbor repaired by WPA (interior view), [n.d.] - [n.d.]
North Pond Creek before clearing and deepening by WPA, [n.d.] - [n.d.]
North Pond Creek after clearing and deepening by WPA, [n.d.] - [n.d.]
Playground at Jackson and Walnut streets constructed by WPA, [n.d.] - [n.d.]
Playground at Jackson and Walnut streets constructed by WPA, [n.d.] - [n.d.]
Seneca Park Service Building constructed by WPA, [n.d.] - [n.d.]
Seneca Park caddy house and garage constructed by WPA, [n.d.] - [n.d.]
Seneca Park shelter house constructed by WPA at golf course, [n.d.] - [n.d.]
Seneca Park shelter house constructed by WPA at tennis courts, [n.d.] - [n.d.]
Seneca Park Golf Course constructed by WPA, [n.d.] - [n.d.]
WPA workers building #17 Green at Seneca Park Golf Course, [n.d.] - [n.d.]
WPA workers building #17 Green at Seneca Park Golf Course, [n.d.] - [n.d.]
Pools under construction at Fish Hatchery, [n.d.] - [n.d.]
Concrete pools under construction at Fish Hatchery, [n.d.] - [n.d.]
Completed pools constructed by WPA at Fish Hatchery, [n.d.] - [n.d.]
Shawnee Park Service Building constructed by WPA (side view), [n.d.] - [n.d.]
Old steel bridge at Medora, [n.d.] - [n.d.]
Concrete pilings for new Medora Bridge, [n.d.] - [n.d.]
New Medora Bridge under construction by WPA, [n.d.] - [n.d.]
New Medora Bridge under construction by WPA, [n.d.] - [n.d.]
Landscaping at Simmons University by WPA, [n.d.] - [n.d.]
Building under construction at Simmons University located at 8th and Kentucky, [n.d.] - [n.d.]
Valley Station Wading Pool, 1938/9/12 - 1940/5/22
Valley Station Filtration Equipment, 1938/9/12 - 1940/5/22
Valley Station Bathhouse, 1938/9/12 - 1940/5/22
Valley Station Swimming Pool, 1938/9/12 - 1940/5/22
Wall around athletic field at Manual Training High School, 1938/12/12 - 1940/3/30
Wall around athletic field at Manual Training High School, 1938/12/12 - 1940/3/30
Entrance to Manual Training High School, 1938/12/12 - 1940/3/30
Middletown Community House on Lexington Road, 1939/5/3 - 1939/11/15
Bowman Field Administration Building Addition, 1936/3/27 - 1937/11/11
Eastern Parkway before resurfacing, without curb and gutter, 1938, 1938
Catch basin construction on Eastern Parkway, 1938, 1938
Completed catch basin on Eastern Parkway, 1938, 1938
New gutters on Eastern Parkway, 1938, 1938
Resurfaced Eastern Parkway, 1938, 1938
Resurfaced Eastern Parkway, 1938, 1938
Resurfaced Eastern Parkway at Bardstown Road, 1938, 1938
Eastern Parkway with Speed Scientific School at the University of Louisville in the background., 1940/2/15 - 1941/11/7
Eastern Parkway with Speed Scientific School at the University of Louisville in the background., 1940/2/15 - 1941/11/7
Speed Engineering Building at the University of Louisville, 1940/2/15 - 1941/11/7
Speed Engineering Building at the University of Louisville, 1940/2/15 - 1941/11/7
Speed Scientific School at the University of Louisville, 1940/2/15 - 1941/11/7
Foundation of the Speed Engineering Building at the University of Louisville, 1940/2/15 - 1941/11/7
Construction of the Speed Engineering Building at the University of Louisville, 1940/2/15 - 1941/11/7
Construction of the Speed Scientific School at the University of Louisville, 1940/2/15 - 1941/11/7
Construction of the Speed Scientific School at the University of Louisville, 1940/2/15 - 1941/11/7
Construction of the Speed Scientific School at the University of Louisville, 1940/2/15 - 1941/11/7
Construction of the Speed Scientific School at the University of Louisville, 1940/2/15 - 1941/11/7
Construction of the Speed Scientific School at the University of Louisville, 1940/2/15 - 1941/11/7
Shawnee Park caretaker's house and garage, [n.d.] - [n.d.]
Algonquin Park shelter house, [n.d.] - [n.d.]
Shelter House at Taylor Boulevard Playground, [n.d.] - [n.d.]
Louisville yacht basin under construction, 1935/9/9 - 1938/8/2
WPA workers digging out Louisville yacht basin by hand, 1935/9/9 - 1938/8/2
Louisville yacht basin showing pilings and slips, 1935/9/9 - 1938/8/2
Louisville yacht basin under construction, 1935/9/9 - 1938/8/2
Completed Louisville yacht basin, 1935/9/9 - 1938/8/2
Completed Louisville yacht basin, 1935/9/9 - 1938/8/2
Completed Louisville yacht basin with moored watercraft, 1935/9/9 - 1938/8/2
Completed Louisville yacht basin with moored watercraft, 1935/9/9 - 1938/8/2
Back driveway to Waverly Hill before WPA construction, [n.d.] - [n.d.]
Back driveway to Waverly Hill after WPA construction, [n.d.] - [n.d.]
Front driveway at Waverly Hill constructed by WPA, [n.d.] - [n.d.]
Front driveway at Waverly Hill constructed by WPA, [n.d.] - [n.d.]
WPA workers building sloping banks to front driveway at Waverly Hill, [n.d.] - [n.d.]
Concrete slab for coal storage at Waverly Hill constructed by WPA, [n.d.] - [n.d.]
Landscaping at Waverly Hill by WPA, [n.d.] - [n.d.]
Construction of entrance driveway to Hazelwood Sanitorium constructed by WPA, [n.d.] - [n.d.]
WPA workers building entrance driveway to Hazelwood Sanitorium, [n.d.] - [n.d.]
Office and Guard House at Cherokee Park constructed by WPA, [n.d.] - [n.d.]
WPA workers widening box culvert on Seatonville Road, [n.d.] - [n.d.]
Completed box culvert on Seatonville Road, [n.d.] - [n.d.]
Lexington Road sidewalks under construction by WPA, [n.d.] - [n.d.]
Pipe made by WPA at Bowman Field, [n.d.] - [n.d.]
Strathmore Village sewer construction, [n.d.] - [n.d.]
Strathmore Village sewer construction, [n.d.] - [n.d.]
Wading pool constructed at Algonquin Park Playground by WPA, [n.d.] - [n.d.]
Children playing in wading pool at Algonquin Park Playground, [n.d.] - [n.d.]
WPA workers laying brick sidewalk at Algonquin Park Playground, [n.d.] - [n.d.]
WPA workers laying brick sidewalks on Madison Street, [n.d.] - [n.d.]
Dundee Road Sewer under construction by WPA, [n.d.] - [n.d.]
Sewer repair at 21st and Portland by WPA, [n.d.] - [n.d.]
Queen Street sewer under construction by WPA, [n.d.] - [n.d.]
Taylor Boulevard sewer under construction by WPA, [n.d.] - [n.d.]
Reflooring Cutoff Bridge on River Road by WPA. Old floor washed away during 1937 flood., [n.d.] - [n.d.]
Gymnasium at Philips Lane and Crittenden Drive constructed by WPA, [n.d.] - [n.d.]
Painting and repairing Ormsby Village by WPA, [n.d.] - [n.d.]
Painting and repairing Ormsby Village by WPA, [n.d.] - [n.d.]
View of Taylorsville Road from Bowman Field Administration Building in direction of Bardstown Road, August 15, 1937, 1937
Aerial view of Bowman Field prior to extension of runway and addition of parking area, 1940, 1940
Map of Bowman Field, November 13, 1940, 1940
Chain-link fence constructed by WPA surrounding Bowman Field, 1940, 1940
Quarry used for construction of runways at Bowman Field, [n.d.] - [n.d.]
Pouring concrete for runway extension at Bowman Field, [n.d.] - [n.d.]
Pouring concrete for runway extension at Bowman Field, [n.d.] - [n.d.]
Pouring concrete for runway extension at Bowman Field, [n.d.] - [n.d.]
Concrete parking apron constructed at Bowman Field by WPA, [n.d.] - [n.d.]
Sewer construction work at Bowman Field in connection with Defense Program, 1940-1941, 1941
Sewer construction work at Bowman Field in connection with Defense Program, 1940-1941, 1941
Sewer construction work at Bowman Field in connection with Defense Program, 1940-1941, 1941
Sewer construction work at Bowman Field in connection with Defense Program, 1940-1941, 1941
Sewer construction work at Bowman Field in connection with Defense Program, 1940-1941, 1941
Sewer construction work at Bowman Field in connection with Defense Program, 1940-1941, 1941
Sewer construction work at Bowman Field in connection with Defense Program, 1940-1941, 1941
Sewer construction work at Bowman Field in connection with Defense Program, 1940-1941, 1941
Sewer construction work at Bowman Field in connection with Defense Program, 1940-1941, 1941
Side drainage construction at Bowman Field in connection with Defense Program, 1940-1941, 1941
Jack hammer operators in action at Cannon's Lane Sewer at Bowman Field in connection with Defense Program, 1940-1941, 1941
Putting in joint reinforcement unit at Bowman Field in connection with Defense Program, 1940-1941, 1941
Surveying for Bowman Field expansion in connection with Defense Program, 1940-1941, 1941
Shoring on Cannon's Lane Sewer Project in connection with Defense Program, 1940-1941. Taken from bottom of ditch., [n.d.] - [n.d.]
Sewer construction at Bowman Field in connection with Defense Program, 1940-1941, 1941
Removing burlap from new poured concrete at Bowman Field in connection with Defense Program, 1940-1941, 1941
New grade and installation of drainage at Bowman Field in connection with Defense Program, 1940-1941, 1941
Batch plant fed by two drag lines at Bowman Field during Defense Program, 1940-1941, 1941
Straw for covering runways at Bowman Field during Defense Program, 1940-1941, 1941
Pouring concrete at Bowman Field during Defense Program, 1940-1941, 1941
Cannon's Lane Bridge at Bowman Field constructed during Defense Program, 1940-1941, 1941
Jack hammer operator working at night at Bowman Field during Defense Program, 1940-1941, 1941
Excavation on Cannon's Lane Sewer project at Bowman Field during Defense Program, 1940-1941, 1941
Sewer for Bowman Field constructed by WPA during Defense Program, 1940-1941, 1941
Cannon's Lane excavation at Bowman Field during Defense Program, 1940-1941, 1941
Completed section of Cannon's Lane Sewer at Bowman Field during Defense Program, 1940-1941, 1941
WPA workers pouring insert for Cannon's Lane Sewer during Defense Program, 1940-1941, 1941
Completed sections of Cannon's Lane Sewer at Bowman Field during Defense Program, 1940-1941, 1941
Grading and concrete surfacing of Cannon's Lane south of Lexington Road by WPA, 1942, 1942
Grading and concrete surfacing of Cannon's Lane south of Lexington Road by WPA, 1942, 1942
Grading and concrete surfacing of Cannon's Lane south of Lexington Road by WPA, 1942, 1942
Grading and concrete surfacing of Cannon's Lane south of Lexington Road by WPA, 1942, 1942
Grading and concrete surfacing of Cannon's Lane south of Lexington Road by WPA, 1942, 1942
Cannon's Lane constructed by WPA, 1942, 1942
Cannon's Lane constructed by WPA, 1942, 1942
Cannon's Lane constructed by WPA, 1942, 1942
Bridge on Cannon's Lane constructed by WPA, [n.d.] - [n.d.]
Bridge on Cannon's Lane constructed by WPA, [n.d.] - [n.d.]
Concrete paving at State Fairgrounds by WPA, 1941, 1941
Concrete paving at State Fairgrounds by WPA, 1941, 1941
Concrete paving at State Fairgrounds by WPA, 1941, 1941
Concrete paving at State Fairgrounds by WPA, 1941, 1941
Cattle barns at State Fairgrounds under construction by WPA, 1940-1941, 1941
Concrete foundation for stables at State Fairgrounds constructed by WPA, 1940-1941, 1941
Cattle barns at State Fairgrounds under construction by WPA, 1940-1941, 1941
Trusses for stables at State Fairgrounds, 1940-1941, 1941
WPA sign on barn construction site at State Fairgrounds, 1940-1941, 1941
Completed cattle barns at State Fairgrounds built by WPA, 1940-1941, 1941
Completed cattle barns at State Fairgrounds built by WPA, 1940-1941, 1941
Completed cattle barns at State Fairgrounds built by WPA, 1940-1941, 1941
Completed cattle barns at State Fairgrounds built by WPA, 1940-1941, 1941
Completed stables at State Fairgrounds built by WPA, 1940-1941, 1941
Completed stables at State Fairgrounds built by WPA, 1940-1941, 1941
Completed stables at State Fairgrounds built by WPA, 1940-1941, 1941
Footings for State Fairgrounds restaurant, 1941/6/10 - [n.d.]
Excavation for State Fairgrounds restaurant, 1941/6/10 - [n.d.]
State Fairgrounds restaurant construction, 1941/6/10 - [n.d.]
State Fairgrounds restaurant construction, 1941/6/10 - [n.d.]
State Fairgrounds restaurant construction, 1941/6/10 - [n.d.]
State Fairgrounds restaurant construction, 1941/6/10 - [n.d.]
State Fairgrounds restaurant construction, 1941/6/10 - [n.d.]
State Fairgrounds restaurant construction, 1941/6/10 - [n.d.]
State Fairgrounds restaurant construction, 1941/6/10 - [n.d.]
State Fairgrounds restaurant construction, 1941/6/10 - [n.d.]
State Fairgrounds restaurant construction, 1941/6/10 - [n.d.]
State Fairgrounds restaurant construction, 1941/6/10 - [n.d.]
Roof restaurant and dance floor construction at State Fairgrounds restaurant, 1941/6/10 - [n.d.]
Roof dance floor construction at State Fairgrounds restaurant, 1941/6/10 - [n.d.]
Backview of State Fairgrounds restaurant construction, 1941/6/10 - [n.d.]
Roof garden and dance floor construction at State Fairgrounds restaurant, 1941/6/10 - [n.d.]
Roof garden and dance floor construction at State Fairgrounds restaurant, 1941/6/10 - [n.d.]
Roof garden and dance floor construction at State Fairgrounds restaurant, 1941/6/10 - [n.d.]
State Fairgrounds restaurant front entrance construction, 1941/6/10 - [n.d.]
State Fairgrounds restaurant front entrance construction, 1941/6/10 - [n.d.]
4-H Club Building construction at State Fairgrounds, 11/26/1941 - March, 1943
4-H Club Building construction at State Fairgrounds, 11/26/1941 - March, 1943
4-H Club Building construction at State Fairgrounds, 11/26/1941 - March, 1943
4-H Club Building construction at State Fairgrounds, 11/26/1941 - March, 1943
4-H Club Building construction at State Fairgrounds, 11/26/1941 - March, 1943
4-H Club Building construction at State Fairgrounds, 11/26/1941 - March, 1943
4-H Club Building construction at State Fairgrounds, 11/26/1941 - March, 1943
4-H Club Building construction at State Fairgrounds, 11/26/1941 - March, 1943
4-H Club Building construction at State Fairgrounds, 11/26/1941 - March, 1943
4-H Club Building construction at State Fairgrounds, 11/26/1941 - March, 1943
4-H Club Building construction at State Fairgrounds, 11/26/1941 - March, 1943
4-H Club Building construction at State Fairgrounds, 11/26/1941 - March, 1943
Interior of Horse Show Pavilion at State Fairgrounds painted by WPA, [n.d.] - [n.d.]
Interior of Horse Show Pavilion at State Fairgrounds painted by WPA, [n.d.] - [n.d.]
Construction of Shawnee Park River Driveway, [n.d.] - [n.d.]
WPA workers building Shawnee Park driveway, [n.d.] - [n.d.]
WPA workers paving Shawnee Park driveway, [n.d.] - [n.d.]
River Road in Shawnee Park constructed by WPA, [n.d.] - [n.d.]
Shawnee Park driveway constructed by WPA, [n.d.] - [n.d.]
Shawnee Park driveway constructed by WPA, [n.d.] - [n.d.]
Shawnee Park driveway constructed by WPA, [n.d.] - [n.d.]
Iroquois Park Hill constructed by WPA, [n.d.] - [n.d.]
WPA workers surfacing Taylor Boulevard, [n.d.] - [n.d.]
Laying gravel on Brownsboro Road that was constructed by WPA, [n.d.] - [n.d.]
Brownsboro Road constructed by WPA, [n.d.] - [n.d.]
Brownsboro Road constructed by WPA, [n.d.] - [n.d.]
Mitchell Hill Road constructed by WPA, [n.d.] - [n.d.]
Mitchell Hill Road constructed by WPA, [n.d.] - [n.d.]
Fireman Road constructed by WPA, [n.d.] - [n.d.]
Fireman Road constructed by WPA, [n.d.] - [n.d.]
Stone retaining wall on Mockingbird Valley Road under construction by WPA, [n.d.] - [n.d.]
Mockingbird Valley Road constructed by WPA, [n.d.] - [n.d.]
Mockingbird Valley Road constructed by WPA, [n.d.] - [n.d.]
Mockingbird Valley Road constructed by WPA, [n.d.] - [n.d.]
Mount Washington Road constructed by WPA, [n.d.] - [n.d.]
Cooper Chapel Road constructed by WPA, [n.d.] - [n.d.]
Keys Ferry Road constructed by WPA, [n.d.] - [n.d.]
Fairdale Road constructed by WPA, [n.d.] - [n.d.]
Arnoldtown Road graded and constructed by WPA, [n.d.] - [n.d.]
Arnoldtown Road graded and constructed by WPA, [n.d.] - [n.d.]
Resurfacing of Newburg Road by WPA, [n.d.] - [n.d.]
Resurfacing of Newburg Road by WPA, [n.d.] - [n.d.]
Third Street Road constructed by WPA, [n.d.] - [n.d.]
Shepherdsville Road constructed by WPA, [n.d.] - [n.d.]
Surfacing of Cherokee Parkway by WPA, [n.d.] - [n.d.]
Rock asphalt machine surfacing Mud Lane, [n.d.] - [n.d.]
Surfacing and rolling Mud Lane, [n.d.] - [n.d.]
Mud Road constructed by WPA, [n.d.] - [n.d.]
Frankfort Avenue resurfaced by WPA, [n.d.] - [n.d.]
Frankfort Avenue resurfaced by WPA, [n.d.] - [n.d.]
Strathmoor Boulevard constructed by WPA, [n.d.] - [n.d.]
Algonquin Parkway sidewalk constructed by WPA, [n.d.] - [n.d.]
Concrete paving on Ninth Street by WPA, [n.d.] - [n.d.]
Double lane driveway on Zorn Avenue constructed by WPA, [n.d.] - [n.d.]
Swan Avenue at Oak Street under construction by WPA, [n.d.] - [n.d.]
Louisville asphalt street constructed by WPA, [n.d.] - [n.d.]
St. Matthews Armory construction, 1940/11/23 - 1942/7/16
St. Matthews Armory construction, 1940/11/23 - 1942/7/16
St. Matthews Armory construction, 1940/11/23 - 1942/7/16
St. Matthews Armory construction, 1940/11/23 - 1942/7/16
Form work for concrete arches for St. Matthews Armory, 1940/11/23 - 1942/7/16
Form work for concrete arches for St. Matthews Armory, 1940/11/23 - 1942/7/16
St. Matthews Armory construction, 1940/11/23 - 1942/7/16
Stone crusher and warehouse on Brownsboro Road, 1940, 1940
Quarry face and stone crusher, [n.d.] - [n.d.]
Clearing overburden on quarry, [n.d.] - [n.d.]
Seneca Park Club House constructed by WPA, [n.d.] - [n.d.]
Seneca Park Club House showing addition, [n.d.] - [n.d.]
County road constructed by WPA, 1940, 1940
County road constructed by WPA, 1940, 1940
Work shocks constructed by WPA and in use on Bowman Field Sewer Project, 1940, 1940
Dynamite magazine on Bowman Field Project, 1940, 1940
Jefferson County bridge constructed by WPA, 1940, 1940
Jefferson County bridge constructed by WPA, 1940, 1940
Jefferson County bridge built on concrete pilings, 1940, 1940
Algonquin Parkway sewer constructed by WPA, 1941-1942, 1942
Algonquin Parkway sewer constructed by WPA, 1941-1942, 1942
Algonquin Parkway sewer constructed by WPA, 1941-1942, 1942
Brownsboro road quarry, 1942. Unusual rock formation at Brownsboro road quarry makes stripping costly., [n.d.] - [n.d.]
Brownsboro road quarry, 1942. Unusual rock formation at Brownsboro road quarry makes stripping costly., [n.d.] - [n.d.]
Brownsboro road quarry, [n.d.] - [n.d.]
Route road drainage structure operated by WPA, 1942, 1942
Beulah Church Road preparing to build headwall on cross drainage structure., [n.d.] - [n.d.]
Drainage structure and grade on Route Road between Jefferson and Bullitt County line, 1942, 1942
Herr Lane asphalt surface constructed by WPA, 1942, 1942
Redirecting and draining Goose Creek Road by WPA, 1942. New location and drainage structure designed to eliminate sharp turn., [n.d.] - [n.d.]
Manslick Road Bridge constructed by WPA, 1941. Old country bridge failed making new bridge necessary., [n.d.] - [n.d.]
Manslick Road Bridge constructed by WPA, 1941. One of six similar bridges built in county., [n.d.] - [n.d.]
Manslick Road Bridge constructed by WPA, 1941., [n.d.] - [n.d.]
Junk metal at Brownsboro quarry, 1942., [n.d.] - [n.d.]
Scale House at County Quarry constructed by WPA, [n.d.] - [n.d.]
Rubber tires stockpiled at State Fairgrounds, [n.d.] - [n.d.]
Murphy Lane ready for asphalt top constructed by WPA, 1942, 1942
Mellwood Avenue ready for asphalt top, 1942, 1942
Belltown Lane ready for asphalt top, 1942, 1942
WPA Sign on Louisville car rail removal project, 1942-1943, 1943
Car rail removal on West Broadway, 1942-1943, 1943
Car rail removal on West Broadway, 1942-1943, 1943
Car rail removal on West Broadway, 1942-1943, 1943
15th Street car rail removal, 1942-1943, 1943
Car rail removal on West Broadway, 1942-1943, 1943
Car rail removal on West Broadway, 1942-1943, 1943
15th Street car rail removal, 1942-1943, 1943
Car rail removal on West Broadway, 1942-1943, 1943
15th Street car rail removal, 1942-1943, 1943
15th Street car rail removal, 1942-1943, 1943
15th Street car rail removal, 1942-1943, 1943
15th Street car rail removal, 1942-1943, 1943
15th Street car rail removal, 1942-1943, 1943
15th Street car rail removal, 1942-1943, 1943
Car rail removal on West Broadway, 1942-1943, 1943
Jessamine County
Nicholasville street under construction by WPA, [n.d.] - [n.d.]
Wilmore Street constructed by WPA, [n.d.] - [n.d.]
Wilmore School, 1937/7/7 - 1938/12/20
Cut for stonemasonry storm sewer in Nicholasville, [n.d.] - [n.d.]
Drainage box in Wilmore, [n.d.] - [n.d.]
Storm drain covered with concrete slab in Nicholasville, [n.d.] - [n.d.]
Marble Creek School, 1936/8/11 - 1936/10/25
Ash Grove Road constructed by WPA, [n.d.] - [n.d.]
Glass Run Road constructed by WPA, [n.d.] - [n.d.]
Glass Milk Road constructed by WPA, [n.d.] - [n.d.]
Jessamine county road constructed by WPA, [n.d.] - [n.d.]
Johnson County
Paintsville City Hall, 1936/10/5 - 1940/5/24
Paintsville Jail, 1936/10/5 - 1940/5/24
Paintsville City Hall and Fire Station, showing proximity of cliff and mountain, 1936/10/5 - 1940/5/24
Paintsville City Hall and Fire Station, 1936/10/5 - 1940/5/24
Completed City Hall and Fire Station in Paintsville. WPA employment office is on second floor on the right., 1936/10/5 - 1940/5/24
Paintsville City Hall and Fire Station, showing proximity of cliff and mountain, 1936/10/5 - 1940/5/24
Paintsville City Hall under construction, 1936/10/5 - 1940/5/24
County Judge W.J. Ward, [n.d.] - [n.d.]
View of golf course from porch of Paintsville Club House. Mountains in background., 1937/4/16 - 1939/9/19
Second floor porch of Paintsville Club House commanding view of 9 hole golf course., 1937/4/16 - 1939/9/19
Paintsville Club House (side view) showing how cliff was blasted off to form setting. Taken from parking lot., 1937/4/16 - 1939/9/19
Paintsville Club House from #2 Fairway., 1937/4/16 - 1939/9/19
Paintsville Club House from #1 Green., 1937/4/16 - 1939/9/19
Paintsville Club House from #1 Fairway., 1937/4/16 - 1939/9/19
Van Lear School, 1938/2/14 - 1940/6/19
Quarrying building stone by WPA, [n.d.] - [n.d.]
WPA Water Boy, [n.d.] - [n.d.]
Concrete street paving in Paintsville, [n.d.] - [n.d.]
Concrete street paving in Paintsville, [n.d.] - [n.d.]
Paintsville sewer construction by WPA, [n.d.] - [n.d.]
Drainage structure and road construction in Johnson County by WPA, [n.d.] - [n.d.]
Drainage structure and road construction in Johnson County by WPA, [n.d.] - [n.d.]
WPA workers grading road in Johnson County by hand., [n.d.] - [n.d.]
WPA workers building road in Johnson County by hand., [n.d.] - [n.d.]
Road construction in Johnson County, [n.d.] - [n.d.]
Retaining wall on new grade in Johnson County, [n.d.] - [n.d.]
Grade and drain in Johnson County, [n.d.] - [n.d.]
WPA workers breaking stone on Johnson County road, [n.d.] - [n.d.]
First course of surfacing on Johnson County road, [n.d.] - [n.d.]
Draft animal used for road construction, [n.d.] - [n.d.]
Grade and drain in Johnson County, [n.d.] - [n.d.]
Bridge in Johnson County built by WPA, 1940, 1940
Bridge in Johnson County built by WPA, 1940, 1940
Bank, slope, and grade on Johnson County road built by WPA, 1940, 1940
Johnson county road built by WPA, 1940, 1940
Cut in hill (rifle sight) on state highway in Johnson County built by WPA, 1940, 1940
Grade and drain in Johnson County, 1940, 1940
Concrete street construction in Paintsville, 1940, 1940
County road in Johnson County constructed by WPA, 1940, 1940
Meade-Memorial Gymnasium. They beat Inez 3 straight times this year., 1936/10/5 - 1940/5/24
WPA Warehouse and Office in Paintsville, 1938/1/21 - 1938/7/18
Kenton County
Shelter House at Devou Park, 1939/12/31 - 1941/7/26
Stone masonry bench in Devou Park, 1939/12/31 - 1941/7/26
Shelter House at Devou Park, 1939/12/31 - 1941/7/26
Band shell in Devou Park (side view), 1939/12/31 - 1941/7/26
Concrete band shell in Devou Park (front view), 1939/12/31 - 1941/7/26
WPA sign at Devou Park, 1939/12/31 - 1941/7/26
One of four bathhouses and swimming pools at Devou Park, 1939/12/31 - 1941/7/26
Swimming pool at Devou Park, 1939/12/31 - 1941/7/26
#8 Green and Fairway from tee on Devou Park Golf Course, 1939/1/10 - 1940/6/29
Section of Ludlow Stadium, 1937/4/5 - 1939/4/26
Ludlow sewer constructed by WPA, [n.d.] - [n.d.]
Flooded section of Covington. Netherlands Plaza Building in center background, 1937, 1937
Concrete sidewalks in Goebel Park constructed by WPA, [n.d.] - [n.d.]
Street construction in Ludlow, [n.d.] - [n.d.]
Montclair Street construction in Ludlow, [n.d.] - [n.d.]
Box culvert constructed by WPA, [n.d.] - [n.d.]
Grading and landscaping at Earlanger High School, 1937/8/2 - 1938/11/19
Latonia Avenue under construction by WPA, [n.d.] - [n.d.]
Concrete street leading to Latonia constructed by WPA, [n.d.] - [n.d.]
Disposal plant at Lakeside, Ky., 1936/12/4 - 1938/6/13
Park Hills sewer construction, [n.d.] - [n.d.]
Park Hills sewer construction, [n.d.] - [n.d.]
Driveway to Senior Independence School, 1937/8/3 - 1938/7/27
Drain on grounds of Senior Independence School, 1937/8/3 - 1938/7/27
Driveway construction to Senior Independence School, 1937/8/3 - 1938/7/27
Widening Highway #25 and putting in curbing by WPA in connection with Defense Project from Covington to Lexington, 1942, 1942
Widening Highway #25 and putting in curbing by WPA in connection with Defense Project from Covington to Lexington, 1942, 1942
Old Post Office Building in Covington where Vocational Training Program is operated by WPA, 1942, 1942
Old Post Office Building in Covington where Vocational Training Program is operated by WPA, 1942, 1942
Elsmere School built by WPA, 1941/3/26 - 1942/12/23
Elsmere School built by WPA (rear view), 1941/3/26 - 1942/12/23
Entrance to Elsmere School showing precast concrete pillars. Very poor job., 1941/3/26 - 1942/12/23
Elsmere School built by WPA (front view), 1941/3/26 - 1942/12/23
Widening 7th Street in Covington, [n.d.] - [n.d.]
Widening 7th Street in Covington, [n.d.] - [n.d.]
Madison Avenue, the busiest street in Covington, paved with concrete without stopping traffic., [n.d.] - [n.d.]
Street widening in Covington. Street car in background., [n.d.] - [n.d.]
Street construction in Covington, [n.d.] - [n.d.]
Removing car rails in Covington, [n.d.] - [n.d.]
WPA workers removing street car rails in Covington, [n.d.] - [n.d.]
WPA workers removing street car rails in Covington, [n.d.] - [n.d.]
Street construction in Elsmere, Ky., [n.d.] - [n.d.]
Street surfacing in Elsmere, Ky., [n.d.] - [n.d.]
Knott County
Carr Creek School swinging bridge. Pier of new bridge being built by National Youth Administration., [n.d.] - [n.d.]
Trees around Carr Creek School, 1940. You can't see the school because of the trees., [n.d.] - [n.d.]
Carr Creek School. State Champions and Semi-Finalists in National Championship several years ago., 1935/11/30 - 1940/1/24
Stone work on Carr Creek School., 1935/11/30 - 1940/1/24
Carr Creek School under construction., 1935/11/30 - 1940/1/24
Carr Creek School (front view), 1935/11/30 - 1940/1/24
Bridge constructed over Cutshin Creek by WPA, 1940, 1940
Packhorse Library Building in Hindman, Ky., [n.d.] - [n.d.]
Road to Silas Breeding's house, winter 1939-1940., [n.d.] - [n.d.]
Road to Silas Breeding's house, winter 1939-1940. Breeding's house is in background., [n.d.] - [n.d.]
Ice and snow covered trees on mountain in Knott County, winter 1939-1940, 1940
Snow in the mountains of Knott County, winter of 1939-1940, 1940
Snow in the mountains of Knott County, winter of 1939-1940, 1940
Road to Silas Breeding's house, winter of 1939-1940, 1940
Knott County Jail in Hindman, Ky., 1936/8/3 - 1935/10/31
Packhorse Library Carriers mounted on horses outside Packhorse Library in Hindman, Ky., [n.d.] - [n.d.]
Interior of mountain cabin. Packhorse Library Carrier is seated at wooden table., [n.d.] - [n.d.]
Packhorse Library Carrier mounted and ready to leave mountain cabin after delivering books., [n.d.] - [n.d.]
Sassafras School constructed by WPA, 1935/8/30 - 1936/12/10
Sassafras School constructed by WPA, 1935/8/30 - 1936/12/10
Caney Creek School construction site at Pippa Pass, 1935/11/25 - 1939/10/12
Caney Creek School at Pippa Pass under construction, 1935/11/25 - 1939/10/12
Knott County road before WPA construction showing automobile mired in the mud., [n.d.] - [n.d.]
Grade and drain on Hindman to Hazard road., [n.d.] - [n.d.]
Road construction in Knott County., [n.d.] - [n.d.]
WPA workers constructing grade and drain on Knott County road., [n.d.] - [n.d.]
WPA workers surfacing road in Knott County., [n.d.] - [n.d.]
Road constructed by WPA in Knott County (winter scene)., [n.d.] - [n.d.]
Irishman Creek Bridge constructed by WPA., [n.d.] - [n.d.]
Abuttments for drainage structure., [n.d.] - [n.d.]
Piers for bridge across Carr Creek., [n.d.] - [n.d.]
Starting scrap pile at Hindman, 1942., [n.d.] - [n.d.]
James Nipper delivering his scrap by wooden sled near Mousie, KY, 1942. WPA collection truck in background., [n.d.] - [n.d.]
James Nipper (in front of mule) watching loading of his scrap, 1942, 1942
Bringing in truckload of scrap to Hindman, 1942., [n.d.] - [n.d.]
Carmen Hughes, WPA foreman, weighing scrap, 1942., [n.d.] - [n.d.]
Weighing truck of scrap in Hindman, 1942, 1942
James Nipper watching his scrap being loaded near Mousie, KY., 1942, 1942
James Nipper watching his scrap being loaded near Mousie, KY., 1942, 1942
James Nipper watching Carmen Hughes, WPA foreman, weighing his scrap near Mousie, KY., 1942, 1942
Where U.S. Post Office used to be prior to flash flood of July 9, 1942., [n.d.] - [n.d.]
Small mountain store on its side after flash flood of July 9, 1942., [n.d.] - [n.d.]
House carried away about half a mile by flash flood of July 9, 1942, and carried to the edge of a cornfield at Breeding Creek., [n.d.] - [n.d.]
House damaged by flash flood of July 9, 1942. Note small American flag flying in front yard., [n.d.] - [n.d.]
Knott County landmark (hotel?) damaged but still standing after flash flood of July 9, 1942., [n.d.] - [n.d.]
House washed onto highway at Sassafras, KY by July 9, 1942 flash flood., [n.d.] - [n.d.]
Houses jammed together and left on highway at Sassafras, KY by July 9, 1942 flash flood., [n.d.] - [n.d.]
Preacher Coombs' house washed against highway bridge at Sassafras, KY by July 9, 1942 flash flood., [n.d.] - [n.d.]
Knox County
Baker School under construction by WPA., 1935/10/23 - 1936/9/1
Hammond School constructed by WPA., 1935/10/15 - 1936/12/22
Knox County Courthouse in Barbourville, terribly rundown in 1942., [n.d.] - [n.d.]
Central High School Gymnasium in Pineville, KY., 1935/11/8 - 1937/8/21
Central High School Gymnasium in Pineville, KY., 1935/11/8 - 1937/8/21
Central High School Gymnasium in Pineville, KY., 1935/11/8 - 1937/8/21
Flat Lick Junior High School., 1935/11/23 - 1936/9/20
Flat Lick School constructed by WPA, 1935/11/23 - 1936/9/20
Flat Lick School constructed by WPA, 1935/11/23 - 1936/9/20
DeWitt School under construction by WPA, 1935/11/23 - 1937/4/22
DeWitt School constructed by WPA, 1935/11/23 - 1937/4/22
Stone work on Barbourville City Hall and Fire Station., 1935/11/23 - 1937/4/7
Barbourville City Hall and Fire Station constructed by WPA, 1935/11/23 - 1937/4/7
Artemus School constructed by the WPA, 1935/11/23 - 1937/6/19
Artemus School constructed by the WPA, 1935/11/23 - 1937/6/19
Bull Creek School under construction by WPA, 1935/12/23 - 1936/6/29
Bull Creek School under construction by WPA, 1935/12/23 - 1936/6/29
New Bethel Consolidated High School Gymnasium., 1935/12/16 - 1937/4/16
New Bethel Consolidated High School (front view), 1935/12/16 - 1937/4/16
Lynn Camp School (side view), 1935/12/13 - 1937/7/5
Lynn Camp School (front view), 1935/12/13 - 1937/7/5
Jeff's Creek School, 1936/10/26 - 1937/4/12
Barbourville School addition., 1937/8/23 - 1939/4/29
Construction of caretaker's house at Dr. Thomas Walker State Park., 1938/3/23 - 1939/1/31
Caretaker's house at Dr. Thomas Walker State Park., 1938/3/23 - 1939/1/31
Hubb's one-room school., 1938/9/8 - 1938/11/11
First log house built in Kentucky, 1782, [n.d.] - [n.d.]
First log house built in Kentucky, 1782, [n.d.] - [n.d.]
New school under construction in Gray's, KY., 1942/1/1 - 1942/12/29
Foundation for new school in Gray's, KY., 1942/1/1 - 1942/12/29
New school under construction in Gray's, KY. "Going to be a whopper.", 1942/1/1 - 1942/12/29
Foundation for new school in Gray's, KY., 1942/1/1 - 1942/12/29
Gray's School construction viewed from highway., 1942/1/1 - 1942/12/29
Foundation for new school in Gray's, KY., 1942/1/1 - 1942/12/29
Construction of new school in Gray's, KY showing concrete block backup on stone masonry., 1942/1/1 - 1942/12/29
Huge stone masonry school at Gray's, KY., 1942/1/1 - 1942/12/29
New school in Gray's, KY under construction., 1942/1/1 - 1942/12/29
Pouring slab on bridge at Barbourville, KY, 1941, 1941
Bridge construction at Barbourville, KY, 1941., [n.d.] - [n.d.]
Stone masonry bridge piers at Barbourville, KY, 1941, 1941
Bridge construction at Barbourville, KY, 1941., [n.d.] - [n.d.]
Three-span, 150 ft. bridge at Barbourville, KY, 1941, 1941
Bridge on outskirts of Barbourville, KY, 1941, 1941
Drainage structure on Manchester Road in Knox County built by WPA, [n.d.] - [n.d.]
Wilton Road constructed by WPA, [n.d.] - [n.d.]
Slope slide on Wilton Road., [n.d.] - [n.d.]
Walker Memorial Road constructed by WPA., [n.d.] - [n.d.]
Artemus Road under construction by WPA, [n.d.] - [n.d.]
Farm to market road constructed by WPA., [n.d.] - [n.d.]
Larue County
Hodgenville Sewage Disposal Plant., 1939/12/15 - 1940/10/10
Quihoff Disposal Plant at Hodgenville, KY., 1939/12/15 - 1940/10/10
Hodgenville Sewage Disposal Plant., 1939/12/15 - 1940/10/10
County Judge E.L. Cantrell, 1942, 1942
WPA Warehouse and Office, [n.d.] - [n.d.]
County quarry operated by the WPA, [n.d.] - [n.d.]
Installation of pipe culvert by the WPA, [n.d.] - [n.d.]
Hodgenville sewer construction, [n.d.] - [n.d.]
Hodgenville sewer construction, [n.d.] - [n.d.]
Drainage structure constructed by WPA, [n.d.] - [n.d.]
Road grading with mules and scrappers., [n.d.] - [n.d.]
Grading of Tanner Road., [n.d.] - [n.d.]
Surfacing of Tanner Road., [n.d.] - [n.d.]
Old rail fence along Jerrico Road. "Might have been split by Lincoln.", [n.d.] - [n.d.]
Big Springs Road constructed by the WPA, [n.d.] - [n.d.]
Upton road under construction by the WPA., [n.d.] - [n.d.]
Upton-Magnolia Road constructed by the WPA, [n.d.] - [n.d.]
Hibernia Road constructed by the WPA, [n.d.] - [n.d.]
Spratt-Magnolia Road constructed by the WPA, [n.d.] - [n.d.]
Laurel County
London City School, 1935/11/11 - 1937/2/9
London City School, 1935/11/11 - 1937/2/9
Hazel Green School and Gymnasium, 1937/6/19 - 1939/4/24
Manual Training Building at Hazel Green School, 1937/6/19 - 1939/4/24
Hazel Green School and Gymnasium, 1937/6/19 - 1939/4/24
Hazel Green School and Gymnasium (view from highway), 1937/6/19 - 1939/4/24
Hazel Green School and Gymnasium (view from highway), 1937/6/19 - 1939/4/24
New Bernstadt School. Hasn't been operated for several months., 1938/8/19 - 1940/11/20
East Bernstadt School and Gymnasium., 1938/8/19 - 1940/11/20
East Bernstadt School and Gymnasium., 1938/8/19 - 1940/11/20
East Bernstadt Gymnasium under construction., 1938/8/19 - 1940/11/20
East Bernstadt Gymnasium, 1938/8/19 - 1940/11/20
East Bernstadt Gymnasium (rear view), 1938/8/19 - 1940/11/20
Excellent stone work on East Bernstadt Gymnasium., 1938/8/19 - 1940/11/20
East Bernstadt Gymnasium (front view), 1938/8/19 - 1940/11/20
London City Hall and Fire Station, 1938/11/19 - 1941/2/28
London City Hall and Fire Station, 1938/11/19 - 1941/2/28
London City Hall and Fire Station, 1938/11/19 - 1941/2/28
London City Hall and Fire Station, 1938/11/19 - 1941/2/28
County School at Lily, KY., 1938/11/1 - 1941/2/4
WPA Warehouse in London, KY., 1939/8/4 - 1939/12/18
Lily School constructed by WPA under blanket project., [n.d.] - [n.d.]
Owsley School constructed by WPA under blanket project., [n.d.] - [n.d.]
Concrete pipes made in London, 1940., [n.d.] - [n.d.]
Driveways at Levi Jackson Park constructed by the WPA., [n.d.] - [n.d.]
Construction mill constructed by the WPA at Levi Jackson Park., [n.d.] - [n.d.]
Building dam at Levi Jackson Park., [n.d.] - [n.d.]
Mill and dam at Levi Jackson Park constructed by the WPA, [n.d.] - [n.d.]
Drainage structure constructed by WPA, [n.d.] - [n.d.]
Good stone masonry by WPA labor, 1940., [n.d.] - [n.d.]
Sandstone base being laid by WPA for county road., [n.d.] - [n.d.]
Piney Grove Road constructed by the WPA., [n.d.] - [n.d.]
Sidewalks along state highway south of London constructed by WPA., [n.d.] - [n.d.]
Laurel County stone quarry, 1941, 1941
Laurel County stone quarry, 1941, 1941
Felts School building near Corbin, KY., 1937/2/19 - 1938/6/3
London Negro school under construction., 1939/5/15 - 1940/2/21
Lawrence County
Footings for Lawrence County Jail in Louisa, KY., 1938/7/22 - 1940/9/21
Lawrence County Jail construction. Closed down., 1938/7/22 - 1940/9/21
Lawrence County jail in Louisa, KY., 1938/7/22 - 1940/9/21
Lawrence County Jail in Louisa, KY under construction., 1938/7/22 - 1940/9/21
Lawrence County Jail in Louisa, KY under construction., 1938/7/22 - 1940/9/21
Lawrence County Courthouse, 1942, 1942
County Judge, Boyd Boggs, 1942, 1942
Louisa City Hall and Fire Station, 1939/1/17 - 1939/11/10
Masonry on Martha School, [n.d.] - [n.d.]
Martha School under construction by WPA, [n.d.] - [n.d.]
Stone for Lowmansville School was cut out from one large rock., [n.d.] - [n.d.]
Lowmansville School (front view), [n.d.] - [n.d.]
Fallsburg School (front view), [n.d.] - [n.d.]
Meade Branch School (front view), [n.d.] - [n.d.]
Louisa Grade School addition., [n.d.] - [n.d.]
Clifford School constructed by WPA under blanket project., [n.d.] - [n.d.]
Blaine School constructed by KERA (front view), [n.d.] - [n.d.]
Blaine School constructed by KERA (front view), [n.d.] - [n.d.]
Dedication of Blaine School., [n.d.] - [n.d.]
County Garage and WPA Warehouse, 1938/1/7 - 1938/7/6
Making concrete pipe, [n.d.] - [n.d.]
WPA workers on lunch hour on county road project., [n.d.] - [n.d.]
Steel tied for culvert slab., [n.d.] - [n.d.]
Stone masonry culvert, [n.d.] - [n.d.]
WPA Work Shack on WPA road project., [n.d.] - [n.d.]
Grading Webbville Road, [n.d.] - [n.d.]
A Dempster Dumpster operating on road project., [n.d.] - [n.d.]
WPA road project (winter scene), [n.d.] - [n.d.]
WPA workers on grade and drain road project., [n.d.] - [n.d.]
Road grade project, [n.d.] - [n.d.]
Man with wagon and team on graded Blaine Road., [n.d.] - [n.d.]
WPA workers surfacing county road., [n.d.] - [n.d.]
Road and bridge on county road., [n.d.] - [n.d.]
WPA workers constructing county road., [n.d.] - [n.d.]
Surfaced road, [n.d.] - [n.d.]
Red, white and blue Packhorse Library sign outside Louisa, 1941, 1941
Mrs. Short, certified Packhorse Library worker, standing in doorway, 1941., [n.d.] - [n.d.]
Sign at Norris Packhorse Library project, 1941., [n.d.] - [n.d.]
Mr. Hale, Librarian at Norris Packhorse Library, 1941., [n.d.] - [n.d.]
Road and bridge constructed by WPA, 1940, 1940
Road and bridge showing good concrete work, 1940., [n.d.] - [n.d.]
Lee County
WPA Warehouse in Beattyville., 1938/8/20 - 1939/8/24
WPA Warehouse in Beattyville., 1938/8/20 - 1939/8/24
Ox team used for plowing outside of home with farmer and children., [n.d.] - [n.d.]
Andra School under construction., 1936/10/26 - 1937/11/24
Andra School under construction., 1936/10/26 - 1937/11/24
Beattyville High School addition., 1938/1/10 - 1938/5/24
Repairs to Lee County Courthouse, 1935/11/18 - 1936/1/26
Zoe School, 1936/11/10 - 1937/11/8
Zoe School, 1936/11/10 - 1937/11/8
Site selected for construction of Beattyville City Hall., 1938/6/10 - 1939/10/21
Beattyville City Hall, 1938/6/10 - 1939/10/21
Beattyville City Hall, 1938/6/10 - 1939/10/21
Beattyville City Hall, 1938/6/10 - 1939/10/21
Beattyville City Hall, 1938/6/10 - 1939/10/21
Beattyville City Hall, 1938/6/10 - 1939/10/21
WPA workers grading road by hand., [n.d.] - [n.d.]
Fixer Road surfaced by WPA, [n.d.] - [n.d.]
Drainage structure, [n.d.] - [n.d.]
Yellow Rock Road, [n.d.] - [n.d.]
Drainage construction on Quarry Road, [n.d.] - [n.d.]
WPA workers cleaning Beattyville street after flood., [n.d.] - [n.d.]
Leslie County
Hyden High School (view from highway), 1935/8/30 - 1939/8/12
Grading school grounds at Hyden High School., 1935/8/30 - 1939/8/12
Hyden High School, 1935/8/30 - 1939/8/12
Hyden High School, 1935/8/30 - 1939/8/12
Hyden High School, 1935/8/30 - 1939/8/12
Hyden High School. "Pointer bird pup caught a duck as I was taking picture and caused me to jump.", 1935/8/30 - 1939/8/12
County Judge V.A. Maggard, 1942. "Father of our Mae Cornett.", [n.d.] - [n.d.]
Bear Branch Road construction, 1940., [n.d.] - [n.d.]
Bear Branch Road Bridge constructed by WPA, 1940., [n.d.] - [n.d.]
Bear Branch Road Bridge under construction, 1940., [n.d.] - [n.d.]
Bear Branch Road Bridge, 1940., [n.d.] - [n.d.]
Bear Branch Road Bridge, 1940., [n.d.] - [n.d.]
Drainage structure built by WPA, [n.d.] - [n.d.]
WPA Warehouse in Hyden. Warehouse is in center. House and hospital for Frontier Nurses in upper left corner., [n.d.] - [n.d.]
Wedging stone by WPA workers., [n.d.] - [n.d.]
WPA Librarian visits mountain school., [n.d.] - [n.d.]
Interior of mountain cabin visited by WPA Packhorse Librarian., [n.d.] - [n.d.]
Interior of WPA Library in Hyden, KY., [n.d.] - [n.d.]
WPA workers grading county road by hand., [n.d.] - [n.d.]
Grading county road with bulldozer., [n.d.] - [n.d.]
WPA workers grading road with air compressors, drills, and dynamite., [n.d.] - [n.d.]
WPA workers grading road with horse teams., [n.d.] - [n.d.]
Grading county road with bulldozer., [n.d.] - [n.d.]
Mountain view in late afternoon., [n.d.] - [n.d.]
Mountain view in late afternoon., [n.d.] - [n.d.]
Letcher County
Bridge constructionon Main Street in Whitesburg, KY, 1941., [n.d.] - [n.d.]
Bridge constructionon Main Street in Whitesburg, KY, 1941., [n.d.] - [n.d.]
Concrete slab on bridge in Whitesburg, KY, 1941., [n.d.] - [n.d.]
Street and bridge construction in Whitesburg, KY, 1941. Adams Hotel Restaurant is on the right., [n.d.] - [n.d.]
Stockpile of crushed stone, 1941., [n.d.] - [n.d.]
Stockpile of crushed stone, 1941., [n.d.] - [n.d.]
Crushed stone stockpiled in wooded area, 1941., [n.d.] - [n.d.]
Jenkins High School under construction., 1935/10/30 - 1938/6/18
Jenkins High School (front view)., 1935/10/30 - 1938/6/18
Letcher County Courthouse in Whitesburg showing addition in background., 1935/11/29 - 1937/10/13
Addition to Letcher County Courthouse., 1935/11/29 - 1937/10/13
Middle Colby School., 1935/12/23 - 1936/5/28
Middle Colby School (front view)., 1935/12/23 - 1936/5/28
Whitco School (side view), 1935/11/25 - 1936/12/9
Two-room school at Tolliver Town., 1938/9/15 - 1939/6/27
Addition to Whitesburg School., [n.d.] - 1942/1/31
Addition to Fleming High School., 1937/7/15 - 1938/10/29
Fish Pond School, 1936/9/19 - 1937/2/27
Little Cowan School, 1936/7/29 - 1937/1/26
Pine Creek School, 1936/5/10 - 1936/12/24
Doty School, 1936/4/14 - 1936/7/20
Blair Branch School, 1936/4/14 - 1936/7/20
Mayking School, 1936/1/17 - 1937/9/15
Upper Cowan School, 1936/7/29 - 1936/12/9
Mill Creek School, 1936/5/30 - 1936/9/14
King's Creek School, 1936/5/15 - 1937/2/27
McRoberts School, [n.d.] - [n.d.]
Refrigeration plant for commodities at Whitesburg., [n.d.] - [n.d.]
Letcher County WPA Warehouse at Whitesburg., 1937/9/15 - 1938/2/28
Pouring bridge slab in Whitesburg, [n.d.] - [n.d.]
Stone bridge pier on Jeremiah Road, [n.d.] - [n.d.]
Stone bridge piers on Roxana Road, [n.d.] - [n.d.]
Stone bridge piers for Ulvah Bridge, [n.d.] - [n.d.]
Stone bridge piers in Whitesburg, [n.d.] - [n.d.]
Bridge on main business street in Whitesburg, [n.d.] - [n.d.]
Roxana Road Bridge, [n.d.] - [n.d.]
Surfacing Ulvah Road, [n.d.] - [n.d.]
Pine Mountain Road, [n.d.] - [n.d.]
Surfacing county road, [n.d.] - [n.d.]
Constructing Blacky Road, [n.d.] - [n.d.]
Surfaced county road, [n.d.] - [n.d.]
Ison Road, [n.d.] - [n.d.]
Surfacing Kona Road, [n.d.] - [n.d.]
Street work in Whitesburg, [n.d.] - [n.d.]
Concrete road in Whitesburg, [n.d.] - [n.d.]
Concrete street construction in Whitesburg. Adams Hotel Restaurant is on the right., [n.d.] - [n.d.]
Thunderstorm on Pine Mountain, 1940, 1940
Thunderstorm on Pine Mountain, 1940, 1940
Mountain view in Letcher County from highest elevation in Kentucky, July, 1942, 1942
View from top of Pine Mountain, 1940, 1940
Mountain view, [n.d.] - [n.d.]
Mountain view, [n.d.] - [n.d.]
Letcher County Quarry on Pine Mountain operated by WPA, 1940. Note two men on quarry face., [n.d.] - [n.d.]
Pine Mountain Quarry, 1940, 1940
Quarry on Pine Mountain showing WPA stone crusher and Cumberland Stone Co. crusher in distance, 1940, 1940
Letcher County Quarry, 1940, 1940
Wedging stone at Letcher County Quarry on Pine Mountain, 1940., [n.d.] - [n.d.]
Installing new crushing equipment at Letcher County Quarry at Pine Mountain, 1940, 1940
Crushed stone stockpiled in Letcher County, 1940., [n.d.] - [n.d.]
Letcher County Country Club. Now being used mostly as a nite club., 1936/6/29 - 1939/7/10
Green at Letcher County Country Club grown up in weeds, 1936/6/29 - 1939/7/10
#1 Tee at the Fleming Country Club after burning of Clubhouse, 1941, 1941
Foundation of burned Clubhouse at Fleming Country Club, 1941, 1941
Burned foundation of Clubhouse at Fleming Country Club taken from 9th Green., [n.d.] - [n.d.]
Burned Clubhouse at Fleming Country Club from #1 Tee, [n.d.] - [n.d.]
Stone masonry bridge in Whitesburg, 1939/2/26 - 1940/9/19
Beautiful stone masonry bridge at Whitesburg, 1939/2/26 - 1940/9/19
Bridge in Whitesburg, 1939/2/26 - 1940/9/19
#1 Green at Letcher County Country Club, August, 1941. Note goldenrod on back of green., [n.d.] - [n.d.]
#1 Fairway looking toward burned Clubhouse from #1 Green, August, 1941., [n.d.] - [n.d.]
Hay rick in front of #2 Tee at Letcher County Country Club, August, 1941., [n.d.] - [n.d.]
Road leading to burned Clubhouse at Letcher County Country Club, August, 1941., [n.d.] - [n.d.]
Cutting hay at Letcher County Country Club, August, 1941., [n.d.] - [n.d.]
Home wrecked by flash flood, July 9, 1942., [n.d.] - [n.d.]
Water was 4 to 8 feet deep in every store in Neon, KY during flash flood of July 9, 1942., [n.d.] - [n.d.]
Demolished house washed against railroad bridge at Whitaker, KY during flash flood of July 9, 1942., [n.d.] - [n.d.]
Lewis County
Lewis County Courthouse in Vanceburg (rear view), 1938/12/7 - 1940/9/5
Third floor slab and walls of courtroom of Lewis County Courthouse in Vanceburg., 1938/12/7 - 1940/9/5
Lewis County Courthouse in Vanceburg located in grove of pine trees, 1938/12/7 - 1940/9/5
Lewis County Courthouse in Vanceburg, 1938/12/7 - 1940/9/5
Lewis County Courthouse in Vanceburg, 1938/12/7 - 1940/9/5
Lewis County Courthouse in Vanceburg, 1938/12/7 - 1940/9/5
Lewis County Courthouse in Vanceburg, 1938/12/7 - 1940/9/5
County Judge Taft Stone, 1942, 1942
Lewis County Courthouse courtroom, 1938/12/7 - 1940/9/5
Lewis County Courthouse (rear view), 1938/12/7 - 1940/9/5
Lewis County Courthouse in Vanceburg, 1938/12/7 - 1940/9/5
Lewis County WPA Warehouse in Vanceburg, 1940/12/3 - 1941/3/10
Lewis County WPA Warehouse in Vanceburg, 1940/12/3 - 1941/3/10
Lewis County drainage structure constructed by WPA, 1940, 1940
Lewis County drainage structure constructed by WPA, 1940, 1940
Lewis County drainage structure constructed by WPA, 1940, 1940
Lewis County drainage structure constructed by WPA, 1940, 1940
Lewis County drainage structure constructed by WPA, 1940, 1940
County road under construction, [n.d.] - [n.d.]
Concord Road after resurfacing, [n.d.] - [n.d.]
New road grade constructed by WPA, [n.d.] - [n.d.]
Road resurfaced by WPA, [n.d.] - [n.d.]
Lincoln County
Hustonville School (front view), 1935/12/6 - 1936/7/3
Cross Orchard School and Gymnasium (front view), 1935/12/23 - 1936/8/2
Waynesburg Gymnasium, 1936/2/10 - 1937/2/2
Broughtown School, 1937/10/18 - 1938/3/11
Lincoln County WPA Warehouse and Garage in Stanford, KY, 1936/10/21 - 1937/8/17
Lincoln County WPA Warehouse and Garage in Stanford, KY, 1936/10/21 - 1937/8/17
Lincoln County WPA Warehouse and Garage in Stanford, KY (rear view), 1936/10/21 - 1937/8/17
Lincoln County WPA Warehouse and Garage in Stanford, KY, 1936/10/21 - 1937/8/17
View from Hall's Gap, 1940, 1940
Hustonville street and sidewalk under construction by WPA workers, [n.d.] - [n.d.]
Negro High School at Stanford, KY, 1938/1/3 - 1940/6/6
Negro High School at Stanford, KY. "One of the nicest jobs in the State.", 1938/1/3 - 1940/6/6
Stanford street construction, [n.d.] - [n.d.]
King's Mountain School and Gymnasium, 1938/12/27 - 1941/12/16
King's Mountain School and Gymnasium, 1938/12/27 - 1941/12/16
Interior of Industrial Arts Building, 1936/5/2 - 1937/2/6
Industrial Arts Building, 1936/5/2 - 1937/2/6
Lincoln County Quarry operated by WPA, [n.d.] - [n.d.]
Lincoln County Quarry stone crusher operated by WPA, [n.d.] - [n.d.]
Stanford sewers under construction by WPA, [n.d.] - [n.d.]
Goshen Road constructed by WPA, [n.d.] - [n.d.]
Goshen Road constructed by WPA, [n.d.] - [n.d.]
McKinney Road constructed by WPA, [n.d.] - [n.d.]
Hubble Road constructed by WPA, [n.d.] - [n.d.]
Waynesburg Road constructed by WPA, [n.d.] - [n.d.]
Lincoln County Jail in Stanford, 1940/8/30 - 1942/1/10
Lincoln County Jail in Stanford, 1940/8/30 - 1942/1/10
Lincoln County Jail in Stanford, 1940/8/30 - 1942/1/10
Lincoln County Courthouse Annex and Jail in Stanford, 1940/8/30 - 1942/1/10
Lincoln County Jail in Stanford, 1940/8/30 - 1942/1/10
Lincoln County Jail in Stanford, 1940/8/30 - 1942/1/10
Lincoln County Jail in Stanford, 1940/8/30 - 1942/1/10
Bridge on Lincoln County road, 1940-1941, 1941
Bridge on Lincoln County road, 1940-1941, 1941
Bridge on Lincoln County road, 1940-1941, 1941
Heavy construction Knob Lick Road, 1940-1941, 1941
Double box culvert on Goshen Road, 1940-1941, 1941
Drainage structure built by WPA, 1940-1941, 1941
Grade for Polly Ann Road constructed by WPA, 1940-1941, 1941
Bridge under construction by WPA, 1940-1941, 1941
Bridge built by WPA, 1940-1941, 1941
Lincoln County road and bridge leaving Highway #150, [n.d.] - [n.d.]
Road construction by WPA, 1940-1941, 1941
Livingston County
Hampton School, 1935/11/18 - 1936/7/19
Colored School in Smithland, KY, 1936/4/20 - 1936/10/18
Panhandle School at Ledbetter, KY, 1938/6/29 - 1940/5/21
Jay Road constructed by WPA, [n.d.] - [n.d.]
County road constructed by WPA, [n.d.] - [n.d.]
Foundation of Smithland Gymnasium, 1941/4/26 - 1942/5/29
Close up of stone work at Smithland Gymnasium, 1941/4/26 - 1942/5/29
Foundation of Smithland Gymnasium, 1941/4/26 - 1942/5/29
Laying concrete blocks for Smithland Gymnasium, 1941/4/26 - 1942/5/29
Coping on top of foundation where concrete work will begin for Smithland Gymnasium, 1941/4/26 - 1942/5/29
Sub floor on Smithland Gymnasium, 1941/4/26 - 1942/5/29
Smithland Gymnasium, 1941/4/26 - 1942/5/29
Smithland Gymnasium, 1941/4/26 - 1942/5/29
Flood at Smithland, [n.d.] - [n.d.]
Logan County
Bleachers, band shell and fence at Russellville Stadium, 1938/5/2 - 1940/4/28
Busts of Jack Dempsey, Jim Thorpe, and Ty Cobb at Russellville Stadium, 1938/5/2 - 1940/4/28
Stone fence around Russellville Stadium, 1938/5/2 - 1940/4/28
Entrance to Russellville Stadium, 1938/5/2 - 1940/4/28
Inside of Russellville Stadium, 1938/5/2 - 1940/4/28
Stone fence around Russellville Stadium, 1938/5/2 - 1940/4/28
Russellville Stadium, 1938/5/2 - 1940/4/28
Busts of Paavo Nurmi, Red Grange, and Babe Ruth on Russellville Stadium, 1938/5/2 - 1940/4/28
Stone fence around Russellville Stadium, 1938/5/2 - 1940/4/28
Scrap stockpile in Russellville, October, 1942, 1942
Lyon County
Community Sanitation Project by WPA, [n.d.] - [n.d.]
Kuttawa sewer project, [n.d.] - [n.d.]
Kuttawa sewer project, [n.d.] - [n.d.]
Drainage pipe made by WPA, [n.d.] - [n.d.]
Lamasco Road constructed by WPA, [n.d.] - [n.d.]
Retaining wall in Eddyville constructed by WPA, [n.d.] - [n.d.]
Traveling stone crusher surfacing road, [n.d.] - [n.d.]
Eddyville street construction, [n.d.] - [n.d.]
McCracken County
Paducah City Hospital, 1938/9/7 - 1940/5/11
Paducah City Hospital, 1938/9/7 - 1940/5/11
Paducah City Hospital, 1938/9/7 - 1940/5/11
Heath High School, 1935/10/8 - 1936/5/4
Heath High School, 1935/10/8 - 1936/5/4
Dunbar School, [n.d.] - 1937/11/26
Repaving Broadway in Paducah, 1940, 1940
Repaving Broadway in Paducah, 1940, 1940
Demolition of Old Courthouse in Paducah, 1941/4/1 - [n.d.]
Demolition of Old Courthouse in Paducah, 1941/4/1 - [n.d.]
Foundation being laid for new Paducah Courthouse, 1941/5/2 - [n.d.]
Foundation being laid for new Paducah Courthouse, 1941/5/2 - [n.d.]
New Paducah Courthouse under construction, 1941/5/2 - [n.d.]
New Paducah Courthouse under construction, 1941/5/2 - [n.d.]
New Paducah Courthouse under construction, 1941/5/2 - [n.d.]
New Paducah Courthouse under construction, 1941/5/2 - [n.d.]
New Paducah Courthouse after construction completion, 1941/5/2 - [n.d.]
New Paducah Courthouse after construction completion, 1941/5/2 - [n.d.]
New Paducah Courthouse after construction completion, 1941/5/2 - [n.d.]
Dedication of Noble Park Golf Course, May 16, 1940, 1940
Dedication of Noble Park Golf Course, May 16, 1940, 1940
Dedication of Noble Park Golf Course, May 16, 1940, 1940
Dedication of Noble Park Golf Course, May 16, 1940, 1940
Dedication of Noble Park Golf Course, May 16, 1940, 1940
Dedication of Noble Park Golf Course, May 16, 1940, 1940
Dedication of Noble Park Golf Course, May 16, 1940, 1940
Dedication of Noble Park Golf Course, May 16, 1940, 1940
Dedication of Noble Park Golf Course, May 16, 1940, 1940
Dedication of Noble Park Golf Course, May 16, 1940, 1940
Dedication of Noble Park Golf Course, May 16, 1940, 1940
Dedication of Noble Park Golf Course, May 16, 1940, 1940
Dedication of Noble Park Golf Course (view from #11 Green), May 16, 1940, 1940
Bob Brown driving from #3 Tee at Dedication of Noble Park Golf Course, May 16, 1940, 1940
Dedication of Noble Park Golf Course, May 16, 1940, 1940
Dedication of Noble Park Golf Course, May 16, 1940, 1940
Dedication of Noble Park Golf Course, May 16, 1940. Mily driving from #12 Tee, 3-par hole with Green in the background., [n.d.] - [n.d.]
Dedication of Noble Park Golf Course, May 16, 1940. Mily driving from #3 Tee., [n.d.] - [n.d.]
Dedication of Noble Park Golf Course, May 16, 1940. Buck Burnette, Ed Paxton, and Mayor Larkey on speakers platform., [n.d.] - [n.d.]
Dedication of Noble Park Golf Course, May 16, 1940. View across #11 Fairway showing Mr. Goodman's house., [n.d.] - [n.d.]
Dedication of Noble Park Golf Course, May 16, 1940. Putting on #10 Green. Goodman Hill in background., [n.d.] - [n.d.]
View of land prior to construction of Barkley Park in Paducah. Clay Street south toward end of 2nd Street, January 28, 1936., [n.d.] - [n.d.]
View of land prior to construction of Barkley Park in Paducah. Foot Harrison Street and railroad northwest, January 28, 1936, 1936
View of land prior to construction of Barkley Park in Paducah. Clay Street north, January 28, 1936., [n.d.] - [n.d.]
View of land prior to construction of Barkley Park in Paducah. From Clay Street north, January 28, 1936., [n.d.] - [n.d.]
View of land prior to construction of Barkley Park in Paducah. Northwest along river front., [n.d.] - [n.d.]
View of land prior to construction of Barkley Park in Paducah. Railroad near trestle-northwest, January 28, 1936, 1936
View of land prior to construction of Barkley Park in Paducah. From railroad southwest, January 28, 1936, 1936
View of land prior to construction of Barkley Park in Paducah. From railroad northwest, January 28, 1936, 1936
View of land prior to construction of Barkley Park in Paducah. Campbell Street southeast toward river, January 28, 1936, 1936
View of land prior to construction of Barkley Park in Paducah. 5th Street north, January 28, 1936., [n.d.] - [n.d.]
View of land prior to construction of Barkley Park in Paducah. Park Avenue east from 5th Street, January 28, 1936, 1936
View of land prior to construction of Barkley Park in Paducah. Park Avenue east toward river, January 28, 1936., [n.d.] - [n.d.]
Sign at Barkley Park, 1941., 1936/1/27 - 1941/7/7
Tennis courts at Barkley Park, 1941., 1936/1/27 - 1941/7/7
Oven Shelter at Barkley Park, 1941, 1936/1/27 - 1941/7/7
Riverside Drive in Barkley Park, 1941, 1936/1/27 - 1941/7/7
C.H. Harris Dredgeboat used in construction of Barkley Park, 1936/1/27 - 1941/7/7
Riprapped and graded levee along Barkley Park, 1936/1/27 - 1941/7/7
Riprapped and graded levee along Barkley Park, 1936/1/27 - 1941/7/7
Tennis courts, shelter house etc. at Barkley Park, 1936/1/27 - 1941/7/7
Foot bridge across lake in Noble Park, Paducah, constructed by WPA in 1940, 1940
New lake at Noble Park. Note riprapping on banks, 1940, 1940
Lake at Noble Park, 1942, 1942
Entrance to Noble Park, Paducah, [n.d.] - [n.d.]
Swimming pool dressing rooms at Noble Park, 1935/11/25 - 1938/10/28
Swimming pool dressing rooms at Noble Park, 1935/11/25 - 1938/10/28
Mouhry Island at Noble Park Lake, [n.d.] - [n.d.]
Noble Park Swimming and Wading Pool, 1935/8/25 - 1937/1/23
Noble Park Swimming and Wading Pool, 1935/8/25 - 1937/1/23
Noble Park Swimming Pool in use., 1935/8/25 - 1937/1/23
Noble Park Swimming Pool., 1935/8/25 - 1937/1/23
Mouhry Island at Noble Park Lake, [n.d.] - [n.d.]
Tennis courts at Noble Park., [n.d.] - [n.d.]
Clubhouse at Noble Park., [n.d.] - [n.d.]
Paxton Park Golf Course across #3 Green. Light streaks in picture are fairways. Darker streaks are roughs., 1939/8/4 - 1941/1/11
Paxton Park Golf Course over #3 Green., 1939/8/4 - 1941/1/11
Carson Park entrance and ticket booth in Paducah., [n.d.] - [n.d.]
Exhibition Building at Carson Park in Paducah., [n.d.] - [n.d.]
Making brick for wall around Keiser Field in Paducah., [n.d.] - [n.d.]
Bricks being made by WPA for wall around Keiser Field in Paducah., [n.d.] - [n.d.]
Keiler Field House in Paducah, 1936/11/12 - 1937/8/31
Storage House at 23rd and Washington Streets in Paducah., [n.d.] - [n.d.]
Addition to Lee School in Paducah., 1937/9/1 - 1938/11/9
Gravel pit operated by WPA in Paducah, [n.d.] - [n.d.]
Paducah sewer constructed by WPA, [n.d.] - [n.d.]
Paducah sewer constructed by WPA, [n.d.] - [n.d.]
23 ft. cut for a 30-inch sewer in Paducah, [n.d.] - [n.d.]
West Paducah Negro School, [n.d.] - 1937/11/26
Manual Training Building, Riedland High School, 1938/3/14 - 1938/6/27
Old Littleville School, [n.d.] - [n.d.]
Hanifan School that replaced Old Littleville School, 1935/10/28 - 1937/8/14
Adult Education class in penmanship conducted by WPA in Paducah, [n.d.] - [n.d.]
Whittier Nursery School conducted by WPA in Paducah, [n.d.] - [n.d.]
Recreation Center in Paducah, [n.d.] - [n.d.]
Recreation Center in Paducah, [n.d.] - [n.d.]
WPA worker on Sanitary Survey Project in Paducah, [n.d.] - [n.d.]
Crab Station Road constructed by WPA, [n.d.] - [n.d.]
3rd Street resurfaced in Paducah by WPA, [n.d.] - [n.d.]
Resurfacing 9th Street in Paducah, [n.d.] - [n.d.]
60 ft. wide street in Paducah, [n.d.] - [n.d.]
McCreary County
Smithtown School, [n.d.] - in 1938
Smithtown School, [n.d.] - in 1938
Smithtown School, [n.d.] - in 1938
Whitley City School (front view), 1937/9/20 - 1939/5/26
Whitley City School (rear view), 1937/9/20 - 1939/5/26
Stone work on Whitley City School, 1937/9/20 - 1939/5/26
Rivillo School, [n.d.] - 1938
McCreary County Courthouse, 1942, 1942
County Judge J.E. Perkins, 1942, 1942
Pine Knot School, 1939/5/16 - 1940/12/25
Pine Knot School, 1939/5/16 - 1940/12/25
Pine Knot School, 1939/5/16 - 1940/12/25
Pine Knot School, 1939/5/16 - 1940/12/25
Pine Knot School, 1939/5/16 - 1940/12/25
Pine Knot School, 1939/5/16 - 1940/12/25
Pleasant Run County School, 1938/10/11 - 1939/9/22
Pleasant Run County School, 1938/10/11 - 1939/9/22
Pleasant Run County School, 1938/10/11 - 1939/9/22
Natural Bridge, 1941, 1941
Rugged cliffs taken from Natural Bridge, 1941, 1941
Cliffs taken from Nevillsville Road, 1941, 1941
Natural Bridge, 1941, 1941
Natural Bridge, 1941, 1941
Bridge over abyss on Nevillsville Road. This is where Harry Campbell fell 60 feet, 1941., [n.d.] - [n.d.]
Natural Bridge, 1941, 1941
Mountain view in McCreary County, 1941, 1941
Rugged mountain scenery, 1941, 1941
Stone crusher at limestone quarry operated by WPA, 1941, 1941
Sandstone building quarry operated by WPA, 1941, 1941
Marslus siding quarry operated by WPA, 1941, 1941
Road and bridge abuttment approaching limestone quarry, 1941., [n.d.] - [n.d.]
Culvert constructed by WPA, [n.d.] - [n.d.]
Sanitation project operated by WPA, [n.d.] - [n.d.]
Pine Knot sidewalks and streets constructed by WPA, [n.d.] - [n.d.]
Pine Knot sidewalks and streets constructed by WPA, [n.d.] - [n.d.]
Retaining wall on Stearns Street constructed by WPA, [n.d.] - [n.d.]
Stearns Clubhouse and Swimming Pool, 1935/11/22 - 1937/8/19
Community House and Swimming Pool at Stearns, 1935/11/22 - 1937/8/19
Community House and Swimming Pool at Stearns, 1935/11/22 - 1937/8/19
Stearns Swimming Pool with golf course in background, 1935/11/22 - 1937/8/19
Interior of Stearns Club House, 1935/11/22 - 1937/8/19
Whitehead School, 1935/10/21 - 1936/9/18
Struck School constructed by WPA under blanket project, [n.d.] - [n.d.]
Gilbreath School constructed by WPA under blanket project, [n.d.] - [n.d.]
Parker's Lake School under construction, 1941/3/6 - 1942/3/26
Parker's Lake School under construction, 1941/3/6 - 1942/3/26
WPA Office in Whitley City, [n.d.] - [n.d.]
Bulldozer on Marshes Siding Road, [n.d.] - [n.d.]
Marshes Siding Road under construction by WPA, [n.d.] - [n.d.]
Marshes Siding Road under construction by WPA, [n.d.] - [n.d.]
Bridge over 100 ft. chasm, [n.d.] - [n.d.]
Buck Grove School, 1935/11/12 - 1936/7/18
Parker's Lake School. First of 15 stone masonry schools built in McCreary County by the WPA., [n.d.] - [n.d.]
Mount Holly Road constructed by WPA, [n.d.] - [n.d.]
Silverville Road constructed by WPA, [n.d.] - [n.d.]
Salyersville Road constructed by WPA. "One of the best road jobs in the state.", [n.d.] - [n.d.]
East Sterns Road constructed by WPA, [n.d.] - [n.d.]
Mill Creek Road constructed by WPA, [n.d.] - [n.d.]
Mount Pleasant Road constructed by WPA, [n.d.] - [n.d.]
Mount Pleasant Road constructed by WPA, [n.d.] - [n.d.]
Hays Creek Road constructed by WPA, [n.d.] - [n.d.]
Hays Creek Road constructed by WPA, [n.d.] - [n.d.]
Beulah Heights Road constructed by WPA, [n.d.] - [n.d.]
Grading road in McCreary County, [n.d.] - [n.d.]
County road construction, [n.d.] - [n.d.]
New road grade on county road, [n.d.] - [n.d.]
County road construction, [n.d.] - [n.d.]
Making road fill, [n.d.] - [n.d.]
County road construction. "One of the prettiest road projects in the state.", [n.d.] - [n.d.]
County road construction., [n.d.] - [n.d.]
Jack hammer operators on county road project., [n.d.] - [n.d.]
Unshaped stone at Pine Knot Gymnasium Project, 1941/1/2 - 1942/6/11
Shaping stone for Pine Knot Gymnasium Project, 1941/1/2 - 1942/6/11
McLean County
Sacramento School, 1936/7/27 - 1938/4/2
Sacramento School, 1936/7/27 - 1938/4/2
Fire Station and Filtration Plant in Calhoun, KY, 1940/11/25 - 1941/9/30
Fire Station and Filtration Plant in Calhoun, KY, 1940/11/25 - 1941/9/30
Fire Station and Filtration Plant in Calhoun, KY, 1940/11/25 - 1941/9/30
Concrete curb and gutter under construction, [n.d.] - [n.d.]
Concrete street, curb and gutter constructed by WPA, [n.d.] - [n.d.]
Madison County
Open Air Theatre at Eastern State Teachers College in Richmond, KY, 1935/12/14 - 1936/6/23
WPA Office at quarry site, Richmond, KY, 1941, 1941
WPA Office at quarry site, Richmond, KY, 1941, 1941
Road and location where WPA worker was injured on March 7, 1942 and died March 10, 1942., [n.d.] - [n.d.]
Road and location where WPA worker was injured on March 7, 1942 and died March 10, 1942, showing road from highway to Mr. Givedon's house built on private property., [n.d.] - [n.d.]
Road and location where WPA worker was injured on March 7, 1942 and died March 10, 1942. "X" marks spot where man fell from truck and was killed. Truck was returning to quarry from road on Givedon property in background., [n.d.] - [n.d.]
Dam construction for Richmond Water Works, 1935/12/10 - 1939/3/24
Lake for dam for Richmond Water Works, [n.d.] - [n.d.]
Health project operated by WPA, [n.d.] - [n.d.]
Piers for concrete bridge constructed by WPA, [n.d.] - [n.d.]
Concrete paving by WPA in Richmond, [n.d.] - [n.d.]
Concrete street in Richmond constructed by WPA, [n.d.] - [n.d.]
Concrete street in Richmond constructed by WPA, [n.d.] - [n.d.]
Walnut Meadow Road constructed by WPA, [n.d.] - [n.d.]
State Highway Bridge under construction across Kentucky River between Lexington and Richmond, 1942., [n.d.] - [n.d.]
Piers for the State Highway Bridge between Lexington and Richmond can be seen in background, 1942., [n.d.] - [n.d.]
State Highway Bridge under construction across Kentucky River between Lexington and Richmond, 1942., [n.d.] - [n.d.]
Piers for State Highway Bridge across the Kentucky River between Lexington and Richmond, 1942., [n.d.] - [n.d.]
Construction of Richmond Armory, 1940/10/28 - 1942/1/19
Construction of Richmond Armory, 1940/10/28 - 1942/1/19
Construction of Richmond Armory, 1940/10/28 - 1942/1/19
Construction of Richmond Armory, 1940/10/28 - 1942/1/19
Construction of Richmond Armory, 1940/10/28 - 1942/1/19
Construction of Richmond Armory, 1940/10/28 - 1942/1/19
Construction of Richmond Armory, 1940/10/28 - 1942/1/19
Construction of Richmond Armory, 1940/10/28 - 1942/1/19
Construction of Richmond Armory, 1940/10/28 - 1942/1/19
Magoffin County
Magoffin County WPA Warehouse and Office, 1937/10/26 - 1937/12/23
Swampton School, 1936/1/25 - 1938/12/1
Ivyton School, 1938/6/29 - 1939/8/8
Croft Creek School, 1936/1/13 - 1939/4/17
Croft Creek School, 1936/1/13 - 1939/4/17
Oakley Creek Bridge constructed by WPA, [n.d.] - [n.d.]
Gipsy School, 1936/1/27 - 1938/9/30
Gipsy School, 1936/1/27 - 1938/9/30
Trace Branch Bridge constructed by WPA, [n.d.] - [n.d.]
Bridge abuttment construction, [n.d.] - [n.d.]
Bridge abuttment construction, [n.d.] - [n.d.]
Retaining wall and drainage structure constructed by WPA, [n.d.] - [n.d.]
Bugar Mountain Road construction, [n.d.] - [n.d.]
Bugar Mountain Road construction, [n.d.] - [n.d.]
Grading with equipment on Mine Fork Road, [n.d.] - [n.d.]
Road grading with steam shovel, [n.d.] - [n.d.]
Grading on Magoffin County Road, [n.d.] - [n.d.]
Using horses to grade road, [n.d.] - [n.d.]
Using horses to grade road, [n.d.] - [n.d.]
Grading Trace Branch Road with horses, [n.d.] - [n.d.]
Steam shovel loading dump truck, [n.d.] - [n.d.]
Grading a county road, [n.d.] - [n.d.]
Marion County
Bradfordsville School construction, 1935/12/6 - 1937/5/21
Cistern for Bradfordsville School, 1935/12/6 - 1937/5/21
Interior of Bradfordsville Gymnasium, 1935/12/6 - 1937/5/21
Masonry on Bradfordsville School, 1935/12/6 - 1937/5/21
Bradfordsville School (side view), 1935/12/6 - 1937/5/21
Bradfordsville School, 1935/12/6 - 1937/5/21
Bradfordsville School (side view), 1935/12/6 - 1937/5/21
Bradfordsville School, 1935/12/6 - 1937/5/21
County Judge G.C. Spalding, 1942, 1942
St. Charles School (front view during wintertime), 1937/7/7 - 1938/12/21
St. Charles School (front view during summertime), 1937/7/7 - 1938/12/21
St. Charles School (side view), 1937/7/7 - 1938/12/21
St. Charles School (front view during springtime), 1937/7/7 - 1938/12/21
St. Charles School (side view), 1937/7/7 - 1938/12/21
St. Charles School (front view during summertime), 1937/7/7 - 1938/12/21
Marion County WPA Warehouse, 1938/12/5 - 1939/6/7
Marion County WPA Warehouse, 1938/12/5 - 1939/6/7
Lebanon, KY street work, 1941, 1941
Concrete paving in Lebanon, KY, [n.d.] - [n.d.]
Loretto Road constructed by WPA, 1941, 1941
Concrete paving in Lebanon, KY, 1941, 1941
Concrete paving in Lebanon, KY, 1941, 1941
Sewer and street construction in Lebanon, KY, 1941, 1941
WPA sewer construction in Lebanon, KY, 1941, 1941
Concrete street in Lebanon, KY, constructed by WPA, 1942, 1942
Road shovel in operation by WPA, [n.d.] - [n.d.]
County quarry operated by WPA, [n.d.] - [n.d.]
Storm sewer in Lebanon, KY, [n.d.] - [n.d.]
Double box culvert constructed by WPA, [n.d.] - [n.d.]
Culvert construction, [n.d.] - [n.d.]
Culvert constructed by WPA, [n.d.] - [n.d.]
Thomas Road constructed by WPA, [n.d.] - [n.d.]
Calvary Road constructed by WPA, [n.d.] - [n.d.]
Riley Road constructed by WPA, [n.d.] - [n.d.]
Marshall County
Sharpe School (front view during wintertime), 1936/4/6 - 1937/4/14
Sharpe School (front view during springtime), 1936/4/6 - 1937/4/14
Brewer's School under construction, 1940/8/21 - 1941/8/5
Brewer's School completed, 1940/8/21 - 1941/8/5
Benton, KY curb and gutter construction by WPA, [n.d.] - [n.d.]
Benton, KY sewer constructed by WPA, [n.d.] - [n.d.]
Gravel pit operated by WPA, [n.d.] - [n.d.]
Pipe culvert with concrete headwalls, [n.d.] - [n.d.]
Lyttle Cypress Road constructed by WPA, [n.d.] - [n.d.]
Birmingham Road constructed by WPA, [n.d.] - [n.d.]
Concrete culvert constructed by WPA, [n.d.] - [n.d.]
Martin County
Martin County Courthouse construction in Inez, KY, 1938/8/10 - 1941/4/23
Martin County Courthouse in Inez, KY (rear view), 1938/8/10 - 1941/4/23
View from mountainside of Inez, KY showing new courthouse under construction., 1938/8/10 - 1941/4/23
Stonework on Martin County Courthouse in Inez, KY, 1938/8/10 - 1941/4/23
Martin County Courthouse in Inez, KY, 1938/8/10 - 1941/4/23
Martin County Courthouse in Inez, KY, 1938/8/10 - 1941/4/23
Martin County Courthouse in Inez, Ky. (northeast view), 1938/8/10 - 1941/4/23
View from mountainside of Inez, KY showing new courthouse., 1938/8/10 - 1941/4/23
Moving new furniture into new Martin County Courthouse in Inez, KY., 1938/8/10 - 1941/4/23
Mountain side view of Inez, KY High School. Debris from gymnasium fire can be seen at the left of the school building., 1936/9/16 - 1939/9/27
Inez, KY High School and Gymnasium, 1936/9/16 - 1939/9/27
Shell of the Inez, KY High School Gymnasium, [n.d.] - [n.d.]
Stonework at Tomahawk School, 1938/7/13 - 1940/6/13
Tomahawk School, 1938/7/13 - 1940/6/13
Warfield School constructed by KERA, 1941, 1941
Warfield School constructed by KERA, 1941, 1941
Warfield School and Gymnasium constructed by KERA, 1941, 1941
Warfield School and Gymnasium constructed by KERA, 1941, 1941
Warfield School and Gymnasium constructed by KERA, 1941, 1941
Martin County WPA Warehouse and Garage, [n.d.] - [n.d.]
Sledge used to haul stone for WPA, [n.d.] - [n.d.]
Double box culvert constructed by WPA, [n.d.] - [n.d.]
Inez, KY High School Gymnasium construction. Initial gymnasium built by WPA and completed September 27, 1939, but burned in the spring of 1940. Second gymnasium started December 2, 1940 and completed December 17, 1941., [n.d.] - [n.d.]
Inez, KY High School construction, [n.d.] - [n.d.]
Inez, KY High School (wintertime), [n.d.] - [n.d.]
Inez, KY High School showing detail of concrete block construction on Inez Gymnasium., [n.d.] - [n.d.]
Inez, KY High School and Gymnasium (wintertime), [n.d.] - [n.d.]
Inez, KY High School and Gymnasium construction, [n.d.] - [n.d.]
Interior of second WPA-constructed gymnasium for Inez High School. Original gymnasium was completed September 27, 1939 and burned in the spring of 1940. Second gymnasium started December 2, 1940 and completed December 17, 1941., [n.d.] - [n.d.]
Landscaping around WPA Dynamite Magazine, [n.d.] - [n.d.]
WPA Dynamite Magazine, [n.d.] - [n.d.]
Road shovel operating in Martin County, [n.d.] - [n.d.]
Road construction in Martin County, [n.d.] - [n.d.]
Road construction in Martin County, [n.d.] - [n.d.]
Breaking stone on a Martin County road., [n.d.] - [n.d.]
Mason County
Bridge construction over Mason Creek, [n.d.] - [n.d.]
Completed bridge over Mason Creek, [n.d.] - [n.d.]
Maysville City Incinerator, 1939/3/25 - 1941/5/21
Maysville City Incinerator, 1939/3/25 - 1941/5/21
Street in Maysville showing where car rails were removed by WPA, 1942., [n.d.] - [n.d.]
Construction on Dance Hall by WPA in Maysville City Park., [n.d.] - [n.d.]
Sewer construction by WPA in Maysville., [n.d.] - [n.d.]
Concrete paving by WPA in Maysville, [n.d.] - [n.d.]
Mayslick Road constructed by WPA, [n.d.] - [n.d.]
Men with picks and shovels working on road bank., [n.d.] - [n.d.]
Maysville Health Project operated by WPA, [n.d.] - [n.d.]
Choctaw Road ready for portable stone crusher., [n.d.] - [n.d.]
Meade County
Woodland School Road constructed by WPA, 1940, 1940
Garrett Hill Road constructed by WPA, [n.d.] - [n.d.]
Wolf Creek Road constructed by WPA, [n.d.] - [n.d.]
Wolf Creek Road constructed by WPA, [n.d.] - [n.d.]
New grade on Andyville Road constructed by WPA, [n.d.] - [n.d.]
Access road to County Quarry operated by WPA, [n.d.] - [n.d.]
County Quarry operated by WPA, [n.d.] - [n.d.]
County Quarry operated by WPA, [n.d.] - [n.d.]
County Quarry operated by WPA, [n.d.] - [n.d.]
Stockpile of stone at County Quarry operated by WPA, [n.d.] - [n.d.]
Scraper and bulldozer pass on access road to County Quarry, [n.d.] - [n.d.]
Bulldozers grading road, [n.d.] - [n.d.]
Tractor towing portable stone crusher on road construction project, [n.d.] - [n.d.]
Stone crusher at County Quarry, [n.d.] - [n.d.]
Bulldozer grading road, [n.d.] - [n.d.]
Road constructed by WPA, [n.d.] - [n.d.]
Changing location of road in Meade County, [n.d.] - [n.d.]
New grade road construction, [n.d.] - [n.d.]
Road built by WPA, [n.d.] - [n.d.]
County road built by WPA, [n.d.] - [n.d.]
Scrap metal stockpile in Ekron, KY, October, 1942., [n.d.] - [n.d.]
Menifee County
Scranton School, 1938/5/15 - 1939/11/16
Scranton School, 1938/5/15 - 1939/11/16
County Judge Elmer McGlothen, 1942, 1942
Hawkins Branch Road constructed by WPA, 1940, 1940
Frenchburg street constructed by WPA, 1940, 1940
Bridge abuttment under construction by WPA, [n.d.] - [n.d.]
Peter Trace Creek Road constructed by WPA, [n.d.] - [n.d.]
Wellington Road construction, [n.d.] - [n.d.]
County road construction, [n.d.] - [n.d.]
Mercer County
Retaining walls along Harrods Creek, [n.d.] - [n.d.]
Retaining walls along Harrods Creek in Harrodsburg, KY., [n.d.] - [n.d.]
Retaining walls along Harrods Creek gives Harrodsburg, KY an atmosphere of Venice, Italy., [n.d.] - [n.d.]
Bridge and stone masonry walls along creek flowing through Harrodsburg, 1940., [n.d.] - [n.d.]
Bridge and storm drainage in Harrodsburg, 1940., [n.d.] - [n.d.]
Bridge and retaining wall in Harrodsburg, 1940., [n.d.] - [n.d.]
Street widening and storm drainage project in Harrodsburg, 1940., [n.d.] - [n.d.]
Greenville Street storm drainage project in Harrodsburg., [n.d.] - [n.d.]
Storm drainage that passes under a house on Greenville Street in Harrodsburg., [n.d.] - [n.d.]
Old Shaker Inn, [n.d.] - [n.d.]
Old Shaker Inn, [n.d.] - [n.d.]
Kentucky River Tunnel, 1941, 1941
Kentucky River Tunnel, 1941, 1941
Kentucky River Bridge showing tunnel in background, 1941., [n.d.] - [n.d.]
Wooden covered bridge replaced by concrete bridge built by WPA, [n.d.] - [n.d.]
Harrodsburg Armory construction, 1940/9/17 - 1942/1/28
Harrodsburg Armory construction, 1940/9/17 - 1942/1/28
Harrodsburg Armory construction, 1940/9/17 - 1942/1/28
Harrodsburg Armory construction, 1940/9/17 - 1942/1/28
Harrodsburg Armory construction, 1940/9/17 - 1942/1/28
Drill Hall of Harrodsburg Armory being decorated for President's Birthday Ball, 1942., [n.d.] - [n.d.]
Exterior view of Harrodsburg Armory, 1940/9/17 - 1942/1/28
Exterior view of completed Harrodsburg Armory, 1940/9/17 - 1942/1/28
Entrance to Harrodsburg Armory, 1940/9/17 - 1942/1/28
Shakertown School, 1939/2/14 - 1939/7/22
WPA Mercer County Warehouse, [n.d.] - [n.d.]
Concrete Pipe Plant operated by WPA, [n.d.] - [n.d.]
Concrete Piers for Forsythe Road Bridge, [n.d.] - [n.d.]
Fabricating steel for Forsythe Road Bridge being laid down, [n.d.] - [n.d.]
Forsythe Road Bridge constructed by WPA, [n.d.] - [n.d.]
Forsythe Road constructed by WPA, [n.d.] - [n.d.]
County road construction, [n.d.] - [n.d.]
Road shovel making a cut in hillside., [n.d.] - [n.d.]
Road construction, [n.d.] - [n.d.]
Drainage structure built by WPA, [n.d.] - [n.d.]
Whitenack Lane constructed by WPA, [n.d.] - [n.d.]
Retaining wall and oil storage tanks constructed by WPA, [n.d.] - [n.d.]
County Quarry operated by WPA, [n.d.] - [n.d.]
Loading stone with loader at Quarry stockpile., [n.d.] - [n.d.]
Water tower at Mercer County Quarry, [n.d.] - [n.d.]
County Quarry stone crusher, [n.d.] - [n.d.]
Portable stone crusher operated by WPA, [n.d.] - [n.d.]
Fabricating steel for laying culvert slab., [n.d.] - [n.d.]
Culvert constructed by WPA, [n.d.] - [n.d.]
Power shovel opening a creek channel, [n.d.] - [n.d.]
Van Arsdale Road and Bridge constructed by WPA, [n.d.] - [n.d.]
Bohon Bridge constructed by WPA, [n.d.] - [n.d.]
Cornishville Road Bridge constructed by WPA, [n.d.] - [n.d.]
Bonta Lane constructed by WPA, [n.d.] - [n.d.]
Kirkwood Bridge constructed by WPA, [n.d.] - [n.d.]
Manis Road constructed by WPA, [n.d.] - [n.d.]
Metcalfe County
Edmonton High School Gymnasium, 1935/10/29 - 1937/7/11
Edmonton High School Gymnasium, 1935/10/29 - 1937/7/11
Edmonton High School Gymnasium, 1935/10/29 - 1937/7/11
Concrete pipe constructed by WPA, [n.d.] - [n.d.]
Albert Van Zant, young County Judge in the state at 26 years of age, 1942., [n.d.] - [n.d.]
New road grade on Beechville Road, [n.d.] - [n.d.]
Road grading on Summer Shade Road, [n.d.] - [n.d.]
Grading a road by hand, [n.d.] - [n.d.]
Savoyard Road constructed by the WPA, [n.d.] - [n.d.]
Sulphur Wells Road constructed by the WPA, [n.d.] - [n.d.]
Cave Ridge Road constructed by the WPA, [n.d.] - [n.d.]
Echo Road constructed by the WPA, [n.d.] - [n.d.]
Cedar Flat Road constructed by the WPA, [n.d.] - [n.d.]
County Board of Education Office and Storage Building at Edmonton, 1940/5/27 - 1941/2/1
Entrance to County Board of Education Office and Storage Building at Edmonton., 1940/5/27 - 1941/2/1
County Board of Education Office and Storage Building at Edmonton, 1940/5/27 - 1941/2/1
County Board of Education Office and Storage Building at Edmonton, 1940/5/27 - 1941/2/1
County Board of Education Office and Storage Building at Edmonton, 1940/5/27 - 1941/2/1
County Board of Education Office and Storage Building at Edmonton, 1940/5/27 - 1941/2/1
Drainage structure built by WPA, [n.d.] - [n.d.]
Box culvert on Cedar Flat Road constructed by the WPA, [n.d.] - [n.d.]
Bridge on Subtle Road, [n.d.] - [n.d.]
County Quarry operated by the WPA, [n.d.] - [n.d.]
Stone crusher and bin at County Quarry operated by the WPA, [n.d.] - [n.d.]
Monroe County
Gamaliel School under construction, 1935/11/8 - 1937/3/1
Gamaliel School under construction, 1935/11/8 - 1937/3/1
Gamaliel School under construction, 1935/11/8 - 1937/3/1
Gamaliel School constructed by the WPA, 1935/11/8 - 1937/3/1
Gamaliel School (front view), 1935/11/8 - 1937/3/1
Gamaliel School (rear view), 1935/11/8 - 1937/3/1
Gamaliel School (front view), 1935/11/8 - 1937/3/1
Office os the Superintendent of Schools in Tompkinsville, 1935/12/9 - 1936/12/19
WPA Warehouse in Tompkinsville, [n.d.] - [n.d.]
WPA Warehouse in Tompkinsville, [n.d.] - [n.d.]
Merryville School constructed by the WPA, [n.d.] - [n.d.]
Big fill on Sulphur Lick Road, [n.d.] - [n.d.]
City street and sidewalk in Tompkinsville constructed by the WPA, [n.d.] - [n.d.]
Sulphur Lick Road constructed by the WPA, [n.d.] - [n.d.]
City street in Tompkinsville constructed by the WPA, [n.d.] - [n.d.]
Fountain Run Gymnasium under construction by National Youth Administration, 1941, 1941
Bandstand and benches in courtyard in Tompkinsville., 1935/11/22 - 1936/12/17
Benches and sidewalk in courthouse yard in Tompkinsville., [n.d.] - [n.d.]
Grading road by hand, [n.d.] - [n.d.]
Road scrapers being towed by tractor on road project., [n.d.] - [n.d.]
Grading road with a team of mules., [n.d.] - [n.d.]
WPA workers on road construction project, [n.d.] - [n.d.]
New road grade on Mt. Herman Road, [n.d.] - [n.d.]
Skaggs Creek Road constructed by the WPA, [n.d.] - [n.d.]
Skaggs Creek Road constructed by the WPA, [n.d.] - [n.d.]
Rowlock type brick construction on Board of Education building by WPA, [n.d.] - [n.d.]
Temporary drainage structure made of logs cut along right of way and cribbed., [n.d.] - [n.d.]
Dynamite Magazine constructed by the WPA, [n.d.] - [n.d.]
County Quarry operated by the WPA, [n.d.] - [n.d.]
Portable stone crusher in operation., [n.d.] - [n.d.]
County Quarry operated by the WPA, [n.d.] - [n.d.]
WPA workers drinking cup rack., [n.d.] - [n.d.]
Bricks pressed and burned by WPA workers for Gamaliel High School construction project. Over 360,000 bricks were pressed and burned and later used for the project., [n.d.] - [n.d.]
Emberton Road constructed by the WPA., [n.d.] - [n.d.]
Mudlick-Flippin Road constructed by the WPA, [n.d.] - [n.d.]
Crowe School House Road constructed by the WPA, [n.d.] - [n.d.]
Forming for box culvert., [n.d.] - [n.d.]
Placing concrete pipe culvert., [n.d.] - [n.d.]
Box culvert on city street in Tompkinsville., [n.d.] - [n.d.]
Triple pipe culvert with concrete headwall., [n.d.] - [n.d.]
Concrete box culvert., [n.d.] - [n.d.]
Montgomery County
Carmargo High School. Mrs. Eleanor Roosevelt laid cornerstone., 1937/2/1 - 1938/10/15
Carmargo High School. Mrs. Eleanor Roosevelt laid cornerstone., 1937/2/1 - 1938/10/15
Carmargo High School. Mrs. Eleanor Roosevelt laid cornerstone., 1937/2/1 - 1938/10/15
Mount Sterling High School Stadium under construction., 1935/12/17 - 1936/6/4
Mount Sterling High School Stadium, 1935/12/17 - 1936/6/4
Montgomery County WPA Warehouse and Office Building (rear view), 1938/10/12 - 1939/6/30
Montgomery County WPA Warehouse and Office Building (front view), 1938/10/12 - 1939/6/30
Mapleton School in Mt. Sterling, [n.d.] - 1939/5/2
Mapleton School in Mt. Sterling, [n.d.] - 1939/5/2
Blacktopping Spencer Road by the WPA, [n.d.] - [n.d.]
Camargo Road under construction by the WPA, [n.d.] - [n.d.]
Groom's Store Road constructed by the WPA, [n.d.] - [n.d.]
County road construction by the WPA, [n.d.] - [n.d.]
County road construction by the WPA, [n.d.] - [n.d.]
New grade and drain on county road construction project., [n.d.] - [n.d.]
Dynamite Magazine constructed by the WPA, [n.d.] - [n.d.]
Morgan County
Date insert in wall of Wrigley School, 1936/1/23 - 1938/6/29
Wrigley School (front view), 1936/1/23 - 1938/6/29
Foundation for Crockett School, 1936/1/23 - 1938/11/8
Morgan County Jail in West Liberty, KY, 1937/4/26 - 1939/10/2
Morgan County Jail in West Liberty, KY, 1937/4/26 - 1939/10/2
Morgan County Courthouse repaired and stuccoed by the WPA, [n.d.] - [n.d.]
County Judge Lynn B. Wells, 1942, 1942
WPA Warehouse and Office, 1937/9/24 - 1938/5/7
Cannel City School, 1936/1/23 - 1938/8/23
Cannel City School and Gymnasium, 1936/1/23 - 1938/8/23
Woodsbend School constructed by the WPA under Blanket Project, [n.d.] - [n.d.]
Redwine School constructed by the WPA under Blanket Project, [n.d.] - [n.d.]
Lenox School constructed by the WPA under Blanket Project, [n.d.] - [n.d.]
Terrace and bleachers on athletic field with West Liberty School in background., 1935/10/31 - 1937/10/8
Athletic field and bleachers at West Liberty High School, 1937/10/9 - 1938/12/23
Bleachers on new athletic field at West Liberty with high school in background., 1937/10/9 - 1938/12/23
West Liberty Waterworks pump station and filtration plant., 1939/6/26 - 1941/8/19
West Liberty Waterworks pump station and filtration plant., 1939/6/26 - 1941/8/19
County road construction by the WPA, [n.d.] - [n.d.]
County road construction by the WPA, [n.d.] - [n.d.]
New grade on county road., [n.d.] - [n.d.]
County road construction by the WPA, [n.d.] - [n.d.]
County road construction by the WPA, [n.d.] - [n.d.]
County road construction by the WPA, [n.d.] - [n.d.]
Box culvert constructed by the WPA, [n.d.] - [n.d.]
Box culvert constructed by the WPA, [n.d.] - [n.d.]
County Quarry operated by the WPA, [n.d.] - [n.d.]
West Liberty in background, June, 1940, 1940
West Liberty in background, June, 1940, 1940
Scrap pile in West Liberty collected by the WPA, 1942, 1942
Muhlenberg County
Greenville High School Gymnasium, 1935/11/25 - 1937/3/18
Greenville High School Gymnasium, 1935/11/25 - 1937/3/18
Greenville High School Gymnasium (rear view), 1935/11/25 - 1937/3/18
Greenville High School Gymnasium, 1935/11/25 - 1937/3/18
Old Courthouse in Greenville, 1942., [n.d.] - [n.d.]
Central City Swimming Pool, 1936/2/4 - 1937/9/3
Greenville Hospital (front view), 1936/1/15 - 1938/4/2
Greenville Hospital (front view), 1936/1/15 - 1938/4/2
Greenville Hospital (front view), 1936/1/15 - 1938/4/2
Bremen Gymnasium, 1937/11/5 - 1938/7/8
Hughes-Kirk School, 1937/3/19 - 1938/10/3
Hughes-Kirk School, 1937/3/19 - 1938/10/3
Central City Negro School, 1936/10/19 - 1938/1/5
Drakesboro Gymnasium, 1937/6/1 - 1938/6/3
Drakesboro Gymnasium (side view), 1937/6/1 - 1938/6/3
Drakesboro Gymnasium, 1937/6/1 - 1938/6/3
Greenville City Hall and Fire Station, 1938/8/22 - 1940/6/18
Greenville City Hall and Fire Station, a monolithic concrete building., 1938/8/22 - 1940/6/18
Greenville City Hall and Fire Station, a monolithic concrete building., 1938/8/22 - 1940/6/18
Greenville City Hall and Fire Station, a monolithic concrete building., 1938/8/22 - 1940/6/18
Greenville City Hall and Fire Station, a monolithic concrete building., 1938/8/22 - 1940/6/18
Greenville City Hall and Fire Station, a monolithic concrete building., 1938/8/22 - 1940/6/18
Greenville-Madisonville Road constructed by the WPA, [n.d.] - [n.d.]
Harpers Hill Road constructed by the WPA, [n.d.] - [n.d.]
Graham Road constructed by the WPA, [n.d.] - [n.d.]
Penrod Road constructed by the WPA, [n.d.] - [n.d.]
Oates Store Road constructed by the WPA, [n.d.] - [n.d.]
Muhlenberg County WPA sign, [n.d.] - [n.d.]
County Quarry operated by the WPA, [n.d.] - [n.d.]
Young Road constructed by the WPA, [n.d.] - [n.d.]
WPA road sign, [n.d.] - [n.d.]
Box and double pipe culvert constructed by the WPA, [n.d.] - [n.d.]
Baseball grandstand and diamond in Central City constructed by the WPA, [n.d.] - [n.d.]
Steel and masonry arch bridge constructed by the WPA, [n.d.] - [n.d.]
Road shovel operating on county road., [n.d.] - [n.d.]
Road construction by WPA, [n.d.] - [n.d.]
Landscaping at Cleaton School, [n.d.] - [n.d.]
Nelson County
Bardstown Reservoir, 1937/3/27 - 1937/12/31
Earth-filled dam at Bardstown Lake, 1937/3/27 - 1937/12/31
Bardstown Lake with dam in the background., 1937/3/27 - 1937/12/31
Bardstown Reservoir, 1937/3/27 - 1937/12/31
Water eroding retaining wall of spillway at Bardstown Lake, [n.d.] - [n.d.]
WPA Warehouse and Office, 1938/12/15 - 1939/9/10
Road shovel working on a Bardstown street., [n.d.] - [n.d.]
Bardstown street construction, 1940-1942, 1942
Bardstown street construction, 1940-1942, 1942
Bardstown street construction, 1940-1942, 1942
Bardstown street construction, 1940-1942, 1942
Bardstown street construction, 1940-1942, 1942
New Hope-Raywick Road constructed by the WPA, [n.d.] - [n.d.]
Bellwood Road constructed by the WPA, [n.d.] - [n.d.]
New Hope Road constructed by the WPA, [n.d.] - [n.d.]
Bloomfield Gymnasium (side view), 1938/1/26 - 1939/6/26
Bloomfield Gymnasium (rear view), 1938/1/26 - 1939/6/26
Fairfield Road constructed by the WPA, [n.d.] - [n.d.]
Fairfield Road constructed by the WPA, [n.d.] - [n.d.]
Shepherdsville Road constructed by the WPA, [n.d.] - [n.d.]
Laying pipe culvert, [n.d.] - [n.d.]
Double box culvert constructed by the WPA, [n.d.] - [n.d.]
Open sewer through New Haven, KY, [n.d.] - [n.d.]
County Quarry operated by the WPA, [n.d.] - [n.d.]
County Quarry operated by the WPA, [n.d.] - [n.d.]
Water main installation in Bardstown, [n.d.] - [n.d.]
Bardstown School under construction, 1941/9/25 - [n.d.]
Bardstown School under construction, 1941/9/25 - [n.d.]
Bardstown School under construction, 1941/9/25 - [n.d.]
Bardstown School under construction, 1941/9/25 - [n.d.]
Bardstown School under construction, 1941/9/25 - [n.d.]
Bardstown School under construction, 1941/9/25 - [n.d.]
Bardstown School under construction, 1941/9/25 - [n.d.]
Bardstown Bath House and Swimming Pool, 1941/1/9 - 1942/12/31
Bardstown Bath House and Swimming Pool, 1941/1/9 - 1942/12/31
Bardstown Bath House and Swimming Pool, 1941/1/9 - 1942/12/31
Bardstown Bath House and Swimming Pool, 1941/1/9 - 1942/12/31
Bardstown Bath House and Swimming Pool, 1941/1/9 - 1942/12/31
Bardstown Bath House and Swimming Pool, 1941/1/9 - 1942/12/31
Bardstown Bath House and Swimming Pool, 1941/1/9 - 1942/12/31
Church and trees damaged by tornado, March 16, 1942, 1942
Damage caused by tornado, March 16, 1942, 1942
Brick church extensively damaged by tornado, March 16, 1942, 1942
Damage caused by tornado, March 16, 1942, 1942
Nicholas County
Bartonville Road drained and graveled, winter of 1940., [n.d.] - [n.d.]
Entrance to Carlisle athletic field, 1936/2/24 - 1936/10/27
Grandstand at Carlisle athletic field, 1936/2/24 - 1936/10/27
East Union Road under construction by the WPA, [n.d.] - [n.d.]
East Union Road resurfaced by the WPA, [n.d.] - [n.d.]
Carlisle Armory construction site, 1940/11/8 - 1941/12/18
Carlisle Armory construction site with courthouse in the background., 1940/11/8 - 1941/12/18
Carlisle Armory construction site, 1940/11/8 - 1941/12/18
Ted Johnson and Hugh Crozier inspecting Carlisle Armory construction site., 1940/11/8 - 1941/12/18
Interior of Carlisle Armory, 1940/11/8 - 1941/12/18
Interior of Carlisle Armory, 1940/11/8 - 1941/12/18
Carlisle Armory (front view), 1940/11/8 - 1941/12/18
Entrance to Carlisle Armory, 1940/11/8 - 1941/12/18
Ohio County
County Jail and Jailer's Residence under construction in Hartford, KY, 1940/4/8 - 1941/12/9
County Jail and Jailer's Residence under construction in Hartford, KY, 1940/4/8 - 1941/12/9
County Jail and Jailer's Residence under construction in Hartford, KY, 1940/4/8 - 1941/12/9
County Jail and Jailer's Residence under construction in Hartford, KY, 1940/4/8 - 1941/12/9
County Jail and Jailer's Residence, 1940/4/8 - 1941/12/9
County Jail and Jailer's Residence, 1940/4/8 - 1941/12/9
County Jail and Jailer's Residence, 1940/4/8 - 1941/12/9
County Jail and Jailer's Residence, 1940/4/8 - 1941/12/9
County Jail and Jailer's Residence, 1940/4/8 - 1941/12/9
Demolition of Old Courthouse, [n.d.] - [n.d.]
Demolition of Old Courthouse, [n.d.] - [n.d.]
Heating tunnel between new Courthouse and County Jail under construction by the WPA, 1941, 1941
New Courthouse under construction by the WPA, 1940/11/12 - [n.d.]
New Courthouse foundation, 1940/11/12 - [n.d.]
New Courthouse under construction by the WPA, 1940/11/12 - [n.d.]
New Courthouse under construction by the WPA, 1940/11/12 - [n.d.]
New Courthouse under construction by the WPA, 1940/11/12 - [n.d.]
New Courthouse under construction by the WPA, 1940/11/12 - [n.d.]
Office and Warehouse being used as a temporary courthouse, 1941, 1938/6/21 - 1939/8/31
Cromwell Reservoir, 1940, 1940
Concrete retaining wall constructed by the WPA, [n.d.] - [n.d.]
Hartford Municipal Waterworks constructed by the WPA. Photo taken in 1941., [n.d.] - [n.d.]
Hartford Municipal Waterworks constructed by the WPA. Photo taken in 1941., [n.d.] - [n.d.]
Beaver Dam sewer under construction by the WPA, [n.d.] - [n.d.]
County Grade and High Schools in Hartford, KY, 1936/12/7 - 1938/2/5
County Grade and High Schools in Hartford, KY, 1936/12/7 - 1938/2/5
Re-paved street in Hartford, KY, [n.d.] - [n.d.]
City Hall and Fire Station in Hartford, KY, 1935/11/21 - 1936/12/16
Rockport Gymnasium, 1937/6/15 - 1938/5/20
Centertown School, 1937/9/8 - 1939/1/26
Beaver Dam Imhoff Tank constructed by the WPA, [n.d.] - [n.d.]
Sunnydale Road constructed by the WPA, [n.d.] - [n.d.]
Pilings being driven in for a bridge., [n.d.] - [n.d.]
Stone masonry piers and abutments for bridge on Livermore Road., [n.d.] - [n.d.]
Livermore Bridge and Road constructed by the WPA, [n.d.] - [n.d.]
Drainage structure built by the WPA, [n.d.] - [n.d.]
County Quarry operated by the WPA, [n.d.] - [n.d.]
Stone crusher operated by WPA at County Quarry, [n.d.] - [n.d.]
Dynamite magazine constructed by the WPA, [n.d.] - [n.d.]
Harford cistern constructed by the WPA, [n.d.] - [n.d.]
Demolition of Old Courthouse, [n.d.] - [n.d.]
Foundation of New Courthouse, [n.d.] - [n.d.]
New Courthouse under construction by the WPA (rear view), [n.d.] - [n.d.]
New County Courthouse in Hartford, KY, [n.d.] - [n.d.]
New County Courthouse in Hartford, KY (rear view), [n.d.] - [n.d.]
Back entrance to the New County Courthouse in Hartford, KY., [n.d.] - [n.d.]
Front entrance to the New County Courthouse in Hartford, KY., [n.d.] - [n.d.]
Looking out of New Courthouse window in Hartford, KY. Note glass brick., [n.d.] - [n.d.]
New County Courthouse after construction completion., [n.d.] - [n.d.]
Oldham County
Pewee Valley street constructed by the WPA, 1940, 1940
Gong for calling court into session at LaGrange, KY, 1941., [n.d.] - [n.d.]
County Courthouse in LaGrange, KY, 1942, 1942
County Judge James A. Hall, 1942, 1942
Sligo Road under construction by the WPA, [n.d.] - [n.d.]
Covington Road constructed by the WPA, [n.d.] - [n.d.]
County road constructed by the WPA, [n.d.] - [n.d.]
Jericho Road constructed by the WPA, [n.d.] - [n.d.]
Owen County
Crushing stone at County Quarry, [n.d.] - [n.d.]
Poplar Grove-Glencoe Road drained and graded by the WPA, 1940, 1940
New Columbus School under construction by the WPA, 1936/3/30 - 1937/9/14
County Courthouse repaired by the WPA, 1942, 1942
County Judge Howard Ellis, 1942, 1942
New grade on Point of Rock Road, [n.d.] - [n.d.]
Stone bridge piers, [n.d.] - [n.d.]
Booneville Auditorium, 1937/2/23 - 1938/10/7
Booneville Gymnasium, 1937/2/23 - 1938/10/7
Box culvert on Cow Creek Road, [n.d.] - [n.d.]
WPA Office and Warehouse built by the National Youth Administration, 1941, 1941
WPA Office and Warehouse built by the National Youth Administration, 1941, 1941
Heavy rock cut on Cow Creek Road, 1940., [n.d.] - [n.d.]
Booneville Jail (rear view), 1939/1/23 - 1940/3/6
Booneville Jail (front view), 1939/1/23 - 1940/3/6
County Judge C.A. Bowman, 1942, 1942
Packhorse Library carrier, [n.d.] - [n.d.]
Cow Creek Road Bridge, [n.d.] - [n.d.]
Traveler's Rest Road constructed by the WPA, [n.d.] - [n.d.]
Heavy cut on Bear Run Road, [n.d.] - [n.d.]
Pendelton County
Mt. Auburn School (side view), 1936/10/25 - 1938/3/8
Mt. Auburn School (front view), 1936/10/25 - 1938/3/8
Butler School Addition, 1939/4/6 - 1941/1/2
Goforth School (front view), 1937/4/17 - 1938/9/29
Goforth School (side view), 1937/4/17 - 1938/9/29
Goforth School (view from road), 1937/4/17 - 1938/9/29
County Courthouse in Falmouth, winter of 1942., [n.d.] - [n.d.]
County Judge William J. Newkirk, 1942, 1942
Morgan School under construction, 1938/6/30 - 1939/10/28
Morgan School, 1938/6/30 - 1939/10/28
Bishop Ridge Road constructed by the WPA, [n.d.] - [n.d.]
Street under construction in Falmouth, KY., [n.d.] - [n.d.]
Falmouth Street constructed by the WPA, [n.d.] - [n.d.]
County road constructed by the WPA, [n.d.] - [n.d.]
County road constructed by the WPA, [n.d.] - [n.d.]
County road constructed by the WPA, [n.d.] - [n.d.]
Flood bridge on Mt. Zion Road constructed by the WPA, [n.d.] - [n.d.]
Bethel Road Bridge constructed by the WPA, [n.d.] - [n.d.]
Bridge constructed by the WPA, [n.d.] - [n.d.]
Butler sewer under construction by the WPA, [n.d.] - [n.d.]
Stone crusher in operation by the WPA, [n.d.] - [n.d.]
Drainage structure constructed by the WPA, [n.d.] - [n.d.]
Perry County
Interior construction of Vicco Gymnasium, 1938/5/27 - [n.d.]
"X" marks the spot from which boy fell to his death at the Vicco Gymnasium construction site., [n.d.] - [n.d.]
Platform from which boy fell to his death at Vicco Gymnasium construction site., [n.d.] - [n.d.]
"X" marks the spot from which boy fell to his death at the Vicco Gymnasium construction site., [n.d.] - [n.d.]
Vicco Gymnasium under roof., [n.d.] - [n.d.]
Vicco Gymnasium under roof., [n.d.] - [n.d.]
Full side view of Vicco Gymnasium showing opening for flume under center of the building., [n.d.] - [n.d.]
Creek flowing under Vicco Gymnasium., [n.d.] - [n.d.]
Flume under center of Vicco Gymnasium., [n.d.] - [n.d.]
Bridge piers., [n.d.] - [n.d.]
Bridge piers., [n.d.] - [n.d.]
Hazard Swinging Bridge, 1935/11/21 - 1937/6/5
WPA Office and Warehouse in Hazard., 1937/9/20 - 1938/1/11
WPA Office and Warehouse in Hazard., 1937/9/20 - 1938/1/11
Scrap rubber pile on Main Street in Hazard, July, 1942., [n.d.] - [n.d.]
Bridge constructed by the WPA, 1940., [n.d.] - [n.d.]
Bridge constructed by the WPA, 1940., [n.d.] - [n.d.]
Negro School in Hazard., 1935/12/18 - 1937/9/18
Ary School., 12/23/1935 - June 31, 1939
WPA workers painting Hardberry School., [n.d.] - [n.d.]
Concrete street under construction in Hazard., [n.d.] - [n.d.]
Concrete paving on Broadway in Hazard., [n.d.] - [n.d.]
Installation of 6-inch water main along Broadway in Hazard., [n.d.] - [n.d.]
Excavating for retaining wall on High Street in Hazard., [n.d.] - [n.d.]
Chavis Road constructed by WPA, [n.d.] - [n.d.]
Leatherwood Road under construction by WPA, [n.d.] - [n.d.]
Dice-Rowdy Road under construction by WPA, [n.d.] - [n.d.]
Bowlingtown Road constructed by WPA, [n.d.] - [n.d.]
Making a side fill on county road project., [n.d.] - [n.d.]
Showing grade around a mountain., [n.d.] - [n.d.]
Paving slab on box culvert., [n.d.] - [n.d.]
New heavy grade on country road., [n.d.] - [n.d.]
WPA workers grading road by hand., [n.d.] - [n.d.]
Stone masonry bridge piers and abuttments., [n.d.] - [n.d.]
Wooden bridge on stone masonry piers., [n.d.] - [n.d.]
Bridge constructed by the WPA, [n.d.] - [n.d.]
Stone masonry dam across Little Leatherwood Creek constructed by the WPA, [n.d.] - [n.d.]
Stone masonry dam across Little Leatherwood Creek constructed by the WPA, [n.d.] - [n.d.]
Drainage structure constructed by the WPA, [n.d.] - [n.d.]
WPA workers shaping reinforcement for concrete pipe., [n.d.] - [n.d.]
Q.C. Couch delivering scrap by mule-driven sledge near Combs, KY, October, 1942., [n.d.] - [n.d.]
Q.C. Couch delivering scrap by mule-driven sledge near Combs, KY, October, 1942., [n.d.] - [n.d.]
School children delivering scrap at Combs School, October, 1942., [n.d.] - [n.d.]
School girls rolling metal drum to scrap stockpile in Combs, KY, October, 1942., [n.d.] - [n.d.]
Highway in Perry County after flash flood on July 9, 1942. "After rounding bend, ran into deep water.", [n.d.] - [n.d.]
Ruined cornfield after flash flood on July 9, 1942., [n.d.] - [n.d.]
Railroad bridge and approach washed out by flash flood on July 9, 1942., [n.d.] - [n.d.]
Scene in Vicco, KY, after flash flood on July 9, 1942., [n.d.] - [n.d.]
Norma Jean Asher had hard luck delivering her scrap near Combs, KY., [n.d.] - [n.d.]
Norma Jean Asher with friend after scrap is reloaded on way to scrap stockpile., [n.d.] - [n.d.]
Pike County
Negro School in Pikeville., 1935/12/9 - 1938/4/21
Pike County Jail in Pikeville., 1938/7/23 - 1940/7/29
Phelps Gymnasium., 1936/9/8 - 1939/5/3
Phelps Gymnasium., 1936/9/8 - 1939/5/3
WPA Warehouse showing flower garden., 1938/3/14 - 1938/7/22
Making concrete pipe, 1940., [n.d.] - [n.d.]
Concrete pipe stored along highway, 1940., [n.d.] - [n.d.]
Dorton Gymnasium construction. Note abundance of cut stone., 1938/7/23 - 1940/11/9
Dorton Gymnasium under construction., 1938/7/23 - 1940/11/9
Dorton Gymnasium under construction., 1938/7/23 - 1940/11/9
Dorton Gymnasium under construction., 1938/7/23 - 1940/11/9
Dorton Gymnasium under construction., 1938/7/23 - 1940/11/9
Dorton Gymnasium under construction., 1938/7/23 - 1940/11/9
Dorton Gymnasium after completion (wintertime)., 1938/7/23 - 1940/11/9
Dorton Gymnasium after completion (wintertime)., 1938/7/23 - 1940/11/9
Dorton Gymnasium after completion (wintertime)., 1938/7/23 - 1940/11/9
Shelbania School., 1935/11/11 - 1937/12/22
Shelbania School (rear view)., 1935/11/11 - 1937/12/22
Shelbania School (front view)., 1935/11/11 - 1937/12/22
Loading surfacing gravel from the Big Sandy River., [n.d.] - [n.d.]
Loading surfacing gravel from the Big Sandy River., [n.d.] - [n.d.]
Drainage structure built by the WPA, 1941., [n.d.] - [n.d.]
Foundation for Belfry School., [n.d.] - 1937/11/18
Pikeville Incinerator., 1938/1/23 - 1938/7/22
Pikeville Incinerator., 1938/1/23 - 1938/7/22
Breeding pool at State Fish Hatchery., 1936/3/23 - 1939/5/30
Breeding pool at State Fish Hatchery., 1936/3/23 - 1939/5/30
Breeding pool at State Fish Hatchery., 1936/3/23 - 1939/5/30
Caretakers house at State Fish Hatchery built with water-rounded pebbles., 1936/3/23 - 1939/5/30
Caretakers house at State Fish Hatchery built with water-rounded pebbles., 1936/3/23 - 1939/5/30
Dorton School where WPA constructed the Dorton Gymnasium., [n.d.] - [n.d.]
Athletic field constructed by the WPA., 1938/7/23 - 1939/7/22
Varney Road under construction by the WPA., [n.d.] - [n.d.]
Dorton Road under construction by the WPA., [n.d.] - [n.d.]
Pike County Suspension Bridge across the Big Sandy River in Pikeville, 1940., [n.d.] - [n.d.]
Pike County Suspension Bridge across the Big Sandy River in Pikeville, 1940., [n.d.] - [n.d.]
Pike County Suspension Bridge across the Big Sandy River in Pikeville, 1940., [n.d.] - [n.d.]
Beaver Creek Road constructed by the WPA., [n.d.] - [n.d.]
Beaver Creek Road constructed by the WPA., [n.d.] - [n.d.]
Retaining wall under construction by the WPA to stop slide onto road., [n.d.] - [n.d.]
Road shovel operated by the WPA., [n.d.] - [n.d.]
Bulldozer operating on Grapevine Road., [n.d.] - [n.d.]
Heavy construction for road paralleling Big Sandy River., [n.d.] - [n.d.]
WPA workers making bridge fill., [n.d.] - [n.d.]
Concrete street paving in Pikeville., [n.d.] - [n.d.]
Concrete street paving in Pikeville., [n.d.] - [n.d.]
Robinson Creek Bridge under construction by the WPA, [n.d.] - [n.d.]
Stone masonry box culvert., [n.d.] - [n.d.]
Double box culvert constructed by the WPA., [n.d.] - [n.d.]
Dynamite magazine constructed by the WPA, [n.d.] - [n.d.]
WPA starting reconstruction of Sukey Creek Bridge on February 20, 1939 after flood washout., [n.d.] - [n.d.]
WPA starting reconstruction of Sukey Creek Bridge on February 20, 1939 after flood washout., [n.d.] - [n.d.]
WPA starting reconstruction of Sukey Creek Bridge on February 20, 1939 after flood washout., [n.d.] - [n.d.]
WPA starting reconstruction of Sukey Creek Bridge on February 20, 1939 after flood washout., [n.d.] - [n.d.]
WPA starting reconstruction of Sukey Creek Bridge on February 20, 1939 after flood washout., [n.d.] - [n.d.]
Powell County
Clay City School under construction., 1938/11/28 - 1941/12/30
Clay City School under construction., 1938/11/28 - 1941/12/30
Clay City School., 1938/11/28 - 1941/12/30
Clay City School., 1938/11/28 - 1941/12/30
Clay City School., 1938/11/28 - 1941/12/30
Concrete sidewalk in Clay City constructed by the WPA., [n.d.] - [n.d.]
Road work with wheelbarrows and shovels., [n.d.] - [n.d.]
South Fork Road under construction by WPA workers with wheelbarrows and shovels., [n.d.] - [n.d.]
WPA Library at Stanton, KY, 1941., [n.d.] - [n.d.]
WPA Office and Warehouse in Stanton, KY, 1941., [n.d.] - [n.d.]
North Bend Road before WPA improvements, 1941., [n.d.] - [n.d.]
North Bend Road after WPA improvements, 1941., [n.d.] - [n.d.]
Good train of mules working on Spoutspring Road., [n.d.] - [n.d.]
Portable stone crusher in operation on Spoutspring Road., [n.d.] - [n.d.]
Rosslyn Road being reinforced by the WPA., [n.d.] - [n.d.]
Rosslyn Road after resurfacing by the WPA., [n.d.] - [n.d.]
Hardwick Creek Road constructed by the WPA., [n.d.] - [n.d.]
Pulaski County
Concrete street paving in residential district of Somerset., [n.d.] - [n.d.]
Concrete street paving in Somerset., [n.d.] - [n.d.]
Somerset area WPA Office, 1940., [n.d.] - [n.d.]
Somerset Jail and Courthouse Annex, 1938/6/7 - 1940/10/12
Somerset Jail and Courthouse Annex, 1938/6/7 - 1940/10/12
Somerset Jail and Courthouse Annex., 1938/6/7 - 1940/10/12
Road south of river constructed by the WPA, 1940., [n.d.] - [n.d.]
Box culvert constructed by the WPA, 1940., [n.d.] - [n.d.]
Collier Dam construction., 1938/6/3 - 1938/10/12
Collier Dam construction site., 1938/6/3 - 1938/10/12
Collier Lake showing all the water it holds., 1938/6/3 - 1938/10/12
County Quarry south of the river, 1940., [n.d.] - [n.d.]
County Quarry, 1940, 1940
Stone crusher at County Quarry, 1940., [n.d.] - [n.d.]
Bridge under construction by the WPA, 1940., [n.d.] - [n.d.]
Concrete bridge abuttment., [n.d.] - [n.d.]
Start of Somerset Hospital construction., 1941/6/2 - [n.d.]
Somerset Hospital construction., 1941/6/2 - [n.d.]
Somerset Hospital construction., 1941/6/2 - [n.d.]
Somerset Hospital construction., 1941/6/2 - [n.d.]
Somerset Hospital under construction., 1941/6/2 - [n.d.]
Somerset Hospital under construction., 1941/6/2 - [n.d.]
Somerset Hospital nearing construction completion., 1941/6/2 - [n.d.]
Somerset Hospital shown in background., [n.d.] - [n.d.]
Somerset Disposal Plant., [n.d.] - [n.d.]
Somerset Disposal Plant., [n.d.] - [n.d.]
Somerset Disposal Plant., [n.d.] - [n.d.]
Somerset Disposal Plant., [n.d.] - [n.d.]
Somerset Disposal Plant., [n.d.] - [n.d.]
Somerset Disposal Plant., [n.d.] - [n.d.]
Sewer construction in Somerset., [n.d.] - [n.d.]
Cut on sewer project in Somerset., [n.d.] - [n.d.]
Sewer construction in Somerset., [n.d.] - [n.d.]
Excavation for Negro School in Somerset., 1941/3/7 - 1942/2/14
Negro High School under construction in Somerset., 1941/3/7 - 1942/2/14
Negro High School under construction in Somerset., 1941/3/7 - 1942/2/14
Negro High School nearing construction completion., 1941/3/7 - 1942/2/14
Negro High School after construction completion., 1941/3/7 - 1942/2/14
Bridge across Cumberland River and tunnel at Burnside, KY, 1941., [n.d.] - [n.d.]
Bridge on Highway #27 across Cumberland River at Burnside, KY, 1941, 1941
Sewer installation project in Somerset, 1941., [n.d.] - [n.d.]
Somerset Sewer Project, 1942., [n.d.] - [n.d.]
WPA workers installing sewer line in Somerset, 1941., [n.d.] - [n.d.]
Griffin Avenue in Somerset constructed by the WPA., [n.d.] - [n.d.]
Concrete paving and sidewalks on Oak Street in Somerset., [n.d.] - [n.d.]
Base for blacktop on a Somerset street., [n.d.] - [n.d.]
Street construction in Somerset., [n.d.] - [n.d.]
Reconstruction of Jackboro Street., [n.d.] - [n.d.]
Concrete walkway to Eubank High School constructed by the WPA., 1936/3/16 - 1936/7/1
WPA Warehouse and Office constructed by the WPA in Somerset., [n.d.] - [n.d.]
WPA work shack on Tick Ridge Road., [n.d.] - [n.d.]
Science Hill School., 1937/8/2 - 1938/12/29
Road shovel operated by the WPA on road construction project., [n.d.] - [n.d.]
Grading Bethel Ridge Road., [n.d.] - [n.d.]
Sloping banks by hand on county road project., [n.d.] - [n.d.]
Road shoulder on Parker's Mill Road., [n.d.] - [n.d.]
Road shovel operating on Keno Road., [n.d.] - [n.d.]
WPA workers on Keno Road., [n.d.] - [n.d.]
Ocala Road constructed by WPA., [n.d.] - [n.d.]
Strawberry Road constructed by WPA., [n.d.] - [n.d.]
Grading Tick Ridge Road., [n.d.] - [n.d.]
Tick Ridge Road constructed by the WPA., [n.d.] - [n.d.]
Bull Run Road constructed by the WPA., [n.d.] - [n.d.]
Buck Creek Road constructed by the WPA., [n.d.] - [n.d.]
Pisgah Road constructed by the WPA., [n.d.] - [n.d.]
Pouring slab on drainage structure., [n.d.] - [n.d.]
Box culvert constructed by the WPA., [n.d.] - [n.d.]
Oil Center Bridge piers., [n.d.] - [n.d.]
Bridge on Oil Center Road constructed by the WPA using old steel., [n.d.] - [n.d.]
Culvert constructed by the WPA., [n.d.] - [n.d.]
Somerset Quarry operated by the WPA., [n.d.] - [n.d.]
Estesburg Quarry operated by the WPA., [n.d.] - [n.d.]
Sloan's Valley Quarry operated by the WPA., [n.d.] - [n.d.]
Hogue Road Bridge constructed by the WPA using old steel., [n.d.] - [n.d.]
Ruth Road constructed by the WPA. "Danger, Blasting Ahead" sign in center., [n.d.] - [n.d.]
Science Hill Road constructed by the WPA., [n.d.] - [n.d.]
Robertson County
Bridge on Kentontown-Pickway Road near Mount Olivet constructed by the WPA, 1940, 1940
Repairing and painting Robertson County Courthouse, 1942., [n.d.] - [n.d.]
County Judge C.C. Mullikin, 1942, 1942
County office near courthouse constructed by the WPA., [n.d.] - [n.d.]
Cedar Creek Road constructed by the WPA., [n.d.] - [n.d.]
Pickway Road constructed by the WPA., [n.d.] - [n.d.]
Rockcastle County
Mt. Vernon School Addition., 1936/10/20 - 1939/9/19
Livingston Gymnasium., 1936/10/25 - 1938/10/26
Mt. Vernon sidewalks under construction by the WPA., [n.d.] - [n.d.]
Brodhead School (rear view)., 1939/1/12 - 1941/3/15
Brodhead School (side view), 1939/1/12 - 1941/3/15
Brodhead School (side view), 1939/1/12 - 1941/3/15
Brodhead School (side view), 1939/1/12 - 1941/3/15
Brodhead School (front view), 1939/1/12 - 1941/3/15
County Judge J.H. Lambert, 1942., [n.d.] - [n.d.]
Renfro Valley cabins and barn where radio program originates, July, 1942., [n.d.] - [n.d.]
Renfro Valley cabins and barn where radio program originates, July, 1942., [n.d.] - [n.d.]
Concrete core for dam at Mt. Vernon Reservoir constructed by the WPA., [n.d.] - [n.d.]
Scrap collected by the WPA at Mt. Vernon, October, 1942., [n.d.] - [n.d.]
Scrap collected by the WPA at Mt. Vernon, October, 1942., [n.d.] - [n.d.]
Climax Road constructed by the WPA., [n.d.] - [n.d.]
Brush Creek Road constructed by the WPA., [n.d.] - [n.d.]
Rowan County
Farmers School (front view), 1937/2/15 - 1939/11/2
Farmers School (front view), 1937/2/15 - 1939/11/2
Floors at Farmers School being sanded by WPA worker., [n.d.] - [n.d.]
County Jail at Morehead, KY., 1936/9/25 - 1939/5/18
County Judge Dan Parker, 1942., [n.d.] - [n.d.]
Elliottsville School, 1936/9/25 - 1940/5/7
Elliottsville School, 1936/9/25 - 1940/5/7
Elliottsville School, 1936/9/25 - 1940/5/7
Elliottsville School, 1936/9/25 - 1940/5/7
Concrete pipe constructed by the WPA., [n.d.] - [n.d.]
WPA Warehouse and Office in Morehead, KY., 1939/4/25 - 1940/3/30
WPA Warehouse and Office in Morehead, KY., 1939/4/25 - 1940/3/30
WPA Warehouse and Office in Morehead, KY., 1939/4/25 - 1940/3/30
Septic tank at Morehead, KY., 1940/12/12 - 1941/1/23
Septic tank at Morehead, KY., 1940/12/12 - 1941/1/23
Dynamite magazine constructed by the WPA., [n.d.] - [n.d.]
Haldeman School and Gymnasium., [n.d.] - 1940/1/9
Roofing Haldeman School and Gymnasium., [n.d.] - 1940/1/9
Haldeman School and Gymnasium (side view)., [n.d.] - 1940/1/9
Building retaining wall along bank of creek flowing thru Morehead Teacher's College campus., [n.d.] - [n.d.]
Voting booths constructed by the WPA., [n.d.] - [n.d.]
Voting booths constructed by the WPA., [n.d.] - [n.d.]
Voting booths constructed by the WPA., [n.d.] - [n.d.]
WPA workers shaping building stone., [n.d.] - [n.d.]
Voting booths constructed by the WPA., [n.d.] - [n.d.]
Portable stone crusher operated by WPA workers., [n.d.] - [n.d.]
Big Perry Road constructed by the WPA., [n.d.] - [n.d.]
Big Perry Road constructed by the WPA., [n.d.] - [n.d.]
Big Perry Road, where it leaves #60., [n.d.] - [n.d.]
Bluestone Quarry operated by the WPA., [n.d.] - [n.d.]
County road constructed by the WPA., [n.d.] - [n.d.]
Stone masonry headwall., [n.d.] - [n.d.]
Concrete box culvert., [n.d.] - [n.d.]
Concrete headwall., [n.d.] - [n.d.]
Russell County
Stone crusher and bin operated by the WPA., [n.d.] - [n.d.]
Stone crusher and power unit operated by the WPA., [n.d.] - [n.d.]
Clear Springs Road graded and graveled by the WPA, 1940., [n.d.] - [n.d.]
Road constructed by the WPA, 1941., [n.d.] - [n.d.]
Entrance to Marathon filling station at Jamestown, KY. Court square, 1941., [n.d.] - [n.d.]
Work on court square at Jamestown, KY, 1941. Hotel in background., [n.d.] - [n.d.]
Concrete work on court square in Jamestown, KY. Marathon Oil Co. on corner with Dr. Lawrence's hotel in the background, 1941., [n.d.] - [n.d.]
Work on court square in Jamestown, KY. Courthouse in background, 1941., [n.d.] - [n.d.]
Rowena Quarry operated by the WPA., [n.d.] - [n.d.]
New grade on Greasy Creek Road., [n.d.] - [n.d.]
Jamestown, KY water mains being installed by the WPA., [n.d.] - [n.d.]
Springs which furnish water for Jamestown and Russell Springs., [n.d.] - [n.d.]
WPA workers clearing and grubbing on Crocus Road., [n.d.] - [n.d.]
New grade on Ono Road., [n.d.] - [n.d.]
WPA workers grading road by hand., [n.d.] - [n.d.]
Grading new road with tractor., [n.d.] - [n.d.]
Sloping a road bank by hand., [n.d.] - [n.d.]
Swellton-Olga Road constructed by the WPA., [n.d.] - [n.d.]
Swellton-Olga Road constructed by the WPA., [n.d.] - [n.d.]
Lower Licking Road constructed by the WPA., [n.d.] - [n.d.]
County Courthouse at Jamestown, KY, 1942., [n.d.] - [n.d.]
County Judge J.W. Mitchell, 1942., [n.d.] - [n.d.]
Fonthill Road constructed by the WPA., [n.d.] - [n.d.]
WPA workers constructing Fonthill Road drainage., [n.d.] - [n.d.]
Salem Road constructed by the WPA., [n.d.] - [n.d.]
Four box culvert on Fonthill Road., [n.d.] - [n.d.]
Masonry box culvert., [n.d.] - [n.d.]
Scott County
Rock asphalt street in Georgetown, KY., [n.d.] - [n.d.]
Concrete paving in Georgetown, KY., [n.d.] - [n.d.]
College Street in Georgetown, KY, constructed by the WPA, 1940., [n.d.] - [n.d.]
Stamping Ground waterworks system., 1936/9/8 - 1937/6/20
Street after car rails were removed in Georgetown, KY, 1942., [n.d.] - [n.d.]
Sadieville Water Tank constructed by the WPA., [n.d.] - [n.d.]
Gilead Church Road constructed by the WPA., [n.d.] - [n.d.]
Crumbaugh Road constructed by the WPA., [n.d.] - [n.d.]
County road constructed by the WPA., [n.d.] - [n.d.]
Stone crusher and power unit operated by the WPA., [n.d.] - [n.d.]
Shelby County
Simpsonville Gymnasium., 1936/10/15 - 1937/12/9
Interior of Simpsonville Gymnasium showing stage area., 1936/10/15 - 1937/12/9
Narrow gauge bridge., [n.d.] - [n.d.]
Taylor's Wood Road constructed by the WPA., [n.d.] - [n.d.]
WPA County Warehouse in Shelbyville, KY., 1937/10/22 - 1938/3/21
County Courthouse, 1942., [n.d.] - [n.d.]
Scott's Station Road constructed by the WPA., [n.d.] - [n.d.]
White Oak Road Bridge constructed by the WPA., [n.d.] - [n.d.]
Street construction in Shelbyville, KY., [n.d.] - [n.d.]
Widening culverts., [n.d.] - [n.d.]
Washington Street in Shelbyville surfaced with asphalt., [n.d.] - [n.d.]
Asphalt street in Shelbyville, KY., [n.d.] - [n.d.]
Concrete box culvert., [n.d.] - [n.d.]
Steel arch culvert., [n.d.] - [n.d.]
Rattletrap Bridge constructed by the WPA., [n.d.] - [n.d.]
Rattletrap Bridge constructed by the WPA., [n.d.] - [n.d.]
Simpson County
Stockpile of stone at County Quarry, 1940., [n.d.] - [n.d.]
Stockpile of stone at County Quarry, 1940., [n.d.] - [n.d.]
Barnes Gymnasium., 1937/2/23 - 1937/8/6
Franklin Library and Auditorium., 1936/2/3 - 1938/2/1
Interior of Franklin Auditorium., [n.d.] - [n.d.]
Senator Alben W. Barkley speaking at the dedication of the Franklin Library and Auditorium, June, 1937., [n.d.] - [n.d.]
County Courthouse in Franklin, 1942. Entire square surrounded by benches to keep loafers out of Courthouse., [n.d.] - [n.d.]
Stone masonry headwall constructed by the WPA., [n.d.] - [n.d.]
Butt Road constructed by the WPA., [n.d.] - [n.d.]
Stevenson Road constructed by the WPA., [n.d.] - [n.d.]
Sidewalks around Courthouse Square in Franklin., [n.d.] - [n.d.]
Broadway Road constructed by the WPA., [n.d.] - [n.d.]
County Quarry operated by the WPA., [n.d.] - [n.d.]
Spencer County
Taylorsville School., 1939/4/5 - 1941/6/18
Taylorsville School., 1939/4/5 - 1941/6/18
Taylorsville School., 1939/4/5 - 1941/6/18
Taylorsville School., 1939/4/5 - 1941/6/18
Taylorsville School., 1939/4/5 - 1941/6/18
Taylorsville street after 1940 flood., [n.d.] - [n.d.]
Mud on Taylorsville street after 1940 flood., [n.d.] - [n.d.]
Mud on Taylorsville street after 1940 flood., [n.d.] - [n.d.]
Taylorsville sewer trench constructed by the WPA., [n.d.] - [n.d.]
Taylorsville sewer construction site., [n.d.] - [n.d.]
WPA workers building sewer trench shoring supports., [n.d.] - [n.d.]
Tractor grading street in Taylorsville., [n.d.] - [n.d.]
Taylorsville street ready for repaving., [n.d.] - [n.d.]
County Quarry operated by the WPA., [n.d.] - [n.d.]
Taylor County
Campbellsville Stadium., 1935/12/16 - 1937/6/26
Campbellsville Stadium., 1935/12/16 - 1937/6/26
Campbellsville Stadium., 1935/12/16 - 1937/6/26
Campbellsville Stadium., 1935/12/16 - 1937/6/26
Grading athletic field at Campbellsville Stadium., 1935/12/16 - 1937/6/26
Campbellsville Stadium., 1935/12/16 - 1937/6/26
Campbellsville Stadium., 1935/12/16 - 1937/6/26
The start of Campbellsville High School construction., 1940/9/9 - 1942/1/18
Foundation for Campbellsville High School., 1940/9/9 - 1942/1/18
Brickwork on Campbellsville High School., 1940/9/9 - 1942/1/18
Campbellsville High School under construction., 1940/9/9 - 1942/1/18
Campbellsville High School under construction., 1940/9/9 - 1942/1/18
Campbellsville High School under construction., 1940/9/9 - 1942/1/18
Campbellsville High School nearing construction completion., 1940/9/9 - 1942/1/18
Campbellsville High School after construction completion., 1940/9/9 - 1942/1/18
Campbellsville High School after construction completion., 1940/9/9 - 1942/1/18
Campbellsville sewer under construction by the WPA., [n.d.] - [n.d.]
WPA workers screening sand., [n.d.] - [n.d.]
Heavy road construction., [n.d.] - [n.d.]
Heavy road grade construction., [n.d.] - [n.d.]
Grading a road by hand., [n.d.] - [n.d.]
Excavation for Imhoff Tank to Campbellsville sewers., [n.d.] - [n.d.]
Imhoff Tank to Campbellsville sewers constructed by the WPA., [n.d.] - [n.d.]
Pump house at Campbellsville Disposal Plant., 1937/11/1 - 1940/4/17
Grading Pittman Road., [n.d.] - [n.d.]
Surfacing Pittman Road., [n.d.] - [n.d.]
Drainage structure on Pittman Road under construction by the WPA., [n.d.] - [n.d.]
Bass Road constructed by the WPA., [n.d.] - [n.d.]
Rakes Hill Road constructed by the WPA., [n.d.] - [n.d.]
Pipe culvert and headwalls., [n.d.] - [n.d.]
Box culvert under construction by the WPA on Sunny Hill Road., [n.d.] - [n.d.]
Jerricho Road constructed by the WPA., [n.d.] - [n.d.]
Portable stone crusher being operated by WPA workers., [n.d.] - [n.d.]
Concrete abuttments and pier for bridge on Saloma Road., [n.d.] - [n.d.]
Steel truss bridge on Saloma Road., [n.d.] - [n.d.]
Stone masonry bridge abuttments on Saloma Road., [n.d.] - [n.d.]
Two span bridge on Saloma Road., [n.d.] - [n.d.]
Saloma Road construction by the WPA., [n.d.] - [n.d.]
Todd County
Entrance arch to Blue and Grey State Park., 1935/12/17 - 1936/10/1
Blue and Grey Camp operated by WPA Recreation Division for under privileged children, 1940., [n.d.] - [n.d.]
Blue and Grey Camp operated by WPA Recreation Division for under privileged children, 1940., [n.d.] - [n.d.]
Trenton Gymnasium., 1936/8/24 - 1937/12/2
Trenton Gymnasium., 1936/8/24 - 1937/12/2
Trenton Gymnasium., 1936/8/24 - 1937/12/2
County school under construction by the WPA under Blanket Project., [n.d.] - [n.d.]
Courthouse being repaired by WPA., 1937/2/25 - 1937/5/17
County Judge R.N. Cartwright, 1942., [n.d.] - [n.d.]
Elkton High School Gymnasium., 1937/11/8 - 1939/10/25
Elkton High School and Gymnasium (front view showing schoolbus)., 1937/11/8 - 1939/10/25
Elkton High School and Gymnasium (front view)., 1937/11/8 - 1939/10/25
Allensville School (front view)., 1936/8/24 - 1937/8/27
Allensville School (front view)., 1936/8/24 - 1937/8/27
County Quarry operated by the WPA showing workers loading rock into small rail car., [n.d.] - [n.d.]
Grading road with team of horses., [n.d.] - [n.d.]
County road constructed by the WPA., [n.d.] - [n.d.]
Two 50 ft. span bridge constructed by the WPA., [n.d.] - [n.d.]
Pinchem Road constructed by the WPA., [n.d.] - [n.d.]
Trigg County
Bath house for Cadiz Swimming Pool., 1936/2/25 - 1938/7/25
Swimming Pool at Cadiz, KY., 1936/2/25 - 1938/7/25
Swimming Pool at Cadiz, KY., 1936/2/25 - 1938/7/25
Cadiz High School and Gymnasium (front view)., 1936/11/30 - 1938/10/14
Cadiz High School and Gymnasium (front view)., 1936/11/30 - 1938/10/14
Cadiz High School and Gymnasium (front view)., 1936/11/30 - 1938/10/14
Linton School under construction by the WPA (front view)., 1935/11/11 - 1936/11/11
Linton School under construction by the WPA (side view)., 1935/11/11 - 1936/11/11
County Judge J. Lloyd Blakeley, 1942., [n.d.] - [n.d.]
County road constructed by the WPA., [n.d.] - [n.d.]
County road constructed by the WPA., [n.d.] - [n.d.]
WPA workers using large screen for washing gravel., [n.d.] - [n.d.]
Future Trigg County hams., [n.d.] - [n.d.]
County road constructed by the WPA, 1941., [n.d.] - [n.d.]
County road constructed by the WPA, 1941., [n.d.] - [n.d.]
Trimble County
County Quarry operated by the WPA., [n.d.] - [n.d.]
County Quarry operated by the WPA., [n.d.] - [n.d.]
Bedford street constructed by the WPA., [n.d.] - [n.d.]
Retaining wall near Milton School constructed by the WPA, 1940., [n.d.] - [n.d.]
Concrete pipe made by the WPA stacked against side of building., [n.d.] - [n.d.]
WPA workers sloping road banks by hand., [n.d.] - [n.d.]
Recreation class conducted at Bedford High School., [n.d.] - [n.d.]
Peeks Road constructed by the WPA., [n.d.] - [n.d.]
Vegetable storage cellar in Bedford, KY., [n.d.] - [n.d.]
Sanitation project (outhouse) built by the WPA., [n.d.] - [n.d.]
Union County
Morganfield Bath House and Swimming Pool., 1935/11/25 - 1938/6/9
Morganfield Bath House., 1935/11/25 - 1938/6/9
Uniontown Gymnasium., 1937/5/6 - 1938/5/24
Morganfield Recreation Building., 1937/6/24 - 1937/6/23
Boxville School., 1938/4/11 - 1938/12/1
Boxville School., 1938/4/11 - 1938/12/1
Union County Courthouse in Morganfield before remodeling by the WPA., 1938/4/26 - 1940/6/9
Union County Courthouse remodeled by the WPA., 1938/4/26 - 1940/6/9
Union County Courthouse remodeled by the WPA., 1938/4/26 - 1940/6/9
Morganfield Stadium., 1937/9/25 - 1938/6/9
Sturgis, KY street constructed by the WPA., [n.d.] - [n.d.]
Morganfield street being repaved with concrete., [n.d.] - [n.d.]
County road leading off Highway #60 constructed by the WPA, 1941., [n.d.] - [n.d.]
Highland Bridge Road constructed by the WPA., [n.d.] - [n.d.]
Humphrey Road under construction by the WPA., [n.d.] - [n.d.]
WPA Warehouse and Office in Morganfield, KY., 1940/6/10 - 1940/7/30
WPA Storage Yard and Warehouse in Morganfield, KY., 1940/6/10 - 1940/7/30
Rear of the WPA Warehouse in Morganfield, KY., 1940/6/10 - 1940/7/30
Uniontown sewer under construction by the WPA., [n.d.] - [n.d.]
County Quarry operated by the WPA., [n.d.] - [n.d.]
Warren County
Warren County Jail in Bowling Green, KY., 1938/5/3 - 1939/12/8
Warren County Jail in Bowling Green, KY (side view)., 1938/5/3 - 1939/12/8
Warren County Jail in Bowling Green, KY (rear view)., 1938/5/3 - 1939/12/8
Cell block control at Warren County Jail in Bowling Green, KY., 1938/5/3 - 1939/12/8
Bull pen at the Warren County Jail in Bowling Green, KY., 1938/5/3 - 1939/12/8
Alvaton Gymnasium., 1939/9/30 - 1940/8/26
Brass plate on Alvaton Gymnasium stating, "Constructed In Cooperation With The Works Progress Administration In Kentucky, 1940.", 1939/9/30 - 1940/8/26
Alvaton Gymnasium after construction completion., 1939/9/30 - 1940/8/26
Entrance to Alvaton Gymnasium under construction., 1939/9/30 - 1940/8/26
Alvaton Gymnasium after construction completion., 1939/9/30 - 1940/8/26
Start of construction of Smith Grove School., 1940/8/5 - 1943/2/13
Architectural concrete on Smith Grove School., 1940/8/5 - 1943/2/13
Architectural concrete on Smith Grove School., 1940/8/5 - 1943/2/13
Framing for Smith Grove High School., 1940/8/5 - 1943/2/13
Framing for Smith Grove High School., 1940/8/5 - 1943/2/13
Framing for Smith Grove High School., 1940/8/5 - 1943/2/13
Smith Grove High School under construction., 1940/8/5 - 1943/2/13
Foundation for Smith Grove High School., 1940/8/5 - 1943/2/13
Smith Grove High School under construction., 1940/8/5 - 1943/2/13
Smith Grove High School under construction., 1940/8/5 - 1943/2/13
Smith Grove High School under construction., 1940/8/5 - 1943/2/13
Smith Grove High School under construction., 1940/8/5 - 1943/2/13
Entrance to Smith Grove High School under construction., 1940/8/5 - 1943/2/13
Smith Grove High School under construction., 1940/8/5 - 1943/2/13
Smith Grove High School under construction., 1940/8/5 - 1943/2/13
Smith Grove High School High School. "I believe this is the best job we have done in the state.", 1940/8/5 - 1943/2/13
Massive entrance to Smith Grove High School., 1940/8/5 - 1943/2/13
Massive entrance to Smith Grove High School. Note owl over doorway., 1940/8/5 - 1943/2/13
Southeast view of Smith Grove High School., 1940/8/5 - 1943/2/13
Entrance to Smith Grove High School under construction., 1940/8/5 - 1943/2/13
Smith Grove High School after construction completion., 1940/8/5 - 1943/2/13
Smith Grove High School under construction., 1940/8/5 - 1943/2/13
Architectural concrete on Smith Grove High School., 1940/8/5 - 1943/2/13
Smith Grove High School nearing construction completion., 1940/8/5 - 1943/2/13
Smith Grove High School nearing construction completion (front view)., 1940/8/5 - 1943/2/13
Northwest view of Smith Grove High School., 1940/8/5 - 1943/2/13
Smith Grove High School at or nearing construction completion (side view)., 1940/8/5 - 1943/2/13
Interior of library at Smith Grove High School., 1940/8/5 - 1943/2/13
Interior of library at Smith Grove High School., 1940/8/5 - 1943/2/13
Second floor hallway at Smith Grove High School., 1940/8/5 - 1943/2/13
First floor hallway at Smith Grove High School., 1940/8/5 - 1943/2/13
Auditorium of Smith Grove High School. View taken from rear of hall., 1940/8/5 - 1943/2/13
Auditorium of Smith Grove High School. View taken from stage., 1940/8/5 - 1943/2/13
Auditorium of Smith Grove High School. View taken from rear of hall., 1940/8/5 - 1943/2/13
City Garage., 1940/8/12 - 1941/2/4
Boyce Spring Road and Bridge constructed by the WPA., [n.d.] - [n.d.]
Boyce Spring Road and Bridge constructed by the WPA., [n.d.] - [n.d.]
Richardsville Road constructed by the WPA., [n.d.] - [n.d.]
Glen Lilly Road constructed by the WPA., [n.d.] - [n.d.]
County road constructed by the WPA., [n.d.] - [n.d.]
Airport Road constructed by the WPA., [n.d.] - [n.d.]
Surfacing Boat Landing Road in Bowling Green, KY., [n.d.] - [n.d.]
WPA Office and Warehouse in Bowling Green, KY., 1940/8/12 - 1941/2/4
WPA Office and Warehouse in Bowling Green, KY., 1940/8/12 - 1941/2/4
Oakland School under construction by the WPA., 1937/2/23 - 1937/6/1
Kentucky Building at Western Kentucky State Teachers College in Bowling Green, KY., [n.d.] - [n.d.]
Kentucky Building at Western Kentucky State Teachers College in Bowling Green, KY., [n.d.] - [n.d.]
Fish Pond., 1936/1/28 - 1938/12/5
Music Building at Western Kentucky State Teachers College in Bowling Green, KY., [n.d.] - 1940/2/5
Music Building at Western Kentucky State Teachers College in Bowling Green, KY., [n.d.] - 1940/2/5
Hadley Gymnasium under construction., 1938/3/10 - 1939/5/27
Municipal Golf Course in Bowling Green, KY. "Probably has the most play of any nine hole course in the state. Good course.", 1939/3/28 - 1939/6/9
Small House Pike in Bowling Green, KY, constructed by the WPA., [n.d.] - [n.d.]
Asphalt surface on 11th Street in Bowling Green, KY., [n.d.] - [n.d.]
Asphalt surface on 10th Street in Bowling Green, KY., [n.d.] - [n.d.]
Storm drainage under construction in Bowling Green, KY., [n.d.] - [n.d.]
Water main installation in Bowling Green, KY., [n.d.] - [n.d.]
County Quarry operated by the WPA., [n.d.] - [n.d.]
Scrap pile in Bowling Green, KY, October, 1942., [n.d.] - [n.d.]
Scrap pile in Bowling Green, KY, October, 1942., [n.d.] - [n.d.]
Scrap pile in Bowling Green, KY, October, 1942., [n.d.] - [n.d.]
Washington County
Springfield Armory under construction by the WPA., 1940/9/3 - 1942/3/25
Springfield Armory under construction by the WPA., 1940/9/3 - 1942/3/25
Springfield Armory under construction by the WPA., 1940/9/3 - 1942/3/25
Springfield Armory under construction by the WPA., 1940/9/3 - 1942/3/25
Springfield Armory under construction by the WPA., 1940/9/3 - 1942/3/25
Springfield Armory under construction by the WPA., 1940/9/3 - 1942/3/25
Springfield Armory under construction by the WPA., 1940/9/3 - 1942/3/25
Springfield Armory under construction by the WPA., 1940/9/3 - 1942/3/25
Springfield Armory under construction by the WPA., 1940/9/3 - 1942/3/25
Form work at Springfield Armory., 1940/9/3 - 1942/3/25
Entrance to the Springfield Armory., 1940/9/3 - 1942/3/25
Springfield Armory after construction completion., 1940/9/3 - 1942/3/25
Springfield Armory under construction by the WPA., 1940/9/3 - 1942/3/25
Springfield Armory after construction completion., 1940/9/3 - 1942/3/25
Interior of Springfield Armory., 1940/9/3 - 1942/3/25
Hugh Crozier, Brucker Miller, Doug Hill, and Ed Marye at dedication of the Springfield Armory, May 21, 1942., [n.d.] - [n.d.]
Washington County Courthouse Addition nearing completion in Springfield, KY., 1938/7/31 - 1939/8/31
Washington County Courthouse Addition after construction completion., 1938/7/31 - 1939/8/31
Washington County Courthouse (front view), 1942., [n.d.] - [n.d.]
Rowlock type brick construction on Willisburg School and Gymnasium., 1936/10/30 - 1938/2/14
Willisburg School and Gymnasium., 1936/10/30 - 1938/2/14
Willisburg Gymnasium (side view)., 1936/10/30 - 1938/2/14
Cistern construction at Mackville School and Gymnasium., 1935/11/14 - 1936/9/28
Concrete sidewalk under construction in Willisburg, KY., [n.d.] - [n.d.]
Mackville School and Gymnasium (side view)., 1935/11/14 - 1936/9/28
High Street in Springfield, KY constructed by the WPA., [n.d.] - [n.d.]
Mooresville Road under construction by the WPA., [n.d.] - [n.d.]
County road constructed by the WPA (winter scene)., [n.d.] - [n.d.]
Concrete pipe made by the WPA., [n.d.] - [n.d.]
Battle Road constructed by the WPA., [n.d.] - [n.d.]
Excavating for drainage on Chaplin Road., [n.d.] - [n.d.]
Stone masonry culvert. Over 300 built by the WPA in Washington County., [n.d.] - [n.d.]
Concrete box culvert., [n.d.] - [n.d.]
Storm drainage in Springfield., [n.d.] - [n.d.]
Walnut Street Bridge in Springfield., [n.d.] - [n.d.]
Portable stone crusher being operated by WPA workers., [n.d.] - [n.d.]
Road shovel being operated by WPA workers., [n.d.] - [n.d.]
Wayne County
Negro School and Gymnasium (front view) in Monticello, KY., 1937/3/1 - 1937/7/13
Negro School and Gymnasium (rear view) in Monticello, KY., 1937/3/1 - 1937/7/13
Rocky Branch School (front view)., 1938/4/25 - 1939/5/13
Beech Grove School constructed by the WPA under the Blanket School Project (front view)., [n.d.] - [n.d.]
Slick Ford School constructed by the WPA under the Blanket School Project., [n.d.] - [n.d.]
Coopersville School constructed by the WPA under the Blanket School Project., [n.d.] - [n.d.]
Old Mill Spring School in disrepair., [n.d.] - [n.d.]
New Mill Spring School constructed by the WPA under the Blanket School Project., [n.d.] - [n.d.]
Dry Hollow Log School dating back to 1813 or 1814., [n.d.] - [n.d.]
Monticello High School under construction by the WPA., 1939/5/22 - 1941/7/31
Stone work on Monticello High School. Dark streaks are fresh mortar., 1939/5/22 - 1941/7/31
Monticello High School under construction, one of the WPA's biggest buildings., 1939/5/22 - 1941/7/31
Cutting stone in shed for Monticello High School., 1939/5/22 - 1941/7/31
Pouring third floor slab at Monticello High School., 1939/5/22 - 1941/7/31
Shaping stone for Monticello High School., 1939/5/22 - 1941/7/31
Monticello High School under construction., 1939/5/22 - 1941/7/31
Monticello High School nearing construction completion., 1939/5/22 - 1941/7/31
Monticello High School nearing construction completion., 1939/5/22 - 1941/7/31
Monticello High School (rear view) showing school bus., 1939/5/22 - 1941/7/31
Monticello High School (side view)., 1939/5/22 - 1941/7/31
Monticello High School (rear view)., 1939/5/22 - 1941/7/31
Monticello High School (front view)., 1939/5/22 - 1941/7/31
Monticello High School (front view)., 1939/5/22 - 1941/7/31
Monticello High School (side view)., 1939/5/22 - 1941/7/31
Monticello City Hall, Jail and Fire Station., 1936/1/7 - 1937/1/11
Excavating for Kennedy Creek Bridge abuttment., [n.d.] - [n.d.]
Kennedy Creek Bridge constructed by the WPA., [n.d.] - [n.d.]
Benches and desks in Log Cabin School., [n.d.] - [n.d.]
Shearer Valley Road constructed by the WPA., [n.d.] - [n.d.]
No-Nox-In Road constructed by the WPA., [n.d.] - [n.d.]
No-Nox-In Road constructed by the WPA., [n.d.] - [n.d.]
Building grade on Elk Ridge Road., [n.d.] - [n.d.]
Elk Ridge Road and drainage construction., [n.d.] - [n.d.]
County Courthouse toilet building constructed by the WPA., [n.d.] - [n.d.]
Monticello sewer construction project., [n.d.] - [n.d.]
WPA sewer installation in Monticello with City Hall and Fire Station in the background., [n.d.] - [n.d.]
Monticello sewer construction project., [n.d.] - [n.d.]
Making sidehill cut for new road., [n.d.] - [n.d.]
5-yard road scraper., [n.d.] - [n.d.]
Clearing new road bed by hand., [n.d.] - [n.d.]
Lock #21 Road., [n.d.] - [n.d.]
County road construction., [n.d.] - [n.d.]
County road leaving highway., [n.d.] - [n.d.]
Surfacing Frazier Road., [n.d.] - [n.d.]
Murl Road constructed by the WPA., [n.d.] - [n.d.]
Box culvert with fill being made in the background., [n.d.] - [n.d.]
Single box culvert., [n.d.] - [n.d.]
Stone masonry abuttment., [n.d.] - [n.d.]
Double box culvert., [n.d.] - [n.d.]
Dynamite magazine constructed by the WPA., [n.d.] - [n.d.]
Stone crusher operated by the WPA., [n.d.] - [n.d.]
County Quarry operated by the WPA., [n.d.] - [n.d.]
Good stone masonry box culvert constructed by the WPA., [n.d.] - [n.d.]
Webster County
Architectural concrete used for County Courthouse in Dixon, KY., 1939/9/1 - 1941/9/25
County Courthouse under construction in Dixon, KY., 1939/9/1 - 1941/9/25
County Courthouse under construction in Dixon, KY (rear view)., 1939/9/1 - 1941/9/25
View from northeast corner of County Courthouse construction in Dixon, KY., 1939/9/1 - 1941/9/25
County Courthouse nearing construction completion in Dixon, KY., 1939/9/1 - 1941/9/25
View from southeast corner of County Courthouse construction in Dixon, KY., 1939/9/1 - 1941/9/25
County Courthouse in Dixon, KY after construction completion., 1939/9/1 - 1941/9/25
County Judge W.D. Whitledge, 1942., [n.d.] - [n.d.]
View from northside of County Courthouse construction in Dixon, KY., 1939/9/1 - 1941/9/25
Rear view of County Courthouse construction in Dixon, KY., 1939/9/1 - 1941/9/25
County Courthouse in Dixon, KY after construction completion., 1939/9/1 - 1941/9/25
View from northeast corner of County Courthouse construction in Dixon, KY., 1939/9/1 - 1941/9/25
Rear view of County Courthouse construction in Dixon, KY., 1939/9/1 - 1941/9/25
County Courthouse in Dixon, KY after construction completion., 1939/9/1 - 1941/9/25
County Courthouse in Dixon, KY after construction completion., 1939/9/1 - 1941/9/25
County Courthouse in Dixon, KY after construction completion., 1939/9/1 - 1941/9/25
County Courthouse in Dixon, KY after construction completion (rear view)., 1939/9/1 - 1941/9/25
Front entrance of County Courthouse., 1939/9/1 - 1941/9/25
County Courthouse courtroom (view from rear balcony)., 1939/9/1 - 1941/9/25
Children at the WPA Library., [n.d.] - [n.d.]
Ferry operator, a regular visitor to the WPA Library, waiting for ferry customers., [n.d.] - [n.d.]
Sebree Road under construction by the WPA., [n.d.] - [n.d.]
Clay Stadium constructed by the WPA., 1936/8/11 - 1937/9/25
Sebree Colored School under construction by the WPA., 1938/2/11 - 1938/6/1
Concrete pipe made by the WPA., [n.d.] - [n.d.]
Stone masonry bridge abuttment under construction by the WPA., [n.d.] - [n.d.]
Classrooms at Slaughter's School taken in the rain., 1940/12/4 - [n.d.]
Slaughter's School classrooms showing gymnasium on the right., 1940/12/4 - [n.d.]
Slaughter's School and Gymnasium (rear view)., 1940/12/4 - [n.d.]
Slaughter's School and Gymnasium (front view)., 1940/12/4 - [n.d.]
Slaughter's School Gymnasium (front view)., 1940/12/4 - [n.d.]
Slaughter's School Gymnasium (side view)., 1940/12/4 - [n.d.]
Whitley County
Woodbine School and Gymnasium (side view)., 1936/3/2 - 1938/1/13
Woodbine School and Gymnasium., 1936/3/2 - 1938/1/13
Woodbine School showing crowd outside of school., 1936/3/2 - 1938/1/13
Williamsburg Gymnasium (side view)., 1936/4/9 - 1938/1/7
Williamsburg County Jail., 1936/5/2 - 1938/1/22
Williamsburg County Jail., 1936/5/2 - 1938/1/22
Pleasant View School (side view)., 1938/3/17 - 1939/4/17
Pleasant View School (front view)., 1938/3/17 - 1939/4/17
County Judge W.M Bennett, 1942., [n.d.] - [n.d.]
Corbin Stadium grandstand under construction by the WPA., 1940/3/4 - 1941/1/31
Corbin athletic field from top of stadium., 1940/3/4 - 1941/1/31
Concrete stadium in Corbin built by the WPA., 1940/3/4 - 1941/1/31
Corbin Stadium grandstand viewed from the athletic field., 1940/3/4 - 1941/1/31
Corbin Stadium (rear view)., 1940/3/4 - 1941/1/31
Side view of Corbin Stadium grandstand., 1940/3/4 - 1941/1/31
Side view of Corbin Stadium grandstand., 1940/3/4 - 1941/1/31
Corbin Stadium (rear view)., 1940/3/4 - 1941/1/31
Corbin Stadium showing concrete work., 1940/3/4 - 1941/1/31
Corbin High School Gymnasium., 1938/5/18 - 1938/9/23
Corbin High School Gymnasium., 1938/5/18 - 1938/9/23
WPA Warehouse in Williamsburg, KY., 1938/10/3 - 1939/10/5
Savoy School constructed by the WPA under the Blanket Project., [n.d.] - [n.d.]
Jack's Fork Bridge constructed by the WPA., [n.d.] - [n.d.]
County school constructed by the WPA under the Blanket Project., [n.d.] - [n.d.]
Training Work Center women cleaning yard of project location at Corbin, KY, 1941., [n.d.] - [n.d.]
Corbin sewers under construction by the WPA, 1940., [n.d.] - [n.d.]
Corbin street and curb under construction by the WPA., [n.d.] - [n.d.]
Clear Fork Road under construction by the WPA., [n.d.] - [n.d.]
Road grading by the WPA., [n.d.] - [n.d.]
Gatliff Road constructed by the WPA., [n.d.] - [n.d.]
Culvert on Jellico Road constructed by the WPA., [n.d.] - [n.d.]
Drainage structure constructed by the WPA., [n.d.] - [n.d.]
Dupont Lodge at Cumberland Falls. "A good project really moving.", 1940/9/26 - 1941/11/25
Dupont Lodge at Cumberland Falls under construction., 1940/9/26 - 1941/11/25
Dupont Lodge at Cumberland Falls under construction. View from top of roof., 1940/9/26 - 1941/11/25
Stone masonry fireplace at Dupont Lodge at Cumberland Falls., 1940/9/26 - 1941/11/25
Dupont Lodge at Cumberland Falls under construction., 1940/9/26 - 1941/11/25
Dupont Lodge at Cumberland Falls under construction., 1940/9/26 - 1941/11/25
Fireplace in dining room of Dupont Lodge at Cumberland Falls., 1940/9/26 - 1941/11/25
Fireplace in living room of Dupont Lodge at Cumberland Falls., 1940/9/26 - 1941/11/25
Entrance to Dupont Lodge at Cumberland Falls., 1940/9/26 - 1941/11/25
Dupont Lodge at Cumberland Falls (view from the road)., 1940/9/26 - 1941/11/25
Dupont Lodge at Cumberland Falls nearing construction completion (front view)., 1940/9/26 - 1941/11/25
Dupont Lodge at Cumberland Falls nearing construction completion (front view)., 1940/9/26 - 1941/11/25
Dupont Lodge at Cumberland Falls nearing construction completion (front view)., 1940/9/26 - 1941/11/25
WPA sign in front of Dupont Lodge construction site., 1940/9/26 - 1941/11/25
Dupont Lodge at Cumberland Falls (side view of front)., 1940/9/26 - 1941/11/25
Dupont Lodge at Cumberland Falls (front view)., 1940/9/26 - 1941/11/25
End of east wing of Dupont Lodge at Cumberland Falls., 1940/9/26 - 1941/11/25
Fireplace in lobby of Dupont Lodge at Cumberland Falls., 1940/9/26 - 1941/11/25
Cumberland River from rear porch of Dupont Lodge., [n.d.] - [n.d.]
Entrance to Dupont Lodge at Cumberland Falls., [n.d.] - [n.d.]
Driving through pines approaching Dupont Lodge construction site at Cumberland Falls., 1940/9/26 - 1941/11/25
Shaping stone for Dupont Lodge at Cumberland Falls., [n.d.] - [n.d.]
Dupont Lodge at Cumberland Falls after construction completion., 1940/9/26 - 1941/11/25
Williamsburg Armory construction site., 1941/8/26 - [n.d.]
Williamsburg Armory construction site., 1941/8/26 - [n.d.]
Williamsburg Armory under construction., 1941/8/26 - [n.d.]
Pouring concrete slab for Williamsburg Armory., 1941/8/26 - [n.d.]
Shoring on Williamsburg Armory., 1941/8/26 - [n.d.]
Williamsburg Armory under construction., 1941/8/26 - [n.d.]
Williamsburg Armory under construction., 1941/8/26 - [n.d.]
Williamsburg Armory under construction., 1941/8/26 - [n.d.]
Shoring on Williamsburg Armory., 1941/8/26 - [n.d.]
Walls for Williamsburg Armory under construction., 1941/8/26 - [n.d.]
Williamsburg Armory construction site. Sign on contractor's building states, "Stay Out.", 1941/8/26 - [n.d.]
Wall construction for Williamsburg Armory., 1941/8/26 - [n.d.]
Williamsburg Armory after construction completion., 1941/8/26 - [n.d.]
Williamsburg Armory after construction completion., 1941/8/26 - [n.d.]
Detail of concrete arch and slab roof over drill hall at Williamsburg Armory., 1941/8/26 - [n.d.]
Williamsburg Armory under construction (front view)., 1941/8/26 - [n.d.]
Foundation for Rockhold School., 1940/11/12 - [n.d.]
Rockhold School at or near construction completion., 1940/11/12 - [n.d.]
Rockhold School at or near construction completion., 1940/11/12 - [n.d.]
Mud Creek Quarry operated by the WPA., [n.d.] - [n.d.]
Dynamite magazine constructed by the WPA., [n.d.] - [n.d.]
Close up view of Cumberland Falls, 1941., [n.d.] - [n.d.]
Cumberland Falls from behind the falls, 1941., [n.d.] - [n.d.]
Close up view of Cumberland Falls, 1941., [n.d.] - [n.d.]
Cumberland River viewed from above the falls, 1941., [n.d.] - [n.d.]
Cumberland River viewed from rear porch of the Dupont Lodge, 1941., [n.d.] - [n.d.]
Cumberland Falls viewed from above the falls, 1941., [n.d.] - [n.d.]
Cumberland Falls viewed from the Whitley County side, 1941., [n.d.] - [n.d.]
Cumberland Falls viewed from the Whitley County side, 1941., [n.d.] - [n.d.]
Rainbow in mist of Cumberland Falls, Moombow shows same way when moon is full, 1941., [n.d.] - [n.d.]
Cabin at Cumberland Falls, 1941., [n.d.] - [n.d.]
Pool below Cumberland Falls, 1941., [n.d.] - [n.d.]
Pool below Cumberland Falls, 1941., [n.d.] - [n.d.]
Brink at Cumberland Falls, 1941., [n.d.] - [n.d.]
Wolfe County
Hazel Green School (front view)., 1935/11/7 - 1937/5/20
Hazel Green School (front view)., 1935/11/7 - 1937/5/20
Hazel Green School (front-side view), 1935/11/7 - 1937/5/20
Campton, KY sidewalk constructed by the WPA across a creek., [n.d.] - [n.d.]
WPA workers sloping banks by hand on Holly Road., [n.d.] - [n.d.]
Holly Road constructed by the WPA., [n.d.] - [n.d.]
Lee City road under construction by the WPA., [n.d.] - [n.d.]
County Courthouse in Campton, 1942., [n.d.] - [n.d.]
Campton High School under construction., 1938/6/21 - [n.d.]
Campton, KY viewed from high school construction site., [n.d.] - [n.d.]
Foundation for Campton High School., 1938/6/21 - [n.d.]
Foundation for Campton High School., 1938/6/21 - [n.d.]
Foundation pillars for Campton High School Gymnasium., 1938/6/21 - [n.d.]
Foundation for Campton High School., 1938/6/21 - [n.d.]
Campton High School under construction showing partition walls., 1938/6/21 - [n.d.]
Part of foundation for Campton High School., 1938/6/21 - [n.d.]
Part of foundation for Campton High School., 1938/6/21 - [n.d.]
Part of foundation for Campton High School., 1938/6/21 - [n.d.]
Campton High School under construction. Note weeds growing within the foundation walls., 1938/6/21 - [n.d.]
Foundation walls of Campton High School., 1938/6/21 - [n.d.]
Lacey Creek Road constructed by the WPA., [n.d.] - [n.d.]
Lacey Creek Road constructed by the WPA., [n.d.] - [n.d.]
Big Andy Road constructed by the WPA., [n.d.] - [n.d.]
Dynamite magazine constructed by the WPA., [n.d.] - [n.d.]
Woodford County
Sanitary sewer under construction in Versailles, KY by the WPA., [n.d.] - [n.d.]
WPA workers constructing Versailles, KY storm sewer., [n.d.] - [n.d.]
Sewer under construction in Versailles, KY., [n.d.] - [n.d.]
Watt's Ferry Road constructed by the WPA., [n.d.] - [n.d.]
Leestown Pike constructed by the WPA., [n.d.] - [n.d.]
Oregon Road constructed by the WPA., [n.d.] - [n.d.]
Concrete curb and gutter in Versailles, KY constructed by the WPA., [n.d.] - [n.d.]
Bridge abuttment under construction by the WPA., [n.d.] - [n.d.]
Jefferson County
Architecture
Miscellaneous
WPA Administration
Harry L. Hopkins, FERA and WPA Administrator, May 1933-December 23, 1938, on which date he was appointed U.S. Secretary of Commerce., [n.d.] - [n.d.]
Francis C. Harrington, Assistant Administrator, September 28, 1935-December 23, 1938, when he was appointed Administrator. Deceased September 30, 1940., [n.d.] - [n.d.]
Howard O. Hunter, appointed Assistant Administrator and Field Representative August, 1933; appointed Deputy Administrator, January 18, 1939; appointed Acting Commissioner, October 1, 1940; Commissioner, June, 1941, and resigned May 1, 1942., [n.d.] - [n.d.]
Major B.M. Harloe, detailed for duty with WPA, 1935, appointed Executive Assistant to Chief Engineer of WPA, July, 1938, appointed Assistant Commissioner and Chief Engineer, December, 1938, returned to active duty with War Department, July 19, 1940., [n.d.] - [n.d.]
Fred R. Rauch, District Engineer and Associate State Engineer of Civil Works Administration in Kentucky, November, 1933; returned to private employment in 1934, and in July, 1935, accepted appointment as Director of Labor Management for Works Progress Administration; assigned to Works Progress Administration Regional Office, October 1, 1935; appointed Assistant Administrator in charge of Division of Employment, Washington, D.C., February 1, 1936; appointed Deputy Administrator, Works Progress Administration, October 11, 1940, and resigned January 1, 1942., [n.d.] - [n.d.]
Mrs. Florence S. Kerr, appointed Regional Director of Women's & Professional Projects, 1935; appointed Assistant Administrator, January 3, 1939., [n.d.] - [n.d.]
Arnold J. Hermes, [n.d.] - [n.d.]
James B. Boddie, [n.d.] - [n.d.]
Thomas L. Lynch, Project Services., [n.d.] - [n.d.]
Ethel Perryman, Service Division., [n.d.] - [n.d.]
Mrs. Brunette Coslow, Feeding Program., [n.d.] - [n.d.]
Douglass Ramey, Recreation Supervisor., [n.d.] - [n.d.]
Lawrence Jones, State Indexing Supervisor., [n.d.] - [n.d.]
Lindsey E. Allen, Education Project., [n.d.] - [n.d.]
Florence Bender, Nursery Schools, [n.d.] - [n.d.]
Louise Kelly, Service Division, [n.d.] - [n.d.]
Harold G. Arnett, Regional Records Projects., [n.d.] - [n.d.]
Roger Brentlinger., [n.d.] - [n.d.]
(Left to Right) Page, Operations Field Representative; Jarvis, Glasgow District Director; Crowe, Project Superintendent, Logan County., [n.d.] - [n.d.]
(Left to Right) W.M. Jarvis, U.L. Fevrier, and Ted Johnson, 1940., [n.d.] - [n.d.]
Hugh Crozer (left) and Zack Taylor., [n.d.] - [n.d.]
Hugh Crozer, Brucker Miller, Doug Hill, and E.A. Marye at Dedication of the Springfield Armory, May 21, 1942., [n.d.] - [n.d.]
Brucker Miller, Doug Hill, and Mr. Gregg at Dedication of the Springfield Armory, May 21, 1942., [n.d.] - [n.d.]
State WPA Office located in the Gibbs-Inman Building, 9th & Broadway, Louisville, KY, May, 1942., [n.d.] - [n.d.]
State WPA Office located in the Gibbs-Inman Building, taken on 9th Street south of Broadway, Louisville, KY, March, 1942., [n.d.] - [n.d.]
Brucker Miller and Bill Burton, Louisville District., [n.d.] - [n.d.]
Curba Dean, Steve Vaughn, Red Combs, and Jimmie Hill., [n.d.] - [n.d.]
Arnold J. Hermes, Brucker Miller, and E.A. Marye, March, 1943., [n.d.] - [n.d.]
Brucker Miller, Richard C. Page, Arnold J. Hermes, and E.A. Marye, March, 1943., [n.d.] - [n.d.]
Cabinets in Mr. Goodman's office containing photographs of WPA Projects, March, 1943., [n.d.] - [n.d.]
Jefferson County
1937 Flood
Men loading furniture onto a skiff as flood waters rise in Louisville, KY., [n.d.] - [n.d.]
Men loading furniture off of a skiff into a dump truck in front of Jos. H. Dodson furniture storage building as flood waters rise in Louisville, KY., [n.d.] - [n.d.]
Men rowing furniture piled on a raft to safety in Louisville, KY., [n.d.] - [n.d.]
Interior of flood damaged grocery store in Louisville, KY., [n.d.] - [n.d.]
Two men moving furniture out of path of rising flood waters on farm in Jefferson County., [n.d.] - [n.d.]
Debris left behind by flood waters in Louisville, KY., [n.d.] - [n.d.]
Men walking past McKenney Drugs and Piggly Wiggly stores on flood damaged street in Louisville, KY., [n.d.] - [n.d.]
An outbuilding deposited on rooftops by flood waters in Louisville, KY., [n.d.] - [n.d.]
Workers rumage through residential debris left by flood waters in Louisville, KY., [n.d.] - [n.d.]
Flooded interior of machine shop or printing press in Louisville, KY., [n.d.] - [n.d.]
Furniture being loaded into a truck from flooded residence, while two dogs are rescued by men in a skiff., [n.d.] - [n.d.]
Two men loading furniture from a residence onto a flatbed truck in Louisville, KY., [n.d.] - [n.d.]
Three men loading furniture onto a truck at night in the face of rising flood waters in Louisville, KY., [n.d.] - [n.d.]
Men loading furniture onto a truck at night in the face of rising flood waters in Louisville, KY., [n.d.] - [n.d.]
Meeting in Louisville Mayor's office, February 5, 1937, during flood. Mayor Neville Miller and Harry L. Hopkins with E.A. Marye and A.M. Woody in the background., [n.d.] - [n.d.]
Entrance to WPA Office at the Gibbs-Inman Building at 9th and Broadway, in Louisville, KY, showing flood waters, January, 1937., [n.d.] - [n.d.]
Looking east from Tenth and Broadway in Louisville, KY, January, 1937. The L & N Office Building is shown on the right., [n.d.] - [n.d.]
Looking northeast from the corner of 9th and Broadway (the State WPA Office), showing stranded truck in the middle of flood waters, January, 1937., [n.d.] - [n.d.]
WPA workers repairing a cave in on the north side of the Louisville Free Public Library after the 1937 flood., [n.d.] - [n.d.]
Building a pontoon bridge on Baxter Ave. in Louisville, KY, January, 1937., [n.d.] - [n.d.]
Pontoon bridge erected on Baxter Ave. in Louisville, KY, January, 1937., [n.d.] - [n.d.]
Pontoon bridge erected on Baxter Ave. in Louisville, KY, January, 1937., [n.d.] - [n.d.]
Church of Our Lady, 35th and Rudd in Louisville, KY, showing flood waters (front view)., [n.d.] - [n.d.]
Church of Our Lady, 35th and Rudd in Louisville, KY, showing flood waters (side view)., [n.d.] - [n.d.]
First and Main Streets in Louisville, KY, showing flood waters and railroad tank cars afloat at the L & N Railroad Depot., [n.d.] - [n.d.]
Drowned cattle., [n.d.] - [n.d.]
View taken from the Eastern Parkway in Louisville, KY, showing flood waters., [n.d.] - [n.d.]
View taken from the Eastern Parkway in Louisville, KY, showing flood waters and homes., [n.d.] - [n.d.]
Eastern Parkway and mature trees in Louisville, KY, submerged by flood waters., [n.d.] - [n.d.]
West Broadway in Louisville, KY, showing flooded homes., [n.d.] - [n.d.]
Street scene in Louisville, KY, showing flood waters in unidentified residential area., [n.d.] - [n.d.]
Street scene in Louisville, KY, showing flood waters in unidentified residential area., [n.d.] - [n.d.]
Street scene in Louisville, KY, showing flood waters in unidentified residential area., [n.d.] - [n.d.]
Flood waters in unidentified Louisville, KY, residential area., [n.d.] - [n.d.]
Street scene in Louisville, KY, showing flood waters in unidentified residential area., [n.d.] - [n.d.]
Unidentified residence in Louisville, KY, affected by flood waters., [n.d.] - [n.d.]
Debris left by flood waters on top of telephone pole in Louisville, KY., [n.d.] - [n.d.]
Destroyed and damaged houses and out-buildings in Louisville, KY., [n.d.] - [n.d.]
Two unidentified men standing on roof of destroyed building surrounded by flood waters. Railroad bridges visible in the background., [n.d.] - [n.d.]
Buildings under water in Louisville, KY., [n.d.] - [n.d.]
Destroyed building partially underwater in Louisville, KY., [n.d.] - [n.d.]
Men in boat in unidentified alleyway in Louisville, KY., [n.d.] - [n.d.]
Man saving furniture in a skiff with WPA sign on piece of furniture in Louisville, KY., [n.d.] - [n.d.]
Woman being helped out of a window into skiff in Louisville, KY., [n.d.] - [n.d.]
Baby in large basket holding a mop in temporary bedroom in Louisville, KY., [n.d.] - [n.d.]
Interior of flood damaged bedroom, Louisville, KY., [n.d.] - [n.d.]
Interior of flood damaged dining room in Louisville, KY., [n.d.] - [n.d.]
Furniture and other household items stacked outside residence with flood waters only feet away., [n.d.] - [n.d.]
Tobacco warehouse converted to temporary shelter in Louisville, KY., [n.d.] - [n.d.]
Tobacco warehouse converted to temporary shelter in Louisville, KY. Children are sitting on beds., [n.d.] - [n.d.]
Men loading piece of furniture into railroad boxcar in Louisville, KY., [n.d.] - [n.d.]
Woman and child who were evacuated lying on make-shift bed of straw in Louisville, KY., [n.d.] - [n.d.]
Typhoid fever shots being given during the flood., [n.d.] - [n.d.]
WPA workers repairing cave-in caused by flood waters in Louisville, KY., [n.d.] - [n.d.]
WPA workers repairing cave-in caused by flood waters in Louisville, KY., [n.d.] - [n.d.]
WPA workers repairing cave-in caused by flood waters in Louisville, KY., [n.d.] - [n.d.]
Food being prepared for flood victims in Louisville, KY., [n.d.] - [n.d.]
Women sewing for flood victims in Louisville, KY., [n.d.] - [n.d.]
Martin's Men Shop at the northeast corner of 4th and Broadway in Louisville, KY., [n.d.] - [n.d.]
Jefferson County
Associate Justice of the U.S. Supreme Court, Stanley F. Reed, making his address at the laying of the cornerstone of School of Law, University of Louisville, June 7, 1938., [n.d.] - [n.d.]
Associate Justice of the U.S. Supreme Court, Stanley F. Reed, making his address at the laying of the cornerstone of School of Law, University of Louisville, June 7, 1938., [n.d.] - [n.d.]
President Raymond A. Kent breaking ground for Speed Scientific School, University of Louisiville, February 14, 1940., [n.d.] - [n.d.]
Marion County
Lebanon Mayor Robert L. Spalding removing first shovel of dirt, July 21, 1941. (Left to right) L.W. Phillips, Street Superintendent; J.H. Walker, WPA Foreman; D.V. Terrell, Jr., Resident Engineer; R.L. Weatherford, County Judge; F.L. Chelf, County Attorney; L.T. Shepherd, WPA Superintendent; R.L. Spalding, Mayor., [n.d.] - [n.d.]
Ft. Knox
Outside of the renovated Post Chapel., [n.d.] - [n.d.]
Interior of the WPA renovated Post Chapel showing balconey., [n.d.] - [n.d.]
Interior of the WPA renovated Post Chapel showing altar., [n.d.] - [n.d.]
Swimming pool at the Officers' Club, December 13, 1939., [n.d.] - [n.d.]
Non-Commissioned Officers' Club, May 18, 1939., [n.d.] - [n.d.]
New Officers' Club, December 13, 1939., [n.d.] - [n.d.]
Underpass under construction at 1st Avenue and Dixie, May 18, 1939., [n.d.] - [n.d.]
Completed underpass at 1st Avenue and Dixie, December 13, 1939., [n.d.] - [n.d.]
Completed underpass at 1st Avenue and Dixie, December 13, 1939., [n.d.] - [n.d.]
Brigadier General Daniel VanVoorhis and George H. Goodman standing in Godman Field, February 8, 1938., [n.d.] - [n.d.]
Brigadier General Daniel VanVoorhis points out improvements made by the WPA to George H. Goodman (State WPA Administrator), and Mr. Shaw (District Director) on the old barracks, February 8, 1938., [n.d.] - [n.d.]
George H. Goodman and General Adna R. Chaffee emerging from new Air Corps barracks, May 18, 1939., [n.d.] - [n.d.]
Brigadier General Daniel VanVoorhis and George H. Goodman at Godman Field, February 8, 1938., [n.d.] - [n.d.]
Officers' Quarters remodeled by the WPA., [n.d.] - [n.d.]
Non-Commissioned Officers' Quarters remodeled by WPA., [n.d.] - [n.d.]
Non-Commissioned Officers' Quarters remodeled by WPA., [n.d.] - [n.d.]
Non-Commissioned Officers' Quarters remodeled by WPA., [n.d.] - [n.d.]
Armored Force School building constructed by the WPA., [n.d.] - [n.d.]
Armored Force School building constructed by the WPA., [n.d.] - [n.d.]
Armored Force School Headquarters building constructed by the WPA., [n.d.] - [n.d.]
Gasoline filling station constructed by the WPA., [n.d.] - [n.d.]
Communications Building constructed by the WPA., [n.d.] - [n.d.]
Construction of curbs, gutters and streets by the WPA., [n.d.] - [n.d.]
Completed permanent WPA camp at Ft. Knox constructed by the WPA., [n.d.] - [n.d.]
6th Infantry Headquarters constructed by the WPA., [n.d.] - [n.d.]
Concrete block building constructed by the WPA., [n.d.] - [n.d.]
Quartermaster Division cabinet shop constructed by the WPA., [n.d.] - [n.d.]
New Quartermaster Division Headquarters constructed by the WPA., [n.d.] - [n.d.]
A portion of 21 Quartermaster Division warehouses constructed by the WPA., [n.d.] - [n.d.]
General
Man wearing safety equipment including gas mask and hard hat, 1941., [n.d.] - [n.d.]
Administration
WPA State Headquarters on 4th Floor, Gibbs-Inman Building at 9th and Broadway in Louisville, KY., [n.d.] - [n.d.]
Eleanor Roosevelt and State WPA Administrator George H. Goodman entering Paul Dunbar Colored School at 9th and Magazine, Louisville, KY., [n.d.] - [n.d.]
State WPA Administrator George H. Goodman and Dr. Eduard Lindeman, Otter Creek, Hardin County, October 14, 1938., [n.d.] - [n.d.]
WPA National Defense Broadcast over Columbia Broadcasting System, from Radio Station WJSV in Washington, D.C., 9:15 to 9:30 p.m. EST, August 28, 1940. (Left to right): F.H. Dryden, Regional Director #3, Baltimore, Maryland; H.E. Smith, Regional Director #9, San Francisco, California; Howard O. Hunter, Deputy Commissioner, Washington, D.C.; and Judge Robert P. Patterson, Assistant Secretary of War, Washington, D.C., [n.d.] - [n.d.]
Conference of Regional Directors and State Administrators, Chicago, Illinois, July 2-3, 1941., [n.d.] - [n.d.]
District Directors, June 10, 1936 to July 1, 1937. (Left to right): Jesse O. Creech, J.B. Boddie, P.M. Brooks, George H. Goodman, Arthur Gamble, George F. Shaw, Ernest Rowe., [n.d.] - [n.d.]
Brucker Miller (left), Louisville District Manager, and Bill Burton, June, 1941., [n.d.] - [n.d.]
Mrs. Florence S. Kerr, Assistant Commissioner arriving to address Kentucky Sponsors of Projects and interested laymen with the Community Service Project Section, February 8, 1940., [n.d.] - [n.d.]
Mrs. Blanche M. Ralston, Regional Director and Mrs. Florence S. Kerr, Assistant Commissioner Community Service Project Section, February 8, 1940 at the Brown Hotel, Louisville, KY., [n.d.] - [n.d.]
February 8, 1940 Luncheon in honor of Mrs. Florence S. Kerr. Seated at the table, from left to right: Colonel Harry S. Barry, Tennessee State Administrator; Miss Elizabeth Fullerton, State Director Community Service Projects; Malcolm J. Miller, Regional Director, Atlanta, Georgia; Mrs. Florence S. Kerr, Assistant Commissioner, Washington, D.C.; George H. Goodman, Kentucky State Administrator; Mrs. Blanche M. Ralston, Regional Director of Community Service Projects, Atlanta, Georgia., [n.d.] - [n.d.]
Matthew Henchey, Director, Jefferson County Welfare, Andrew Broaddus, Chairman, Board of Alderman, George H. Goodman, State WPA Administrator, Mrs. Blanche M. Ralston, Professional and Service Regional Director, Charles J. Rieger, Acting Director of Welfare, inspecting Shoe Repair Project, May 22, 1940., [n.d.] - [n.d.]
These are the members of the party of Federal Office making a flying inspection trip of airports throughout the country built or improved by the WPA. The photograph was taken just before their departure from the Washington, D.C. airport. Left to right: Gill Robb Wilson, President of the National Association of State Aviation officials; W. Sumpter Smith, aeronautical engineer of the WPA; Corrington Gill, Assistant Administrator of the WPA; Major Lester D. Gardner, Secretary of the Institute of Aeronautical Sciences; Major A.B. McMullen, Chief of the Airport Section of the Bureau of Air Commerce; Fred L. Smith, Executive Vice President of the National Aeronautical Association; and Major Lotha Smith of the War Department. This group stopped in Louisville, KY on November 4, 1937., [n.d.] - [n.d.]
Administrators' Meeting at the Stevens Hotel, Chicago, Illinois, July 8-9, 1942., [n.d.] - [n.d.]
Boyd County
Fayette County
Architectural Drawing for Lexington Airport by WPA., [n.d.] - [n.d.]
Tractors plowing ground for Lexington Airport., 1941/7/21 - [n.d.]
Earth mover equipment in operation by WPA at Lexington Airport construction site., 1941/7/21 - [n.d.]
Ground being prepared by WPA equipment for Lexington Airport construction., 1941/7/21 - [n.d.]
Earth moving equipment in operation by WPA at Lexington Airport construction site., 1941/7/21 - [n.d.]
Ground being prepared by WPA equipment for Lexington Airport construction., 1941/7/21 - [n.d.]
Earth mover equipment in operation by WPA at Lexington Airport construction site., 1941/7/21 - [n.d.]
Earth moving equipment in operation by WPA at Lexington Airport construction site., 1941/7/21 - [n.d.]
Ground being prepared by WPA equipment for Lexington Airport construction., 1941/7/21 - [n.d.]
Lexington Airport construction site., 1941/7/21 - [n.d.]
Lexington Airport construction site., 1941/7/21 - [n.d.]
Lexington Airport construction site., 1941/7/21 - [n.d.]
Lexington Airport construction site., 1941/7/21 - [n.d.]
Lexington Airport construction site., 1941/7/21 - [n.d.]
Ft. Knox
Interior of Post Chapel renovated by the WPA and used by both Protestant and Catholic services on the post., [n.d.] - [n.d.]
Shooting ledge at rock quarry operated by WPA at Ft. Knox, May 18, 1939., [n.d.] - [n.d.]
Runways under construction at Flying Field inspection, May 18, 1939. General Adna R. Chaffee is 3rd from right, Colonel W.A. Danielson is 3rd from left. Also present: E.A. Marye, R.J. Turrell, F.E. Lackey, Jr., McDonald Darnell., [n.d.] - [n.d.]
George H. Goodman and General Adna R. Chaffee emerging from new Air Corps barracks, May 18, 1939., [n.d.] - [n.d.]
George H. Goodman, Colonel W.A. Danielson, General Adna R. Chaffee, and inspecting party emerging from Field Officers' Building under construction, May 18, 1939., [n.d.] - [n.d.]
Bridgadier General Daniel VanVoorhis points out the modern improvements made by the WPA to George H. Goodman (State WPA Administrator) and Mr. Shaw (District Director) on the old barracks at Ft. Knox, February 8, 1938., [n.d.] - [n.d.]
Rock quarry at Ft. Knox operated by the WPA which produces 1200 tons of crushed rock daily. Rock from this quarry is used in all types of construction at the fort., [n.d.] - [n.d.]
Rock quarry at Ft. Knox operated by the WPA which produces 1200 tons of crushed stone daily. Shown here are men breaking up stone with sledge hammers and loading stone with shovels., [n.d.] - [n.d.]
Rock quarry at Ft. Knox operated by the WPA. Shown here is the rock face of the quarry., [n.d.] - [n.d.]
Conveyor belt taking rock out of quarry operated by the WPA at Ft. Knox to loading stage., [n.d.] - [n.d.]
Post restaurant and bus terminal at Ft. Knox now being completed by the WPA., [n.d.] - [n.d.]
Swimming pool built by the WPA at Ft. Knox., [n.d.] - [n.d.]
Swimming pool and filter house at Commissioned Officers' Club., [n.d.] - [n.d.]
Tennis courts built by the WPA in conjunction with Commissioned Officers' Club., [n.d.] - [n.d.]
Non-Commissioned Officers' Club erected by the WPA. Logs and other materials for the construction of this building were obtained entirely from the Ft. Knox reservation by the WPA., [n.d.] - [n.d.]
Swimming pool and filter house erected by the WPA in conjunction with the Non-Commissioned Officers' Club., [n.d.] - [n.d.]
Interior of the Non-Commissioned Officers' Club erected by the WPA at Ft. Knox., [n.d.] - [n.d.]
Bar in the basement of the Non-Commissioned Officers' Club. Note the unusual stone construction of the bar and bar rail., [n.d.] - [n.d.]
Communications building erected by the WPA. This building houses the camp telephone switchboard, Western Union cables, and a wireless station., [n.d.] - [n.d.]
Nine-hole golf course built by the WPA, which is now being increased to an eighteen-hole course by the WPA., [n.d.] - [n.d.]
A portion of the officers' quarters, showing streets, sidewalks, curb and gutters installed by the WPA, together with the landscaping. Beneath the streets the WPA installed sanitary and storm sewers, electrical and water mains. The WPA has completed more than five miles of this work with additional work under construction., [n.d.] - [n.d.]
Garages in rear of nurses' quarters at Ft. Knox built by the WPA, which will accommodate ten cars., [n.d.] - [n.d.]
"Cloverleaf" underpass at Ft. Knox built by the WPA to facilitate traffic. All traffic moves to the right under the cloverleaf system., [n.d.] - [n.d.]
"Cloverleaf" underpass at Ft. Knox built by the WPA to facilitate traffic. All traffic moves to the right under the cloverleaf system., [n.d.] - [n.d.]
Aerial view of Godman Field at Ft. Knox showing three miles of runways completed by the WPA and three additional miles under construction. In building this airport, the WPA has already moved 1 million cubic yards of dirt and has yet to move 500,000 cubic yards., [n.d.] - [n.d.]
Le Torneau scrapers of 16 yard capacity. The WPA now has nine of these machines operating at Godman Field. They already have moved 1 million cubic yards of dirt and are moving an additional 500,000 cubic yards to bring the airport to grade., [n.d.] - [n.d.]
The WPA operates an Adams motor grader to make the final grade for the runways at Godman Field at Ft. Knox., [n.d.] - [n.d.]
WPA workers installing 6,000 feet of trench drain at Godman Field at Ft. Knox., [n.d.] - [n.d.]
Motor shed to house armored cars, tanks and trucks. WPA has built sheds at Ft. Knox to house 1,000 cars., [n.d.] - [n.d.]
Motor shed to house armored cars, tanks and trucks. WPA has built sheds at Ft. Knox to house 1,000 cars., [n.d.] - [n.d.]
Concrete tent floors, 16x16, built by the WPA for use by National Guard troops when they are encamped there. Two thousand such floors have been completed and 400 more are under construction. Each floor has its own convenient electrical outlet. A tent pitched over one of these floors houses eight men., [n.d.] - [n.d.]
Signs are imperative for purposes of direction in any army camp. WPA workers pain them by the thousands at Ft. Knox. Here we see Howard Ladd, WPA worker, making a headquarters co. sign., [n.d.] - [n.d.]
Concrete block mess halls built by WPA in National Guard training centers at Ft. Knox., [n.d.] - [n.d.]
Concrete block latrines in National Guard training center at Ft. Knox., [n.d.] - [n.d.]
Close up of concrete block building in National Guard training camp., [n.d.] - [n.d.]
Old World War One barracks at Ft. Knox are rapidly being rehabilitated by WPA to meet the present emergency. The building shown in the picture will be used as temporary headquarters of the First Armored Division. Sixty such buildings are now undergoing such repairs by the WPA., [n.d.] - [n.d.]
Railroad lines as a means of transportation are of first importance at Ft. Knox. WPA has built approximately five miles of spurs and sidings with additional facilities under construction., [n.d.] - [n.d.]
Tent camp housing 2,000 WPA workers at Ft. Knox. This camp now is being replaced by one of permanent construction. The new camp will contain 24 two-story barracks, eight mess halls, eight storerooms, eight recreational rooms. Each barracks will house a minimum of 65 men. Each mess hall will accomodate 170 men at a time., [n.d.] - [n.d.]
Aerial view (oblique) of seven mess halls and seven latrines, which comprise a portion of the National Guard training headquarters at Ft. Knox directed by the WPA. In the upper left corner of this view may be seen concrete tent floors erected by the WPA. In the upper and lower right hand corners may be seen motor sheds erected by the WPA., [n.d.] - [n.d.]
Non-Commissioned Officers' quarters now under construction at Ft. Knox. The WPA is building fifty similar buildings simultaneously., [n.d.] - [n.d.]
Non-Commissioned Officers' quarters now under construction at Ft. Knox. The WPA is building fifty similar buildings simultaneously., [n.d.] - [n.d.]
Central Heating Plant built by the WPA to heat a section of the Quartermaster Corps warehouses., [n.d.] - [n.d.]
Commissioned Officers' Club erected by the WPA., [n.d.] - [n.d.]
Interior of Commissioned Officers' Club. View looking toward bar., [n.d.] - [n.d.]
Interior view of Commissioned Officers' Club. View looking from bar., [n.d.] - [n.d.]
Grayson County
Harlan County
Jefferson County
Eastern Parkway resurfaced by the WPA, Louisville, KY, 1938., [n.d.] - [n.d.]
University of Louisville School of Law formal opening, November 29, 1939., [n.d.] - [n.d.]
Scene from Blossom Time, 1938., [n.d.] - [n.d.]
Clothing worn by this child made at the Training Work Center, Dunbar Colored School, 9th and Magazine, Louisville, KY. Picture taken at "Open House Day," February 19, 1936., [n.d.] - [n.d.]
Federal officials inspecting Louisville Airport on November 4, 1937. Far left is Congressman Emmett O'Neal, second from left is Louisville Mayor Joe D. Scholtz, third from left (front row) is George H. Goodman, fourth from left (front row) is Corrington Gill, third from left (back row) Judge Ben F. Ewing, fifth from left (front row) is Major A.B. McMullen, far right (back row) is W. Sumpter Smith, far right (front row) is Neville Miller., [n.d.] - [n.d.]
Federal officials inspecting Louisville airport, November 4, 1937. (Left to right): W. Sumpter Smith, Major A.B. McMullen, George H. Goodman, Corrington Gill, Neville Miller, and Albert H. Near., [n.d.] - [n.d.]
Johnson County
Kenton County
McCracken County
Photograph of Architect's drawing of the Paducah Courthouse., [n.d.] - [n.d.]
Montgomery County
Morgan County
Eleanor Roosevelt arriving for the dedication of West Liberty High School, May 24, 1937., [n.d.] - [n.d.]
Corsage being pinned on Eleanor Roosevelt at the dedication of West Liberty High School, May 24, 1937., [n.d.] - [n.d.]
Eleanor Roosevelt at the dedication of West Liberty High School, May 24, 1937., [n.d.] - [n.d.]
Senator Alben W. Barkley at the dedication of West Liberty High School, May 24, 1937., [n.d.] - [n.d.]
Arthur Gamble, District Director, speaking at the dedication of West Liberty High School, May 24, 1937., [n.d.] - [n.d.]
Eleanor Roosevelt at podium at West Liberty High School dedication, May 24, 1937., [n.d.] - [n.d.]
Eleanor Roosevelt visiting the Packhorse Library in West Liberty, KY, May 24, 1937. Mrs. Roosevelt chats with a Pack Horse Librarian of the Kentucky Mountains at the dedication exercises of the West Liberty High School., [n.d.] - [n.d.]
Eleanor Roosevelt visiting the Packhorse Library in West Liberty, KY, May 24, 1937., [n.d.] - [n.d.]
First Annual Report of Second District
Adair County
Project # 2-1-604-2804 City of Columbia Sewers. View of project showing men digging a ditch for sewer., 1935 - 1936
Project #2-1-951-1248 View of unidentified street, 1935 - 1936
Project #2-1-1016-2605 WPA workers building foundation, 1935 - 1936
Project #2-1-278-873 WPA workers on road construction detail, 1935 - 1936
Project #2-1-676-1940 Addition to Columbia High School construction, 1935 - 1936
Project #2-1-58-73 WPA workers cutting through rock on Sparksville-Weed Road, March 6, 1936, 1935 - 1936
Project #2-1-252-768 Eunice-Casey County Line Road construction, 1935 - 1936
Project #2-1-604-2804-C2 WPA workers on construction project, 1935 - 1936
Anderson County
Project #2-3-692-787 Western High School Gymnasium interior construction, 1935 - 1936
Project #2-3-692-787 Western High School Gymnasium at Johnsonville showing exterior view, 1935 - 1936
Project #2-3-361-852 Broadway Street, City of Lawrencburg, 1935 - 1936
Project #2-3-924-2768 West Woodford Street in City of Lawrenceburg, 1935 - 1936
Project #2-3-260-925 Bridge construction, 1935 - 1936
Project #2-3-313-923 WPA workers loading rock., 1935 - 1936
Boyle County
Project #2-11-82-415 City of Danville street repair, 1935 - 1936
Project #2-11-970-2636 Road construction showing road shovel loading dump truck, 1935 - 1936
Project #2-11-968-1249 WPA workers laying brick at Boyle County Courthouse repair and addition project, 1935 - 1936
Project #2-11-970-2636 Bridge construction, 1935 - 1936
Project #2-11-970-2636 Road improvement project, 1935 - 1936
Project #2-11-1265-2720 WPA workers patching holes on Danville city street, 1935 - 1936
Casey County
Project #2-23-145-391 Clementsville-Steel Knob Road construction, 1935 - 1936
Project #2-23-1005-1401 Liberty, KY sidewalk project, 1935 - 1936
Project #2-23-359-2512 Liberty, KY Gymnasium construction project, 1935 - 1936
Project #2-23-194-2228 WPA workers digging on road construction project, 1935 - 1936
Project #2-23-1005-1401 WPA workers loading truck for Liberty, KY sidewalk construction project, 1935 - 1936
Project #2-23-792-2230 WPA workers on road construction project, 1935 - 1936
Clinton County
Project #2-27-146-776 Albany to Shipley Road drainage project, 1935 - 1936
Project #2-27-147-761 Cumberland City Road. WPA workers pulling carts up road., 1935 - 1936
Project #2-27-843-675 Reconstruction of an Albany, KY street., 1935 - 1936
Project #2-27-779-1208 WPA workers dismantling iron bridge over Spring Creek., 1935 - 1936
Cumberland County
Project #2-29-926-1206 Marrowbone High School Gymnasium and Classroom Annex construction, 1935 - 1936
Project #2-29-819-1423 Road project, 1935 - 1936
Project #2-29-999-1415 Burkesville curb, gutter, sidewalk, and street construction project., 1935 - 1936
Project #2-29-819-1423 Stone construction, 1935 - 1936
Garrard County
Project #2-40-173-1237 Man walking on a road., 1935 - 1936
Project #2-40-787-2402 WPA workers on road construction project, 1935 - 1936
Project #2-40-525-2806-C3 WPA workers surfacing Buena Vista Road, 1935 - 1936
Project #2-40-202-762 County-wide road reconstruction and repair project., 1935 - 1936
Project #2-40-76-1562 Women sewing, 1935 - 1936
Project #2-40-6-11 County Quarry, [n.d.] - [n.d.]
Green County
Project #2-44-227-2206 Greensburg Water Works. Man using jackhammer., 1935 - 1936
Project #2-44-45-107 Man on bulldozer on Brush Creek-Pleasant Valley Road project., 1935 - 1936
Project #2-44-57-74 Retaining wall on Jim Ward Road, 1935 - 1936
Project #2-44-149-1710 WPA workers on Exie-Howard's School House Road, 1935 - 1936
Larue County
Project #2-62-222-779 Drainage project, 1935 - 1936
Project #2-62-474-2807-C2 WPA workers on road project., 1935 - 1936
Project #2-62-474-2807-C3 WPA workers removing tree stump., [n.d.] - [n.d.]
Project #2-62-220-779 Magnolia Upton Road construction project, 1935 - 1936
Project #2-62-803-2367 View of a road., [n.d.] - [n.d.]
Project #2-62-803-2367 WPA workers on road construction project, 1935 - 1936
Lincoln County
Project #2-69-356-1593 Men working with rocks., [n.d.] - [n.d.]
Project #2-69-866-2516 Waynesburg Gymnasium interior construction, [n.d.] - [n.d.]
Project #2-69-258-1711 View of Crab Orchard-Broughtontown Road showing rock pile, bulldozer and rockcrusher., [n.d.] - [n.d.]
Project #2-69-866-2516 Waynesburg Gymnasium showing wall construction, [n.d.] - [n.d.]
Project #2-69-973-2788 Stanford Industrial Arts Building construction, 1935 - 1936
Project #2-69-97-401 View of men working in rock quarry., [n.d.] - [n.d.]
Project #2-69-344-2189 Crab Orchard Gymnasium construction (exterior view), [n.d.] - [n.d.]
McCreary County
Project #2-74-932-1404 Stearns Community Park building under construction., [n.d.] - [n.d.]
Project #2-74-656-2746-C2 Men grading Mt. Pleasant-Strunk Road, [n.d.] - [n.d.]
Project #2-74-349-1756 Railroad car being loaded., [n.d.] - [n.d.]
Project #2-74-656-2746-C2 Dump truck dumping gravel on Mt. Pleasant-Strunk Road project., [n.d.] - [n.d.]
Project #2-74-669-2831-C5 View of unidentified school., [n.d.] - [n.d.]
Project #2-74-383-2279 Man working on stone masonry, [n.d.] - [n.d.]
Marion County
Project #2-78-584-1519 Bradfordsville High School construction project, [n.d.] - [n.d.]
Project #2-78-373-1266 Men working by a creek., [n.d.] - [n.d.]
Project #2-78-38-59 City of Lebanon, KY storm sewer project., [n.d.] - [n.d.]
Project #2-78-574-2747-C4 View of county road, [n.d.] - [n.d.]
Project #2-78-574-2747-C4 WPA worker working on county road, [n.d.] - [n.d.]
Project #2-78-584-1519 Bradfordsville High School construction showing stone walls., [n.d.] - [n.d.]
Mercer County
Project #2-84-1003-2583 Men working by a river, March 12, 1936, 1936
Project #2-84-51-62 WPA workers repairing blacktop roads., [n.d.] - [n.d.]
Project #2-84-302-784 Forsythe Lane Road construction., [n.d.] - [n.d.]
Project #2-84-673-2748-C2 Construction of bridge over Salt River on Bohon Road., [n.d.] - [n.d.]
Project #2-84-673-2748-C4 WPA workers moving rocks at County Quarry., [n.d.] - [n.d.]
Project #2-84-673-2748-C4 County Quarry construction, [n.d.] - [n.d.]
Project #2-84-673-2748-C1 Oakland Lane road construction., [n.d.] - [n.d.]
Project #2-84-1261-2619 WPA worker on road construction project., [n.d.] - [n.d.]
Project #2-84-55-48 Construction of bridge over Salt River on Forsythe Mill Road., [n.d.] - [n.d.]
Metcalfe County
Project #2-85-63-411 Beechville Road construction project., [n.d.] - [n.d.]
Project #2-85-100-387 Edmonton High School Gymnasium construction., [n.d.] - [n.d.]
Project #2-85-199-1129 WPA worker grading road., [n.d.] - [n.d.]
Project #2-85-199-543 Cave Ridge-Echo Road, [n.d.] - [n.d.]
Monroe County
Project #2-86-198-789 Gamaliel High School under construction., [n.d.] - [n.d.]
Project #2-86-198-789 Gamaliel High School under construction., [n.d.] - [n.d.]
Project #2-86-955-1697 City of Tompkinsville Office Building under construction., [n.d.] - [n.d.]
Project #2-86-532-2810-C3 View of county road., [n.d.] - [n.d.]
Project #2-86-532-2810-C2 County road stone masonry., [n.d.] - [n.d.]
Nelson County
Project #2-90-279-2315 WPA workers on road construction project., [n.d.] - [n.d.]
Project #2-90-811-1059 City of Bardstown street., [n.d.] - [n.d.]
Project #2-90-315-2234 WPA workers digging ditch., [n.d.] - [n.d.]
Project #2-90-315-2234 View of bulldozer and men working on road., [n.d.] - [n.d.]
Project #2-90-26-119 Boston-Bellwood Road construction., [n.d.] - [n.d.]
Pulaski County
Project #2-100-254-694 Pisgah-State Branch Road, [n.d.] - [n.d.]
Project #2-100-245-766 Jacksburg Street curb construction in City of Luretha, KY., [n.d.] - [n.d.]
Project #2-100-216-1577 WPA workers in County Quarry., [n.d.] - [n.d.]
Project #2-100-1055-2507 Installation of toilet, septic tank and water system at Eubanks High School., [n.d.] - [n.d.]
Project #2-100-245-766 Jacksburg Street in City of Luretha, KY., [n.d.] - [n.d.]
Project #2-100-991-1407 View of bridge under repair., [n.d.] - [n.d.]
Project #2-100-67-412 WPA workers by tractor on Oil Center Road., [n.d.] - [n.d.]
Project #2-100-22-118 Grading Burnetti-Naomi Road., [n.d.] - [n.d.]
Project #2-100-514-2750-C10 Parkers Mill Road construction project., [n.d.] - [n.d.]
Russell County
Project #2-104-61-410 Jamestown-Greasy Creek Road construction project., [n.d.] - [n.d.]
Project #2-104-204-554 Crocus-Creelsboro Road construction project, [n.d.] - [n.d.]
Project #2-104-70-783 Small bridge on Rowena-Kendall Road, [n.d.] - [n.d.]
Project #2-104-71-778 Stone masonry on Font Hill-Wolf Creek Road, [n.d.] - [n.d.]
Project #2-104-33-95 Sewellton Road project, [n.d.] - [n.d.]
Taylor County
Project #2-109-28-98 Bass-Merrimac Road, [n.d.] - [n.d.]
Project #2-109-28-98 Saloma Road ditch and stone work., [n.d.] - [n.d.]
Project #2-109-1056-1965 Campbellsville Stadium construction project, [n.d.] - [n.d.]
Project #2-109-1056-1965 Campbellsville Stadium wall construction., [n.d.] - [n.d.]
Washington County
Project #2-115-943-1115 Mackville Gymnasium (exterior view)., [n.d.] - [n.d.]
Project #2-115-858-1414 Culvert construction, [n.d.] - [n.d.]
Project #2-115-330-750 Construction of Walnut Street Bridge., [n.d.] - [n.d.]
Project #2-115-805-1277 WPA workers on drainage project., [n.d.] - [n.d.]
Project #2-115-858-1414 Surfacing of road., [n.d.] - [n.d.]
Project #2-115-858-1414 Culvert construction, [n.d.] - [n.d.]
Wayne County
Project #2-116-688-2365 Monticello City Hall and Fire Station construction., [n.d.] - [n.d.]
Project #2-116-685-2751-C4 Bridge construction across Kennedy Creek., [n.d.] - [n.d.]
Project #2-116-685-2751-C3 #90 to Frazier Road., [n.d.] - [n.d.]
Project #2-116-949-775 Construction of basement under the Mill Springs and Number One schools., [n.d.] - [n.d.]
Project #2-116-685-2751-C1 Box culvert on Shearer Valley Road, [n.d.] - [n.d.]
Project #2-116-860-1484 Road construction., [n.d.] - [n.d.]
Project #2-116-105-389 WPA workers installing pipe at Lock No. 21 Road, [n.d.] - [n.d.]
Project #2-116-106-390 Grading No Nox Inn Road., [n.d.] - [n.d.]
Project #2-116-43-102 View of Murl Road., [n.d.] - [n.d.]
Project #2-116-192-1483 WPA workers removing rocks and burning tree stumps., [n.d.] - [n.d.]
Semi-Monthly Narrative Reports
Caldwell County
Project #486 District 1: Construction of cement bound macadam streets, 27' wide and extending for a total distance of approximately 1380' in the City of Princeton, KY. Crusher in operation, producing limestone for use in constructing new cement bound macadam streets at Princeton. Crusher furnished by City of Princeton. Photographed December 12, 1935., December, 1935 - [n.d.]
Carroll County
Project #91 District 3: Project provides for the laying of approximately 28,000 linear feet of sanitary sewer in the City of Carrollton. Open trench showing shoring in place for protection of workers. Photographed November 26, 1935., December, 1935 - [n.d.]
Christian County
Project #3 District 1: Grading and draining Tobacco Road, beginning at city limits of Pembroke and extending in a southerly direction approximately 5.5 miles to village of St. Elmo. Project consists of moving about 43,107 cubic yards of earth and rock and constructing about 508 cubic yards of concrete. Construction of a reinforced concrete box culvert. View shows reinforcing steel in place, preliminary to form work for concrete. Photographed November 26, 1935., December, 1935 - [n.d.]
Fayette County
Project #3-34-6-56 District 3: Excavating trench and laying 24" storm sewer on Bell Court, Lexington, KY. This project provides a much needed addition to the city storm sewerage system and includes the laying of 15", 18", and 24" sewer lines with manholes, inlets etc. The City of Lexington, the sponsor, is contributing approximately 65" of the total cost., September, 1935 - [n.d.]
Greenup County
Project #89 District 5: Construction of a mountain "farm to market" road. To grade, drain, and surface with native stone a 3 mile section of road between the mouth of Wingo Creek and the Lewis County line. This project, when completed, will provide ingress and egress to a heretofore isolated community. A section of road showing side hill out of soft shale., October, 1935 - [n.d.]
Project #89 District 5: Construction of a mountain "farm to market" road. To grade, drain, and surface with native stone a 3 mile section of road between the mouth of Wingo Creek and the Lewis County line. This project, when completed, will provide ingress and egress to a heretofore isolated community. Workmen excavating side hill cut and casting fill to form part of completed roadway., October, 1935 - [n.d.]
Harlan County
Project #30 District 4: Construction of a new City Hall at Cumberland, Harlan County, KY. This project was partly completed under E.R.A. Native sandstone used in this building is quarried on the same project from a site about .5 mile west of the city. View of the City Hall building showing workmen facing stone before laying., October, 1935 - [n.d.]
Project #30 District 4: Construction of a new City Hall at Cumberland, Harlan County, KY. This project was partly completed under E.R.A. Native sandstone used in this building is quarried on the same project from a site about .5 mile west of the city. View of the quarry from which stone is furnished for building the City Hall. One of the few locations where the stone is uniformly pink in color., October, 1935 - [n.d.]
Henry County
Project #343 District 3: Resurfacing and reconstruction of Point Pleasant-Franklinton Road from Highway No. 37 to Franklinton via Point Pleasant. This road, formerly having a traffic bound macadam surface, is being scarified and reshaped, with 3" topping of metal topping added. Its entire length of 8.2 miles is being ditched and drained. Spreading crushed limestone base on typical farm-to-market road. Photographed December 11, 1935., December, 1935 - [n.d.]
Jefferson County
Project #6-56-8-50 District 6: Grading field and setting forms for concrete retaining wall on the downtown recreational center at Jackson and Walnut Streets, Louisville, KY. Other work included in this project consists of building new shelter houses, volleyball and tennis courts, softball diamond, bleachers, horseshoe pitch boxes, installation of drainage system and surfacing the entire plot with bituminous macadam. Shrubs and trees will be set out, and the entire grounds beautified. The Dept. of Public Welfare, City of Louisville, the sponsors, are contributing 55" of the total project cost., September, 1935 - [n.d.]
Project #249 District 6: Reconstruction of the Mt. Washington Road. This is one of the several projects on Echo Trail, a scenic highway which circles the outer edge of the county. This project involves the widening of the present 10' bituminous surface to 16'. Additional stone base will be placed and the old surface scarified before surfacing with 75 pounds per square yard treatment. Workmen lining old pavement and excavating for extra stone base., October, 1935 - [n.d.]
Project #249 District 6: Reconstruction of the Mt. Washington Road. This is one of the several projects on Echo Trail, a scenic highway which circles the outer edge of the county. This project involves the widening of the present 10' bituminous surface to 16'. Additional stone base will be placed and the old surface scarified before surfacing with 75 pounds per square yard treatment. Another view of same road. Excavating trench to receive base stone for widening., October, 1935 - [n.d.]
Project #110 District 6: Construction of Boat Harbor, Louisville, KY on Ohio River. Project will include floating docks, slips, motor posts and a comfort station. It will be a great improvement to the community as there are no facilities of this nature at present in or around Louisville and pleasure craft are scattered up and down the Ohio River. View, near the water's edge shortly after the project was started, taken September 20, 1935., October, 1935 - [n.d.]
Project #110 District 6: Additional views of Boat Harbor project on Ohio River at Louisville. View of same site taken one month later, October 23, 1935., October, 1935 - [n.d.]
Project #110 District 6: Additional views of Boat Harbor project on Ohio River at Louisville. View of site of project looking northeast. Picture taken September 20, 1935., October, 1935 - [n.d.]
Project #110 District 6: Additional views of Boat Harbor project on Ohio River at Louisville. View looking northeast one month later on a rainy day. Workers forced to take refuge under shelter shed. Skip trucks may be seen nearby. Head of Tow Head Island in upper left of picture. Taken October 23, 1935., October, 1935 - [n.d.]
Project #248 District 6: Completion of Mitchell Hill Road, widening of grade and resurfacing. Base to be widened from 10 feet to 16 feet. View showing banks sloped and grade completed to receive surfacing. Picture taken October 30, 1935., October, 1935 - [n.d.]
Project #248 District 6: Completion of Mitchell Hill Road, widening of grade and resurfacing. Base to be widened from 10 feet to 16 feet. Finishing grade and sloping banks preparatory to surfacing. Picture taken October 30, 1935., [n.d.] - [n.d.]
Project #50 District 6: Construction of a shelter house and other improvements to a playground at Jackson and Walnut streets, Louisville, KY. Work included grading lot, building new shelter house and installation of volleyball and ring tennis courts, softball diamonds, bleachers etc. Completion picture of the playground, showing new shelter house and other improvements made. Bleachers are at upper right of picture. Photographed November 14, 1935., November, 1935 - [n.d.]
Project #897 District 6: Construction of a 20-foot cement-bound macadam re-surface on the lower River Road, Shawnee Park, Louisville, KY, which is a scenic highway along the Ohio River. Preparation of road bed on River Road, at Shawnee Park. The Ohio River may be seen on extreme left side of picture. Photographed November 15, 1935., November, 1935 - [n.d.]
Project #205 District 6: Training and sewing centers. Women employed and trained to make wearing apparel and other articles. They are also taught the best methods of child care and household management. Completed garments are turned over to the sponsor for distribution. Louisville Training Work Center on the second floor of the Louisville Hotel. Photographed November 8, 1935., November, 1935 - [n.d.]
Project #205 District 6: Training and sewing centers. Women employed and trained to make wearing apparel and other articles. They are also taught the best methods of child care and household management. Completed garments are turned over to the sponsor for distribution. A Negro sewing project in the City of Louisville. Photographed November 15, 1935., November, 1935 - [n.d.]
Project #716 District 6: Project No. 716 is a project where women have been assigned to mend, repair and bind books and magazines of the Louisville Free Public Library and its nine branch libraries. About 28,000 books and magazines, worn from use, would otherwise be out of circulation. Women repairing books of the Louisville Free Public Library. Photographed November 15, 1935., November, 1935 - [n.d.]
Project #275 District 6: Project No. 275 is a Louisville Sewing Center, where women are taught sewing, patching, household management and childcare. A Louisville sewing center project in operation. Photographed November 13, 1935., November, 1935 - [n.d.]
Project #674 District 6: No. 674 is a project providing for painting and renovating 55 structures in the Louisville Park System, including work on pavilions, shelter houses etc. Painting and renovating work in progress on the gymnasium at Phillips Lane and Crittenden Drive, Louisville, KY. Photographed November 15, 1935., November, 1935 - [n.d.]
Project #100 District 6: Project No. 100 is construction of sidewalks along driveways of the Louisville Park System. Constructing sidewalk on Algonquin Parkway., November, 1935 - [n.d.]
Project #1009 District 6: Topographic survey and mapping of 350 acres at Waverly Hills Sanitorium near Louisville. Field party making survey preliminary to map making. Photographed November 25, 1935., November, 1935 - [n.d.]
Project #120 District 6: Developing an area of 13 acres of land into a park at Cypress and Algonquin Parkway by installing a water system, a drainage system, lighting system, the building of a shelter house, wading pool, bleachers, walks and track. Also soil treatment, planting and fencing work to be done. Project sponsored by Board of Park Commissioners, Louisville, KY. Construction of shelter and clubhouse for the new playground. Photographed November 30, 1935., November, 1935 - [n.d.]
Project #481 District 6: Construction of the new Service Building for the University of Louisville, which will house offices, store and supply rooms, repair shops, and garage. Building will be L shaped, the main part two stories high, being 78' X 52' in dimension and the wing, one story high, measuring 75' X 26"7". It will have 13" brick walls and structural skeleton. Total cost is $18,889. Pouring foundations of Service Building, University of Louisville. Photographed November 25, 1935., November, 1935 - [n.d.]
Project #481 District 6: Construction of the New Service Building for the University of Louisville. View showing pouring foundations of Service Building, taken from a different angle. Photographed November 24, 1935., November, 1935 - [n.d.]
Project #275 District 6: Training Work Center at Shelby and Main streets, Louisville, where women are taught sewing, patching, household management, and child care. Finished articles are turned over to the project's sponsor for distribution to the needy. Two views of the project in operation shown below. Work-rooms, showing sewing machine section. Machines rented by WPA in use., November, 1935 - [n.d.]
Project #275 District 6: Training Work Center at Shelby and Main streets, Louisville, where women are taught sewing, patching, household management, and child care. Finished articles are turned over to the project's sponsor for distribution to the needy. Work-rooms, showing sewing machine section. Machines rented by WPA in use., November, 1935 - [n.d.]
Project #1293 District 6: Construction of sewers in Ward #8, City of Louisville. Excavation for installation of sanitary sewer, Taylor Blvd., between Peck and Henry streets. Photographed November 25, 1935, 1935
Project #1293 District 6: Construction of sewers in Ward #8, City of Louisville. Excavation for installation of sanitary sewer, Ashland and Livingston Avenues. Men now working at 6' level. Shoring will be used when further depth of trench is excavated. Photographed November 25, 1935, 1935
Project #717 District 6: Project includes construction of a new Service Building, excavation and landscaping old quarry,surfacing walks, installation of waterline and completion of three shelter houses on golf course, Seneca Park, Louisville. Seneca Park Caddy House, under construction, showing old foundation which is to be utilized in the new structure. Photographed November 8, 1935, November, 1935 - [n.d.]
Project #717 District 6: Project includes construction of a new Service Building, excavation and landscaping old quarry, surfacing walks, installation of waterline and completion of three shelter houses on golf course, Seneca Park, Louisville. Seneca Park Caddy House under construction, showing forms for new concrete built in connection with the old foundation. Photographed November 25, 1935., November, 1935 - [n.d.]
Project #205 District 6: Sewing room of colored Training Work Center, Louisville, KY. Photographed December 4, 1935., December, 1935 - [n.d.]
Project #1279 District 6: Project #1279 provides for a malarial survey, laboratory examination of relief workers, completing reports and statistical records and preparation of whooping cough vaccine. View of laboratory at State Board of Health, Louisville, KY. Photographed December 12, 1935., December, 1935 - [n.d.]
Project #1628 District 6: Project #1628 provides for making a permanent record of all diseases, same to be reported to the U.S. Public Health Service, Washington, D.C. Cross-indexing communicable diseases, State Board of Health, Louisville, KY., December, 1935 - [n.d.]
Project #110 District 6: Construction of a harbor for pleasure boats on the Ohio River at Louisville. Driving wooden piles, which will afford a parking arrangement for pleasure boats. Photographed December 9, 1935., December, 1935 - [n.d.]
Project #110 District 6: Construction of a harbor for pleasure boats on the Ohio River at Louisville. Evacuation of basin showing dike and Ohio River at left of picture. Photographed December 9, 1935., December, 1935 - [n.d.]
Project #1073 District 6: This project provides for the grading, draining and reconstructing of 1.35 miles of Mockingbird Valley Road near Louisville, KY., December, 1935 - [n.d.]
Project #1294 District 6: Construction of sewer in Nevada Avenue, Ward No. 4, City of Louisville. 2140 lineal feet of sewer to be laid. Open trench for sewer construction with sheeting and shoring in place. Nevada Avenue, east from Park Avenue. Photographed December 9, 1935., December, 1935 - [n.d.]
Project #1293 District 6: Construction of sewers in Ward No. 8, City of Louisville, KY. Back filling of trench after laying of sewer at Peck and Henry streets. Photographed December 12, 1935., December, 1935 - [n.d.]
Project #275 District 6: Training Work Center in the City of Louisville, KY, where women are taught sewing, patching, household management and child care. Tacking comforter., December, 1935 - [n.d.]
Project #275 District 6: Training Work Center in the City of Louisville, KY, where women are taught sewing, patching, household management and child care. Stitching comforter., December, 1935 - [n.d.]
Project #275 District 6: Training Work Center in the City of Louisville, KY, where women are taught sewing, patching, household management and child care. Wrapping comforters., December, 1935 - [n.d.]
Project #275 District 6: Training Work Center in the City of Louisville, KY, where women are taught sewing, patching, household management and child care. Checking garments., December, 1935 - [n.d.]
Knott County
Project #32 District 5: Construction of Yellow Creek School building, Sassafras, KY, one quarter mile up Yellow Creek from Sassafras Post Office. This project, a twelve-room building, is being constructed of native stone, quarried in Knott County. View of school building under construction taken October 10, 1935., October, 1935 - [n.d.]
Project #32 District 5: Construction of Yellow Creek School building, Sassafras, KY, one quarter mile up Yellow Creek from Sassafras Post Office. This project, a twelve-room building, is being constructed of native stone, quarried in Knott County. View of quarry from which native stone is obtained., October, 1935 - [n.d.]
Madison County
Project #85 District 4: Construction of concrete driveway at Eastern State Teachers' College, Richmond, KY. The work on this project includes 900 lineal feet of 6 inch concrete pavement 30 feet wide with 6 inch curbs, 827 lineal feet of 6 inch concrete pavement 26 feet wide with 6 inch curbs, 50 lineal feet of 7 inch concrete pavement 26 feet wide with 6 inch curbs. The present bituminous pavement will be removed and the salvaged material used for repairing other campus driveways. Preparing subgrade and setting forms for curb and one half roadway., October, 1935 - [n.d.]
Project #85 District 4: Construction of concrete driveway at Eastern State Teachers' College, Richmond, KY. Mixing concrete for construction of driveway., October, 1935 - [n.d.]
Project #85 District 4: Construction of concrete driveway at Eastern State Teachers' College, Richmond, KY. Placing and spreading concrete around dowel expansion joint., October, 1935 - [n.d.]
Project #85 District 4: Construction of concrete driveway at Eastern State Teachers' College, Richmond, KY. Floating one-half of finished slab to eliminate waves and irregularities prior to belting., October, 1935 - [n.d.]
Marshall County
Project #1-79-17-87 District 1, Branch District 2: Excavating, placing 8" sanitary sewer line and back filling trench in Benton., September, 1935 - [n.d.]
Martin County
Project #36 District 5: Construction of highway, including grading, draining and surfacing, beginning on State Highway Route No. 40 on Buck Creek at Beauty, KY, a distance of two miles. View of a double box culvert, constructed with native stone., October, 1935 - [n.d.]
Project #36 District 5: Construction of highway, including grading, draining and surfacing, beginning on State Highway Route No. 40 on Buck Creek at Beauty, KY, a distance of two miles. Removing earth and rock cut, Beauty to Buck Creek, down to Elm Creek., October, 1935 - [n.d.]
McCracken County
Project #1-73-28-104 District 1, Branch 3: Excavating with team and slip scrapers, Municipal Swimming Pool at Noble Park, Paducah, KY. The work under this project includes the construction of a 200' X 100' reinforced concrete pool complete with 10' concrete walk around pool, diving towers, etc. A link chain fence is to be built around the property and the entire property landscaped. The City of Paducah is sponsoring this project and contributing 35" of the entire cost of $39,602.00, September, 1935 - [n.d.]
Project #1-73-27-68 District 1, Branch District 3: Photograph 1 in a series showing the various steps in manufacturing brick to be used in building a 10' wall around Keiler Athletic Field in Paducah, KY. Excavating and "puddling" clay prior to mixing in mud-wheel., September, 1935 - [n.d.]
Project #1-73-27-68 District 1, Branch District 3: Photograph 2 in a series showing the various steps in manufacturing brick to be used in building a 10' wall around Keiler Athletic Field in Paducah, KY. Mixing clay by means of old fashioned mud-wheel. Materials are thoroughly mixed in box. Note power supplied by mule walking in circle., September, 1935 - [n.d.]
Project #1-73-27-68 District 1, Branch District 3: Photograph 3 in a series showing the various steps in manufacturing brick to be used in building a 10' wall around the Keiler Athletic Field in Paducah, KY. After bricks are molded, they are placed in lines to dry., September, 1935 - [n.d.]
Project #1-73-27-68 District 1, Branch District 3. Photograph 4 in a series showing the various steps in manufacturing brick to be used in building a 10' wall around the Keiler Athletic Field in Paducah, KY. Bricks being stacked in "kiln" has to be filled, the outside is sealed and fires started. It requires approximately 10 days of burning before brick are thoroughly hardened., September, 1935 - [n.d.]
Project #45 District 1: Making and installing 30" pipe for a combination storm and sanitary sewer on North Tenth Street in Paducah, KY. View shows trench and sheeting of section, 23 ft. in depth. Concrete pipe used was cast as a part of project. Photographed December 11, 1935., December, 1935 - [n.d.]
Project #168 District 1: Constructing and equipping a two-story brick school building at Heath, KY. Dimensions are 274' X 57'. Structure will house 21 classrooms, 2 toilets, shower and dressing rooms and the principal's office. View showing brick work with second story nearing completion. Photographed December 11, 1935., December, 1935 - [n.d.]
McLean County
Project #673 District 1: Reconstruction of streets, building curb and gutter and laying 2" water main in the City of Livermore, KY. Construction of new concrete curb and gutter, preliminary to resurfacing streets with rock asphalt. Photographed November 21, 1935., November, 1935 - [n.d.]
Project #673 District 1: Reconstruction of streets, building curb and gutter and laying 2" water main in the City of Livermore, KY. Construction of new concrete curb and gutter, preliminary to resurfacing streets with rock asphalt. Photographed November 2, November, 1935 - [n.d.]
Mercer County
Project #19 District 2: Construction of a reinforced concrete bridge and approaches thereto on Kirkwood Pike. This project replaces an old all-wood covered bridge in a new location. An old landmark that served its purpose well in its day is being replaced by a modern structure. The old servant stands in the background, while one bent of the new structure shows in the foreground., October, 1935 - [n.d.]
Project #19 District 2: Construction of a reinforced concrete bridge and approaches thereto on Kirkwood Pike. This project replaces an old all-wood covered bridge in a new location. A full view of the new structure from the centerline of the new location., October, 1935 - [n.d.]
Muhlenberg County
Project # 272 District 1: Training Work Centers. Project provides for operation of Women's Training Work Centers at Greenville and Central City. Cutting room of the Training Work Center at Central City. Photographed December 4, 1935., December, 1935 - [n.d.]
Project #272 District 1: Training Work Centers. Project provides for operation of Women's Training Work Centers at Greenville and Central City. Sewing room of Training Work Center at Central City. Photographed December 4, 1935., December, 1935 - [n.d.]
Project #272 District 1: Articles shown in photograph were made while waiting on arrival of new material. Utilization of scraps. Photographed December 4, 1935., December, 1935 - [n.d.]
Owsley County
Project #101 District 4: Constructing native stone box culvert on the Cow Creek Road. This is a typical mountain "farm to market" road. The stone is quarried along the roadside and trimmed by workers on the project. Workmen laying floor and sides of 2.5' X 2.5' box culvert., October, 1935 - [n.d.]
Project #101 District 4: Constructing native stone box culvert on the Cow Creek Road. This is a typical mountain "farm to market" road. The stone is quarried along the roadside and trimmed by workers on the project. Native stone box culvert completed. Note stone used for parapet wall is placed on grade with roadway., October, 1935 - [n.d.]
Pendleton County
Project #3-96-11-90 District 3, Branch District 22: This "storm bridge" is one of the drainage structures on the Mt. Zion Road project. This type of structure is commonly used in Pendleton County due to excessive floods during certain seasons of the year. This "Farm to Market" road project also includes 4.2 miles of surfacing with local limestone, widening of roadway, opening ditches etc. Pendleton County, the sponsor, is contributing 65" of the total project cost., September, 1935 - [n.d.]
Pike County
Project #79 District 5: Construction of an elementary school building at Shelbiana, KY, to be built of native sandstone, quarried near the site. Building will be two stories high and contain eight rooms. This project is typical of the many school buildings in eastern Kentucky being constructed of native sandstone. Photographed December 10, 1935., December, 1935 - [n.d.]
Warren County
Project #105 District 1: Installation of water mains in the City of Bowling Green, KY. This project will provide a valuable addition to the city's water supply system when completed and is being carried on in a very workman like manner. The photograph shows workmen excavating solid rock for a section of the line on 13th Street., October, 1935 - [n.d.]
Webster County
Project #2 District 1: Construction of the Clay to Bordley highway. This project involves the grading and draining of approximately 5.5 miles of road. This project is sponsored by the State Highway Department who furnish majority of equipment and supplies. Plowing banks to loosen earth so it may be loaded into trucks., October, 1935 - [n.d.]
Project #2 District 1: Construction of the Clay to Bordley highway. This project involves the grading and draining of approximately 5.5 miles of road. This project is sponsored by the State Highway Department who furnish majority of equipment and supplies. Section of road showing workmen loading loose earth into trucks., October, 1935 - [n.d.]
Woodford County
Project #363 District 3: Finishing K.E.R.A. Project No. 123-81-9, consisted of finishing masonry work and putting down concrete bridge on Watts Ferry Road, 10.5 miles west of Versailles. Also shouldering road running east from the bridge to Millville School, where road has been widened by blowing off part of the cliff. New bridge constructed on the Watts Ferry Road. Photographed December 3, 1935., December, 1935 - [n.d.]
Project #363 District 3: Finishing K.E.R.A. Project No. 123-81-9, consisted of finishing masonry work and putting down concrete bridge on Watts Ferry Road, 10.5 miles west of Versailles. Also shouldering road running east from the bridge to Millville School, where road has been widened by blowing of part of the cliff. Completed section of Watts Ferry Road, showing new and old approaches to bridge. Photographed December 3, 1935., December, 1935 - [n.d.]
Narrative Report: Photographic Supplement
Christian County
Project #2729 District 1: Master Project #2729 provides for the grading, draining and surfacing of various roads in Christian County. A county road 2 miles northeast of Pembroke, KY, constructed under Master Project #2729. View photographed December 15, 1936., December, 1936 - January, 1937
Larue County
Project #2809 District 2: Reconstruction and repair of three county roads in Larue County. View, photographed June 4, 1936, shows workmen clearing right of way on the Tanner-Maxine Road., June, 1936 - July, 1936
Madison County
Project #1728 District 4: Improvements to the city water works system in Richmond, KY. View, photographed December 16, 1936, shows workmen constructing a dam for the Richmond Waterworks Reservoir., December, 1936 - January, 1937
Adair County
Project #1940 District 2: Construction of a gymnasium building, also housing four additional classrooms for the high school at Columbia, KY. View shows workmen erecting forms for concrete foundation. Photographed April 1, 1936., February, 1936 - March, 1936
Project #1940 District 2: Project #1940 is the construction of a building containing a gymnasium, four classrooms and a basement in the City of Columbia, KY. Exterior of the Columbia gymnasium building nearing completion. View photographed August 3, 1936., October, 1936 - November, 1936
Project #2804 District 2: Sewage Disposal Plant, Columbia, KY. Master Project #2804 provides for completion of the sewerage system, including construction of a sewage disposal plant and for extension of the water system in the City of Columbia, KY. Workmen shown setting forms for concrete walls of disposal plant. View photographed June 26, 1936., December, 1936 - January, 1937
Project #1940 District 2: Construction of a four-room addition to the high school building and the construction of a high school gymnasium building at Columbia, KY. View photographed May 7, 1936, shows the windows of building have been designed for well lighted classrooms., May, 1936 - June, 1936
Project #1940 District 2: Interior view of the high school gymnasium building under construction at Columbia, KY., May, 1936 - June, 1936
Project #1940 District 2: Project #1940 is the construction of a building containing a gymnasium, four classrooms and a basement in the City of Columbia, KY. Brick masons at work on a wall of the gymnasium building. View photographed August 3, 1936., October, 1936 - November, 1936
Allen County
Project #1378 District 6: Nearing completion is the new six-room consolidated school building at Mt. Zion, KY, photographed May 14, 1936. This structure was built under WPA Project #1378. It is of brick veneer construction with asphalt slate roof., May, 1936 - June, 1936
Project #2599 District 6: A six-room school building has been constructed at Petroleum, KY. View photographed September 25, 1936., September, 1936 - October, 1936
Anderson County
Project #787 District 2: Construction of a gymnasium building for Western High School near Lawrenceburg, KY. Construction is of solid concrete units, laid in rowlock fashion to give a 12-inch wall. Photographed March 20, 1936., February, 1936 - March, 1936
Project #787 District 2: Construction of a gymnasium at Western High School, Johnsonville, KY. Construction is of solid concrete units, made on site by a power machine. View shows foundation walls laid and flooring under way. Photographed April 20, 1936., April, 1936 - May, 1936
Project #2768 District 2: Reconstruction of West Woodford Street in Lawrenceburg, KY. Resurfacing street with rock asphalt. View photographed July 24, 1936 shows men raking asphalt before it is rolled., August, 1936 - September, 1936
Project 923, Master Project #2846 District 2: Project #923, a unit of Master Project #2846, is the construction of a road extending from a point three-fourths of a mile north of Lawrenceburg in Anderson County, and extending through Clifton, KY, to the Woodford County line. It will have a traffic bound macadam surface. Crushed limestone has been placed on the road down to the point where the portable crusher is located. Rock for the road is crushed by this crusher. View photographed July 24, 1936., December, 1936 - January, 1937
Ballard County
Project #2214 District 1: WPA Project #2214 undertakes the completion of the new Barlow School at Barlow, KY. Work on this structure, a two-story brick building, 107' X 144' in dimension, was started by K.E.R.A. Front view showing building nearing completion. Photographed March 3, 1936., March, 1936 - April, 1936
Bath County
Project #1303 District 4: Gymnasium Building, Sharpsburg, KY. Construction of a combination gymnasium-auditorium building, of native limestone for the Sharpsburg Independent School in Bath County. The photograph, taken July 22, 1936, is an exterior view, showing stone masons laying wall., July, 1936 - August, 1936
Project #1303 District 4: Interior view of the Sharpsburg Gymnasium photographed July 22, 1936, showing stone masons laying exterior wall, adjacent to the present school building., July, 1936 - August, 1936
Project #1303. Stone quarry in Bath County operated as a part of Project #1303, which provides for the construction of a combined gymnasium and auditorium building for the high school at Sharpsburg, KY., June, 1936 - July, 1936
Bell County
Project #1010, Master Project #2771 District 4: Project #1010, a unit of Master Project #2771, is for grading and draining and surfacing .45 miles of road connecting U.S. Highway 25-E with the Pine Mountain State Park Road. This project, located in Bell County, eliminates all railroad crossings and ramps and also a very dangerous and narrow underpass on the entrance to the park. Workmen "dressing up" road from U.S. 25-E to Pine Mountain State Park. View photographed July 20, 1936., December, 1936 - January, 1937
Project #2771 District 4: Bridge abutment for structure over Clear Creek on Harmony-Waterdale Road in Bell County, is shown in photograph taken April 16, 1936. This work is included in WPA Project #2771 which provides for grading, draining and surfacing of 79.3 miles of secondary roads in Bell County., April, 1936 - May, 1936
Project #1685 District 4: Project #1685 provided for the construction of a two-room rural school building at Hutch, KY. View, photographed July 22, 1936, shows the building nearing completion. Construction was of native stone., July, 1936 - August, 1936
Project #2356 District 4: Municipal Airport at Middlesboro, KY. Construction of runways for a municipal airport at Middlesboro, KY. View, photographed July 15, 1936, shows workmen clearing ground and excavating, preparatory to construction of the runways., July, 1936 - August, 1936
Project #1043 District 4: Project #1043 provides for the construction of a recreational center, including an administration building and a swimming pool, at Bartlett-Rhodes Park in Middlesboro, KY. The new bath house and swimming pool at Bartlett-Rhodes Park, Middlesboro. View was photographed July 23, 1936., August, 1936 - September, 1936
Project #2458 District 4: Project #2458 provides for the construction of an elementary 6-room, native stone school building at Balkan, KY. Front view of the Balkan School Building, showing native stone walls under construction. This photograph was taken July 20, 1936., October, 1936 - November, 1936
Project #1043 District 4: Improvements being made at Bartlett-Rhodes Park in the City of Middlesboro, KY, under Project #1043 include the construction of an administration building and a swimming pool. Combination native stone and log park building nearing completion. View photographed November 6, 1936., November, 1936 - December, 1936
Project #2473 District 4: Native stone school in Bell County. Construction of an elementary six-room native stone school building at Fonde, KY. The Fonde School is a typical example of native stone construction in eastern Kentucky. View photographed September 17, 1936., December, 1936 - January, 1937
Boone County
Project #2849 District 3: Project #2849 is the repair and improvement of various roads in Boone County. View, photographed June 25, 1936, shows men excavating for and building a stone culvert on Price Pike., June, 1936 - July, 1936
Bourbon County
Project #2600 District 3: Men mixing concrete for laying and repairing sidewalks and curbs in the City of Paris, KY. View was photographed May 29, 1936., June, 1936 - July, 1936
Project #2718, Master Project #3157 District 3: Project #2718, now consolidated under Master Project #3157, is the construction of sanitary sewers for various streets in Paris, KY. Workmen excavating a trench for installation of an 8-inch vitrified pipe in Lilleston Avenue. View photographed July 29, 1936., December, 1936 - January, 1937
Project #3048 District 3: Master Project #3048, which was completed November 24, 1936, provided for the construction of concrete sidewalks in various parts of Paris, KY. View, photographed November 12, 1936, shows workers mixing concrete for new sidewalks on Main Street., December, 1936 - January, 1937
Project #3048 District 3: Master Project #3048, which was completed November 24, 1936, provided for the construction of concrete sidewalks in various parts of Paris, KY. View, taken December 18, 1936, showing completed concrete sidewalk on Main Street., December, 1936 - January, 1937
Boyd County
Project #1455 District 5: Improvements for City Parks in Ashland, KY. The view shows the Central Park Pool, constructed with native sandstone and finished with cement cap. Photographed March 25, 1936., February, 1936 - March, 1936
Project #2288 District 5: Construction of eleven fish rearing pools and game hatchery for the State Game and Fish Commission of Kentucky. Site of the project adjoins the Bellefonte Country Club near Ashland, KY. View shows construction of curved earth dam. Photographed March 25, 1936., February, 1936 - March, 1936
Project #729 District 5: Construction of a native stone Public Library building in the City of Ashland, KY. The main building is 72' X 36' in dimension with an "L" 40' X 30'. View shows stone work almost completed and structure ready to receive roof. Photographed March 25, 1936., February, 1936 - March, 1936
Project #729 District 5: Project #729 is the construction of a public library in the Public Park at Ashland, KY. The view, photographed June 15, 1936, shows completed outside walls which are of native stone construction., June, 1936 - July, 1936
Project #2288 District 5: Project #2288 is for the building of eleven additional fish rearing pools, one lake and 1600 feet of road at the State Fish Hatchery near Ashland, KY. A fish rearing pool photographed July 8, 1936., December, 1936 - January, 1937
Project #2136 District 5: Recreation period of the WPA Nursery School at Ashland, KY. This school is operated under Project #2136. View was photographed June 15, 1936., May, 1936 - June, 1936
Project #2136 District 5: Another view of children enrolled in the Ashland, KY, Nursery School, showing them ready to drink their milk at the start of lunch., May, 1936 - June, 1936
Project #195 District 5: Women's sewing projects in Boyd County. View, photographed June 15, 1936, of the Training Work Center at Ashland, KY. Women of the Center are shown making wearing apparel., May, 1936 - June, 1936
Project #889 District 5: Women's sewing projects in Boyd County. The comforter project at Catlettsburg, KY, appears in this view, photographed June 15, 1936. Women on this Project #889 are at work making comforters., May, 1936 - June, 1936
Project #729 District 5: Construction of a municipal public library building of native sandstone in the City of Ashland, KY. Front view of the Ashland Public Library Building of native sandstone construction. Photograph taken August 12, 1936., August, 1936 - September, 1936
Project #729 District 5: Construction of a municipal public library building of native sandstone in the City of Ashland, KY. Side view of the Ashland Library photographed August 12, 1936., August, 1936 - September, 1936
Project #3030 District 5: The construction of a reinforced concrete stadium for the high school at Ashland, KY. View shows stadium construction with workmen pouring risers and treads on the east side of the field. View photographed September 21, 1936., September, 1936 - October, 1936
Project #2419 District 5: Two improvements for the Putnam Junior High School in the City of Ashland, KY, are the construction of a stadium and of a driveway abutting the school property. Under Project #2419 a reinforced concrete stadium is being built. This project also includes landscaping adjacent to the stadium and construction of necessary walkways. North bleachers, constructed of reinforced concrete, at Putnam Junior High School. View photographed August 6, 1936., October, 1936 - November, 1936
Project #1490 District 5: Two improvements for the Putnam Junior High School in the City of Ashland, KY, are the construction of a stadium and of a driveway abutting the school property. Project #1490 is the construction of a concrete driveway, sidewalk, curb and gutter, extending from Blackburn Avenue to Twenty-ninth Street, which will provide a paved approach to the high school building. The pavement is 903 feet in length, 20 feet wide and 7 inches thick. Concrete driveway approaching Putnam Junior High School. View photographed August 6, 1936., October, 1936 - November, 1936
Project #2859, Serial Number 5-10-138 District 5: Under Serial Number 5-10-138 of Master Project #2859, the Sharpes Creek Road in Boyd County is to be graded, drained and surfaced. View shows the grading and sloping on Sharpes Creek Road, photographed September 21, 1936., December, 1936 - January, 1937
Project #729 District 5: Project #729 is the construction of a public library building in Ashland, KY. Outside walls are of native stone. Front view of Ashland Public Library, photographed December 16, 1936., December, 1936 - January, 1937
1937 Flood. Rescure work at Catlettsburg, KY. WPA workers rescuing a Negro woman from the second floor of her home at Catlettsburg, KY. View was photographed January 26, 1937., January, 1937 - February, 1937
Boyle County
Project #2841 District ?: A concrete and steel bridge constructed on the Mackville Road in Boyle County under Master Project #2841 providing for the reconstruction and repair of county roads. Work on the Mackville Road was formerly designated as Project #2636. View was photographed July 13, 1936., July, 1936 - August, 1936
Project #2720 District 2: The resurface and repair of various streets throughout the City of Danville, KY, are embraced in Project #2720. View, photographed July 28, 1936, shows workmen placing stone, preparatory to surfacing with a bituminous retread., October, 1936 - November, 1936
Project #2720 District 2: The resurface and repair of various streets throughout the City of Danville, KY, are embraced in Project #2720. Men loading stone for use in water-bound macadam base during repair of streets. View photographed July 28, 1936., October, 1936 - November, 1936
Master Project #2941 District 2: Under Master Project #2941 the reconstruction and repair of various roads in Boyle County are provided. View shows reconstruction of a rural road showing a small power shovel loading earth, photographed July 28, 1936., December, 1936 - January, 1937
Breathitt County
Project #600 District 5: WPA Project #600 provides for the construction of a three-room school building of native stone construction at Big Rock, KY. View shows stone work practically completed. Photographed March 9, 1936., February, 1936 - March, 1936
Breckinridge County
Project #1402 District 2: Pouring concrete for new sidewalk on Elm Street, Cloverport, KY, photographed March 20, 1936. This is part of WPA Project #1402 which also provides for the grading, draining and surfacing of Elm Street with river gravel., February, 1936 - March, 1936
Project #771 District 6: Reconstruction of a road in Breckinridge County, beginning at the intersection of the McQuady-Glenn Dean Road and extending southwesterly for a distance of 8.3 miles. Completed 54' span steel and concrete bridge. Constructed on the road described above. View photographed November 11, 1936., November, 1936 - December, 1936
Project #771 District 6: Under Project #771, a distance of 8.3 miles of the Rockvale Road in Breckinridge County is to be graded, drained and surfaced. View shows a 54' steel span on the Rockvale Road, photographed November 11, 1936., December, 1936 - January, 1937
Project #774 District 6: Construction of two bridges and seven culverts and the grading and draining of the Potesville Road in Breckinridge County are included under Project #774. Workmen "bolting up" a 54-foot steel truss. Concrete abutments are completed. View photographed October 14, 1936., December, 1936 - January, 1937
Bullitt County
Project #786 District 6: WPA Project #786 provides for grading, draining and surfacing 5.5 miles of the Cane Spring Road in Bullitt County from Cedar Grove Church to the Nelson County line. Men at work on ditching and grading of the road, shown in photograph taken June 10, 1936., May, 1936 - June, 1936
Butler County
Project #2442 District 1: Construction of additional sewers to complete the sewerage system in the City of Morgantown, KY. View shows men digging sewer trench. Photographed July 15, 1936., June, 1936 - July, 1936
Caldwell County
Project #486 District 1: Workmen spreading grout over the rock base during construction of cement bound macadam streets in Princeton, KY. View of the work was photographed March 14, 1936., February, 1936 - March, 1936
Project #486 District 1: Construction of cement bound macadam streets in the City of Princeton, KY. The coarse aggregate for this work is being furnished from the city rock crusher, which is set up in this project. Workmen shown preparing sub-grade for the new cement bound macadam streets in the City of Princeton. Photographed March 3, 1936., March, 1936 - April, 1936
Project #486 District 1: Construction of cement bound macadam streets in the City of Princeton, KY. Workmen tamping the cement into a coarse aggregate. Photographed March 3, 1936., March, 1936 - April, 1936
Project #486 District 1: New cement bound streets for the City of Princeton, KY. View shows a finished slab. Photographed March 3, 1936., March, 1936 - April, 1936
Calloway County
Project #1627 District 1: Improvements to the Murray State Teachers College Stadium in Murray, KY, were provided by Project #1627, completed March 13, 1936. This stadium was practically completed under K.E.R.A. View photographed December 21, 1936., December, 1936 - January, 1937
Campbell County
Project #2814, formerly #2408 District 3: Construction of 12,000 lineal feet of curb and gutter on various streets in the City of Newport, KY, is embraced in Project #2408, now consolidated under Master Project #2814 (construction of various streets in Newport). Preparing subgrade, prior to pouring concrete curb and gutter on Riverside Drive. View photographed August 18, 1936., October, 1936 - November, 1936
Project #2510 District 3: Construction of curb and gutter on Eleventh Street in the City of Newport, KY, was started February 8, 1936 under WPA Project #2510. Finishing surface of concrete gutter. Photographed March 6, 1936., March, 1936 - April, 1936
Project #792 District 3: Installation of an auxiliary storm sewer in Berry Street, Newport, KY, is a very necessary improvement. Digging trench for installation of the storm sewer. Photographed February 21, 1936., March, 1936 - April, 1936
Project #1618 District 3: WPA Project #1618 provides for reconstruction of East Eighth Street in Newport, KY, for an area of 415 feet in length and 30 feet in width. The existing brick paving is removed, cleaned and replaced bottom side up with the addition of as many new bricks as are necessary. Re-laying paving brick on a Newport, KY street. Photographed March 6, 1936., March, 1936 - April, 1936
Project #1618 District 3: WPA Project #1618 provides for reconstruction of East Eighth Street in Newport, KY, for an area of 415 feet in length and 30 feet in width. The existing brick paving is removed, cleaned and replaced bottom side up with the addition of as many new bricks as are necessary. View of section of re-layed brick pavement. Photographed March 6, 1936., March, 1936 - April, 1936
Project #2814 District 3: Construction of streets in the City of Newport, KY. The photograph, taken June 9, 1936, shows construction of a portion of Newport sidewalks., June, 1936 - July, 1936
Project #2407 District 3: Project #2407, which is part of Master Project #2813, provides for the construction and installation of a sewer on Washington Avenue, from Fourth Street to the Ohio River in the City of Newport, KY. Washington Street sewer outfall nearing completion. View photographed August 18, 1936., August, 1936 - September, 1936
Project #2407 District 3: Washington Street Sewer Outfall Sewer in Newport, KY. View looking toward Ohio River Outlet of the Washington Street Outfall Sewer, photographed August 18, 1936., August, 1936 - September, 1936
Project #2407 District 3: Washington Street Sewer Outfall Sewer in Newport, KY, looking from the Ohio River Outlet. View photographed August 26, 1936., August, 1936 - September, 1936
Project #2874 District 3: Various improvements at the Fort Thomas Army Post in Campbell County are being made under Project #2874. Installation of curb and gutters at one entrance to the Fort Thomas Army Post. View photographed July 20, 1936., September, 1936 - October, 1936
Project #2814, formerly Project #2408 District 3: Construction of 12,000 lineal feet of curb and gutter on various streets in the City of Newport, KY, is embraced in Project #2408, now consolidated under Master Project #2814. Setting curb and gutter forms. Curve forms are shown in the view, photographed August 26, 1936., October, 1936 - November, 1936
Project #2912 District 3: Project #2912 at Newport, KY, provides for regrading and resurfacing Washington Avenue, the surface to be of rock asphalt. Gutters will be of brick, four feet wide. View, photographed November 14, 1936, of workmen laying cement grouted brick gutter on Washington Avenue., December, 1936 - January, 1937
Project #2912 District 3: Project #2912 provides for regrading and resurfacing, with rock asphalt, Washington Avenue from Third Street to Eleventh Street in Newport, KY. View shows resurfacing Washington Avenue. Workmen are shown removing and cleaning old brick, which will be used in constructing brick gutters on this street. View photographed August 18, 1936., December, 1936 - January, 1937
Project #3174 District 3: Women's Sewing Project. Operation of sewing rooms at Newport and Bellvue, KY, in Campbell County. Garments and articles for impoverished and destitute families are made on this project. Women making garments in the Training Work Center in Newport, KY., December, 1936 - January, 1937
1937 Flood. Evacuating a family at Newport, KY. WPA boat bringing in a marooned family at Newport, KY. View photographed January 27, 1937., January, 1937 - February, 1937
1937 Flood. Moving furniture from stricken area. A close up view of a raft used by the WPA in moving furniture from flood stricken homes in Newport, KY. Photograph taken January 24, 1937., January, 1937 - February, 1937
Carlisle County
Project #365 District 1: This improvement of Elsey Avenue from Elm Street to the east city limits in the City of Bardwell, KY, was accomplished under Project #365. Other streets, sidewalks and curbs in Bardwell are being built under a new project, #2933. Concrete street completed under Project #365. View taken March 4, 1936., September, 1936 - October, 1936
Project #2933 District 1: The improvement of Elsey Avenue from Elm Street to the east city limits in the City of Bardwell was accomplished under Project #365. Other streets, sidewalks and curbs in Bardwell are being built under a new project, #2933. This view, photographed September 29, 1936, shows street excavation work in progress under Project #2933., September, 1936 - October, 1936
Project #459 District 1: Construction of a brick veneer building containing a gymnasium and two classrooms in Arlington, KY. View of completed gymnasium building photographed September 9, 1936., December, 1936 - January, 1937
Project #365 District 1: This improvement of Elsey Avenue from Elm Street to the east city limits in the City of Bardwell, KY, includes the installation of storm drains, the construction of concrete paving, reinforced concrete pipe and curbing and gutter. Crew installing 36-inch concrete pipe made on this project. Photographed March 4, 1936., January, 1936 - February, 1936
Carroll County
Project #91 District 3: Laying 23,000 feet of sanitary pipe in several streets of Carrollton, KY. Opening up trench preparatory to laying sanitary sewer pipe at Carrollton. Photographed January 17, 1936., January, 1936 - February, 1936
Project #91 District 3: Project #91 at Carrollton, KY, provides for the laying of 23,000 feet of sanitary sewers. View photographed April 15, 1936, shows workmen filling in the trench and tamping down the earth, after installation of the sewer pipe., April, 1936 - May, 1936
Carter County
Project #1424 District 5: Cutting stone for Grayson, KY jail. A county jail, of native stone construction, is being erected at Grayson, KY. View shows workmen cutting stone for new jail, photographed October 8, 1936., September, 1936 - October, 1936
Casey County
Project #868 District 2: WPA Project #868 provides for general renovation of the Casey County Courthouse at Liberty, KY. Work includes replacing old roof with new roof, repainting the building and renewing eaves trough and down pipe. View of workmen repairing and repainting exterior of the building was photographed April 15, 1936., April, 1936 - May, 1936
Project #2512 District 2: Project #2512 is the erection of a concrete block gymnasium addition to the high school at Liberty, KY. Interior view of the foundation of the Liberty High School Gymnasium, photographed June 22, 1936., September, 1936 - October, 1936
Project #2512 District 2: Project #2512 is the construction of a concrete block high school gymnasium building for the high school at Liberty, KY. Exterior view of the Liberty High School Gymnasium nearing completion, photographed November 12, 1936., November, 1936 - December, 1936
Christian County
Project #850 District 1: Ninth Street Bridge, Hopkinsville, KY. Construction of a three-span reinforced concrete bridge across North Fork of Little River at the foot of Ninth Street in Hopkinsville, KY. The view, photographed July 16, 1936, shows preliminary excavation. Abutments and piers will be of stone masonry., June, 1936 - July, 1936
Clark County
Project #569 District 4: Project #569 provides for the construction of asphalt surfaced and water bound macadam streets in Winchester, KY. The view, photographed July 23, 1936, shows retread work in progress., July, 1936 - August, 1936
Project #831 District 4: Grading and draining the Goose Creek Road in Clark County is provided by Project #831, now consolidated under Master Project #2856. The view, photographed July 23, 1936, shows a grader in operation., July, 1936 - August, 1936
Project #831 District 4: Another view, photographed July 23, 1936, of the Goose Creek Road Project. This picture shows construction of a culvert in progress., July, 1936 - August, 1936
Project #182 District 4: Winchester, KY, Training Work Center. Project #182 is the operation of a Training Work Center at Winchester, KY. Women are employed on this project to make wearing apparel and other articles, which are distributed by the sponsor to needy families. View of the (white) Women's Training Work Center, photographed October 16, 1936., October, 1936 - November, 1936
Clinton County
Project #761 District 2: Under Project #761 of Master Project #2744, the Nora-Cumberland City Road in Clinton County, is being graded, drained and surfaced with crushed limestone for a distance of 4.5 miles. The grading, draining and surfacing with crushed limestone of the Peola Church Road in Clinton County is Project #2475. View of Nora-Cumberland city road after grading and draining. Photograph taken August 12, 1936., September, 1936 - October, 1936
Project #2475 District 2: The grading, draining and surfacing with crushed limestone of the Peola Church Road. A typical stone masonry box culvert, with concrete parapets, on the Peola Church Road. View was photographed October 8, 1936., September, 1936 - October, 1936
Cover Picture
The picture on the cover of this issue of the Narrative Report draws a sharp contrast between an old dilapidated schoolhouse, appearing in the inset, and a modern school building. The former is one of a number in Kentucky now being replaced by WPA constructed school buildings, of which the one shown is a typical example. It is a four-room school of native sandstone quarried on the project., October, 1936 - November, 1936
The picture on the cover of this issue of the Narrative Report draws a sharp contrast between an old dilapidated schoolhouse, appearing in the inset, and a modern school building. The former is one of a number in Kentucky now being replaced by WPA constructed school buildings, of which the one shown is a typical example. It is a four-room school of native sandstone, quarried on the project., October, 1936 - November, 1936
Crittenden County
Project #921 District 1: The construction of asphalt streets in a section of Marion, KY. Marion is the county seat. Asphalt surface on Elm Street. View photographed December 17, 1936., December, 1936 - January, 1937
Cumberland County
Project #1206 District 2: Construction of an auditorium-gymnasium building, also housing four additional classrooms for the high school at Marrowbone, KY. View shows workmen laying first story walls. Photographed April 4, 1936., February, 1936 - March, 1936
Project #1206 District 2: Construction of an auditorium-gymnasium building for the high school at Marrowbone, KY. The concrete brick walls of the structure were nearing completion at time photograph was taken, April 17, 1936., April, 1936 - May, 1936
Project #1206 District 2: WPA Project #1206 provides for the construction of an auditorium-gymnasium building, also containing four classrooms for Marrowbone High School in Cumberland County. Photograph, taken May 6, 1936, shows a side view of the new building., May, 1936 - June, 1936
Project #1206 District 2: View of the stage of the new auditorium-gymnasium for Marrowbone High School in Cumberland County. Photograph was taken from interior of the auditorium May 6, 1936., May, 1936 - June, 1936
Project #1206 District 2: Construction of an auditorium-gymnasium building at the rear of the county high school at Marrowbone, KY, is provided by WPA Project #1206. The new structure will also contain four additional classrooms. It is 102 feet long and 60 feet wide at one end, and 85 feet wide at the other end. View shows concrete foundation walls for the new structure. Photographed March 3, 1936., March, 1936 - April, 1936
Daviess County
Project #610 District 1: Laying of 14,000 feet of sewer pipe in the City of Owensboro, KY. View of project showing ample shoring and bracing for the protection of workmen. Photographed January 21, 1936, January, 1936 - February, 1936
Project #2656 District 1: Installation of sewers in Ford, Kelroy and Griffith avenues in the City of Owensboro, KY. View photographed March 1, 1936, shows crew opeing ditch for 27-inch pipe., February, 1936 - March, 1936
Project #1-73-324-168. Heath High School completed May 4, 1936. [MISSING], April, 1936 - May, 1936
Elliott County
Project #582 District 5: Completing the construction of Court House at Sandy Hook, KY. Structure is to be two stories high and 50' X 90' in dimension. Foundation was constructed as on F.E.R.A. project. Photographed December 12, 1935., January, 1936 - February, 1936
Project #582 District 5: Courthouse, Sandy Hook, KY. Project #582 provides for the construction of a courthouse at Sandy Hook, KY. View, photographed June 3, 1936, shows structure ready for roofing. Walls are of native freestone, quarried as part of the project., July, 1936 - August, 1936
Project #582 District 5: Project #582 is to complete the construction of the Elliott County Courthouse at Sandy Hook, KY. The foundation was laid under K.E.R.A. View shows courthouse nearing completion, photographed December 17, 1936., December, 1936 - January, 1937
Estill County
Project #2755, formerly #1038 District 4: Wagersville Bridge in Estill County. Under Project #1038, now consolidated under a county-wide road project, Master Project #2755, a bridge across Station Camp Creek at Wagersville in Estill County is being constructed. The bridge will have two 30-foot and one 60-foot steel spans and concrete abutments and piers. Wagersville Bridge under construction. View photographed September 9, 1936., October, 1936 - November, 1936
Project #2755 District 4: A three-span steel and concrete bridge has been constructed across Station Camp Creek near Wagersville, KY. View was photographed December 16, 1936., December, 1936 - January, 1937
Fayette County
Project #1284 District 3: Improvements for the athletic field of the University of Kentucky, Lexington, KY. Preparing for construction of concrete retaining wall. Photographed January 18, 1936., January, 1936 - February, 1936
Project #1876 District 3: Completion of superstructure of an addition to Bryan Station School in Fayette County. The addition will contain seven additional classrooms and a study hall. The view shows concrete foundation and structural steel framing in process of construction. Photographed March 23, 1936., February, 1936 - March, 1936
Project #2816 District 3: Sanitary sewer construction on various streets throughout the City of Lexington, KY. Installation of sanitary sewer on Church Street is shown in above view. Photographed April 22, 1936., April, 1936 - May, 1936
Project #1876 District 3: WPA Project #1876 provides for completion of the superstructure of an addition to the Bryan Station High School in Lexington, KY. View shows structural steel framing in place for new building. Photographed April 22, 1936., April, 1936 - May, 1936
Project #1078 District 3: Improvements to the University of Kentucky Stadium, Lexington, KY, have been accomplished through Project #1078. They included the construction of a new reinforced concrete press box and the building of a one-quarter mile cinder track. Completed press box at the University of Kentucky stadium. View photographed August 7, 1936., October, 1936 - November, 1936
Project #399 District 3: City of Lexington Crusher Plant where stone is crushed by WPA employees for use on WPA projects sponsored by that city.Photographed February 17, 1936., January, 1936 - February, 1936
Project #177 District 3: Construction of a native stone county consolidated school building in Fayette County on Briar Hill Road, eight miles east of Lexington. Building will contain six rooms and an auditorium. Photographed February 6, 1936., January, 1936 - February, 1936
Project #1284 District 3: Construction of concrete retaining wall, concrete fence and other improvements are provided for Stoll Athletic Field, University of Kentucky campus, Lexington, KY. View, photographed March 23, 1936, shows concrete fence, prior to removal of form work., February, 1936 - March, 1936
Project #1284 District 3: View of another section of the new concrete fence at Stoll Field, University of Kentucky campus, Lexington, KY, after removal of forms. Photographed March 23, 1936., February, 1936 - March, 1936
Project #1651 District 3: Reconstruction of the greenhouse on the University of Kentucky campus, Lexington, KY. The concrete foundation, walls and footings and concrete floor are of new construction. View was photographed March 23, 1936., February, 1936 - March, 1936
Project #177 District 3: Construction of a native stone county school building in Fayette County on Briar Hill Road, 8 miles northeast of Lexington, KY. Front view of the building, photographed May 1, 1936, shows structure near completion., April, 1936 - May, 1936
Project #1963 District 3: Construction of Squires Road in Fayette County showing grade, drain and surface. Finishing with grader and water-bound macadam surface., May, 1936 - June, 1936
Project #2695, Master Project #2816 District 3: Installation of an 8-inch sanitary sewer in Church Street, between Market and Upper streets in Lexington, KY. This project provides for renovating and improving the existing sewer systems in Lexington, in addition to laying new sewer lines., May, 1936 - June, 1936
Project #1876 District 3: Addition to Bryan Station School. Workmen laying brick walls of the addition to the Bryan Station High School Building, Lexington, KY. Construction of the addition is Project #1876, now a unit of Master Project #2815. View was photographed July 10, 1936., July, 1936 - August, 1936
Project #1459, Master Project #2815 District 3: View of the Athens High School Building in Fayette County, showing completed exterior of the addition to the building. The addition begins between the tow single windows above the parked automobile, and extends to rear of the structure. Photograph was taken July 10, 1936., July, 1936 - August, 1936
Project #1876 District 3: Completion of the superstructure of an addition to the Bryan Station High School near Lexington, KY is Project #1876, which is covered by Master Project #2815. The foundation for this addition was built under WPA Project #169. Addition to Bryan Station School nearing completion. View photographed August 8, 1936., August, 1936 - September, 1936
Project #9965 District 3: State Project #9965 provides for the setting up and the operating of 100 units of Nursery Schools for developing the physical and mental well-being of preschool children from needy families. "Nap Time" at Lincoln School in Lexington, KY., December, 1936 - January, 1937
Project #1953 District 3: This project at Lexington, KY, provides for the cutting of a new channel to a concrete twin box culvert recently constructed under a P.W.A. contract. The culvert is located in the L & N railroad yards west of the Jefferson Street viaduct. Building retaining walls and excavating channel change for the recently constructed concrete box culvert. Photographed February 17, 1936., January, 1936 - February, 1936
Project #124 District 3: Project #124 includes the building of a new boiler room and new stack, the construction of a stone fence 400 feet long, and the construction of a concrete walk around the playground, all of these improvements being to the Russell Cave public school in Fayette County, 6 miles from Lexington. Workmen laying stone wall at Russell Cave School, photographed February 24, 1936., March, 1936 - April, 1936
Fleming County
Project #113 District 3: WPA Project #113, providing for the surfacing of various roads in Fleming County, includes the operation of a stone quarry in connection with the project. View of Fleming County quarry taken March 9, 1936., March, 1936 - April, 1936
Floyd County
Project #3288 District 5: The grading and paving with concrete of various streets in the City of Prestonsburg, KY. The view, photographed November 12, 1936, shows the workers finishing section of concrete street in Prestonsburg., November, 1936 - December, 1936
Fulton County
Project #518 District 1: Construction of a one-story brick high school building in Cayce, KY. View, photographed April 8, 1936, shows interior of the auditorium facing the stage., February, 1936 - March, 1936
Project #518 District 1: Photograph taken April 8, 1936, shows storm sheathing in place for the new high school building under construction at Cayce, KY. The building will be one-story high and of brick construction. It replaces a frame school structure that was dismantled and the material salvaged as part of the project., April, 1936 - May, 1936
Project #518 District 1: Construction of a one-story brick veneered school building containing 11 rooms, auditorium, gymnasium, stage and dressing rooms at Cayce, KY. View of the front of the building, nearing completion, ws photographed May 7, 1936., May, 1936 - June, 1936
Garrard County
Project #2806 District 2: Project #2806 provides for the repairing and improving of various roads in Garrard County, including the grading, draining and surfacing with crushed limestone the Buena Vista Road for a distance of 5 miles. View of the completed road, photographed September 25, 1936., December, 1936 - January, 1937
Project #2806 District 2: Master Project #2806 provides for repairing and improving various roads in Garrard County. A total distance of 16.2 miles of county roads is to be graded, drained and surfaced. Workmen laying base stone on the Fork Church Road. View photographed August 31, 1936., September, 1936 - October, 1936
Project #2806 District 2: View, photographed October 2, 1936 of a "traveling" crusher, which is being used in surfacing Fisher Ford Road in Garrard County., September, 1936 - October, 1936
Project #2806 District 2: Project #2806 provides for the repairing and improving of various roads in Garrard County, including the grading, draining and surfacing with crushed limestone the Buena Vista Road for a distance of 5 miles. Crushed limestone surface placed on Buena Vista Road. Photographed July 30, 1936., December, 1936 - January, 1937
Grant County
Project #2935 District 3: Farm-to-market road reconstruction in Grant County, is provided by Master Project #2935. Covered by this project is the erection of a bridge, 66' X 16' X 15' on the Falson-Elliston Station Road. Workers pouring concrete abutment for two-span bridge on Falson-Elllston Station Road. View photographed October 29, 1936., November, 1936 - December, 1936
Project #2935 District 3: Farm-to-market road reconstruction in Grant County. Covered by this project is the erection of a bridge, 66' X 16' X 15' on Falson-Elliston Road. This view of the bridge, photographed November 13, 1936, shows workers finishing concrete slab., November, 1936 - December, 1936
Graves County
Project #3126 District 1: Project #3126 provides for improving approximately 75 miles of secondary and feeder roads in Graves County. Construction of an earth fill on a secondary road. A dump truck is shown unloading earth in this view, photographed September 28, 1936., September, 1936 - October, 1936
Project #2837 District 1: Elimination of the breeding places of mosquitoes near Mayfield, KY, by increasing the grade and slope of Red Duck Creek to insure adequate drainage in Project #2837. Drag line being used to increase the grade and slope of Red Duck Creek. View photographed August 21, 1936., August, 1936 - September, 1936
Project #3008 District 1: Project #3008 is the construction of a six-room brick veneer school building at Hickory Grove, KY. View shows roofing and sheathing work for the proposed brick veneer school. Photograph taken September 25, 1936., December, 1936 - January, 1937
Grayson County
Project #83 District 2: Improvements of farm-to-market roads. Grading, draining and surfacing approximately 6 miles of a farm-to-market road, beginning at the city limits of Caneyville and extending north. The road is being surfaced with rock 16 feet wide and 6 inches deep. View shows that rock has been laid up to point at immediate rear of tractor. Photographed December 10, 1936., January, 1937 - February, 1937
Green County
Project #759 District 2: Painting Bridges. Project #759 provides for repairing, cleaning and painting of three county owned bridges. View of this work in progress on one of the bridges is shown in photograph taken June 4, 1936., June, 1936 - July, 1936
Project #2206 District 2: The construction of a city water supply and distribution system in Greensburg, KY. View photographed December 30, 1936., December, 1936 - January, 1937
Hancock County
Project #2685 District 1: The grading, draining and surfacing of 5 miles of the Easton-Lyonia Road in Hancock County and of 6.9 miles of the Humphrey-McFall Road in Union County are provided respectively by project #2685 (now included under Master Project #2732) and by Project #1479 (now included under Master Project #2740). Views of the work on the two road reconstruction jobs. Crushing and laying base stone on Easton-Lyonia road in Hancock County. Photograph taken September 1, 1936., August, 1936 - September, 1936
Project #2418 District 5: The WPA worker shown in the view is indexing original deeds in the first deed books of Hancock County. She is employed on the Hancock County cross-indexing Project #2418., December, 1936 - January, 1937
Project #2443 District 1: WPA Project #2443 at Hawesville, KY, provides for the construction of a farm shop and home economics buildingon the Hawesville High School grounds. The building, 20' X 60' in dimension, is of brick, backed by hollow tile. The view, photographed July 14, 1936, shows exterior of the structure nearly completed., June, 1936 - July, 1936
Project #2443 District 1: Industrial Arts Building, Hawesville, KY. A high school farm shop and home economics building has been erected at Hawesville, KY, through the agency of Project #2443, which was completed November 29, 1936. Completed farm shop and home economics building. View photographed December 23, 1936., December, 1936 - January, 1937
Hardin County
Project #215 District 2: Useful Articles are made in training work centers. WPA Project #215, which operates in Hardin County, provides Training Work Centers at Elizabethtown and Cecelia, where women from relief families are employed to make wearing apparel and other articles. The stock room of the Elizabethtown Training Work Center. Photographed March 20, 1936., March, 1936 - April, 1936
Project #215 District 2: Useful articles are made in Training Work Centers. Children of the WPA Nursery School at Elizabethtown modeling clothes made in the Training Work Center at Elizabethtown on Open House Day at the Center, March 20, 1936., March, 1936 - April, 1936
Project #521 District 6: Project #521 provides for the grading, draining and surfacing the Ridge Spring Road in Hardin County. Ridge Spring Road, showing crushed limestone surface. View photographed September 25, 1936., December, 1936 - January, 1937
Project #1576 District 2: Quarry supplies stone for construction of streets in Elizabethtown, KY. Reconstruction of streets throughout the City of Elizabethtown was made possible by WPA Project #1576. Rock quarry operated as part of the project. Photographed March 4, 1936., March, 1936 - April, 1936
Project #1576 District 2: Quarry supplies stone for construction of streets in Elizabethtown, KY. View of rock crusher where stone is crushed for use on streets of Elizabethtown. Photographed March 4, 1936., March, 1936 - April, 1936
Project #2187, Master Project #2808 District 6: Project #2187 of Master Project #2808 is the grading and draining of the Shepherdsville Road in Hardin County. View shows heavy grading work in progress with use of a small revolving gas shovel and dump trucks. Photograph taken October 7, 1936., September, 1936 - October, 1936
Project #2995 District 6: The construction of a six-room school building with gymnasium and auditorium combined at White Mills, KY. The structure is to be of permanent type, constructed of concrete, stone, steel and brick. View of foundation and frame work of White Mills School, photographed October 29, 1936., November, 1936 - December, 1936
1937 Flood. Clean-up work at West Point, KY. WPA men clearing away debris at West Point, KY. This town was badly damaged by the flood. View photographed February 10, 1937., January, 1937 - February, 1937
Harlan County
Project #596 District 4: Improvement of the county recreational camp for boys at Watts Creek Settlement. Portion of practically completed dam at Boy's Recreation Camp. Photographed January 14, 1936, January, 1936 - February, 1936
Project #827 District 4: Girls Recreational Center, Harlan County. Construction of a County Recreation Center for Girls at Wallins, KY. View, photographed July 21, 1936, shows work in progress on upper pool, from whence water is piped to fill the main swimming pool., July, 1936 - August, 1936
Project #596 District 4: Improvement of the county recreational camp at Watts Creek Settlement, Harlan County, KY. The improvements include repairing stone masonry dam and the construction of a mess hall, a caretaker's cabin, and a recreational hall, all of native materials. View of the reconstructed dam was photographed March 12, 1936., February, 1936 - March, 1936
Henderson County
1937 Flood. A sandbag wall was built by WPA workers around the water plant and the electric light company's pumping station at Henderson, KY. View photographed January 29, 1937., January, 1937 - February, 1937
Project #2372 District 1: Construction of a two-lane concrete pavement on Elm Street, between Eighth and Twelfth streets in Henderson, KY. View was photographed April 7, 1936., February, 1936 - March, 1936
Project #1269 District 1: The construction of a public swimming pool and clubhouse in Atkinson Park in the City of Henderson, KY, will provide this municpality with a popular and healthful recreational facility. A general view of the project, photographed April 3, 1936., February, 1936 - March, 1936
Project #1269 District 1: Close-up view of a part of the public swimming pool and clubhouse project in Atkinson Park in the City of Henderson, KY, showing reinforcing steel and form work for concrete walls. Photographed April 7, 1936., February, 1936 - March, 1936
Projects #2372 and Project #2373 District 1: Projects #2372 and #2373 provide for the construction of a two-drive concrete pavement, with a park in the center, on Elm Street in Henderson, KY. Workmen pouring concrete during construction of a two-drive street with a park in the center. View photographed September 18, 1936., December, 1936 - January, 1937
Hickman County
Project #454 District 1: Workmen are spreading rock base over the existing gravel preparatory to surfacing with a native rock asphalt at Clinton, KY. View was photographed July 21, 1936., July, 1936 - August, 1936
Project #454 District 1: Various streets in the City of Clinton, KY, are being surfaced under Project #454. Asphalt surface of street being rolled. View taken September 29, 1936., September, 1936 - October, 1936
Hopkins County
Project #523 District 1: Re-modeling and improving existing fire station in Madisonville, KY. Extensive renovations in progress at fire station building. Photographed January 14, 1936., January, 1936 - February, 1936
Project #2701 District 1: Installation of 6836 lineal feet of 10-inch cast iron water mains in the City of Madisonville, KY. View, photographed July 24, 1936, shows portion of trench ready for laying pipe., July, 1936 - August, 1936
Project #2686 District 1: Athletic Field Stadium, Madisonville, KY. View, photographed July 24, 1936, shows work in progress on a concrete stadium for the city schools at Madisonville, KY. Forms have been removed from the concrete wall at immediate left of the picture. The stadium, 178 feet long by 42 feet wide, and with a seating capacity of 1000-2000 persons, is being constructed under Project #2686., July, 1936 - August, 1936
Project #2686 District 1: Under Project #2686, a reinforced concrete stadium is being constructed on the city school property at Madisonville, KY. The stadium is 172 feet long and 42 feet wide. Concrete stadium under construction at Madisonville, KY. View photographed September 14, 1936., October, 1936 - November, 1936
Project # 1579 District 1: The construction and installation of concrete storm sewers in various parts of Madisonville, KY, has been completed under Project #1579. View, photographed November 6, 1936, shows reinforced concrete pipe being made for use in storm sewer construction., November, 1936 - December, 1936
Jackson County
Project #2508 District 4: The construction of a gymnasium and auditorium building of native stone at Tyner, KY. Tyner Gymnasium Building ready for roof. Photographed November 16, 1936., November, 1936 - December, 1936
Jefferson County
Project #1988 District 6: WPA workers at State Board of Health offices, Louisville, KY, making a cross-index of diseases and compiling records of births and deaths in Jefferson County., January, 1936 - February, 1936
Project #1988 District 6: WPA worker, a registered nurse, weighing a six-week-old baby brought to a child welfare clinic for its first complete check-up., January, 1936 - February, 1936
Project #205 District 6: Negro Women's Sewing Center. Small Negro girl clothed in garments made in the Negro Women's Training Work Center, Louisville, KY. Photographed February 19, 1936., January, 1936 - February, 1936
Project #205 District 6: Negro Women's Sewing Center. Two Negro children wearing clothes made on this project and serving as models for the clothing on "Open House Day" at the center. Photographed February 19, 1936., January, 1936 - February, 1936
Project #2366 District 6: Construction of sewers in the 8th Ward, City of Louisville, KY. Digging sewer ditch. View shows respective depths of 6 feet, 4 feet, and 3 feet. Photographed January 21, 1936., January, 1936 - February, 1936
Project #250 District 6: Resurfacing of four miles of a route road from Taylorsville Road to Firman Road with bituminous macadam. Rolling rock on Firman Road project. Photographed January 16, 1936, January, 1936 - February, 1936
Project #2546 District 6: A doctor, employed on WPA Project #2546, is shown aiding the State Board of Health in giving 19,108 innoculations for typhoid and diptheria. This is a Public Health Unit project, sponsored by the Louisville Department of Health., February, 1936 - March, 1936
Project #1201 District 6: Utilizing old brick in reconstructed city streets. Spreading cement grout on crushed brick. Photographed February 27, 1936., March, 1936 - April, 1936
Project #1201 District 6: Utilizing old brick in reconstructed city streets. Close-up of man brushing the cement grout off the piece of sheet metal onto the crushed brick. Photographed February 27, 1936., March, 1936 - April, 1936
Project #1201 District 6: Utilizing old brick in reconstructed city streets. Spreading the surface concrete. Photographed February 27, 1936., March, 1936 - April, 1936
Project #1939 District 6: Recreational Activity Program in Louisville, KY. Recreational leaders and workers for the various playgrounds and community centers in the City of Louisville are provided by Project #1939. Group of children at the Oakdale Community Center designing and making doll clothes under the direction of a WPA supervisor., March, 1936 - April, 1936
Project #1939 District 6: Recreational Activity Program in Louisville, KY. Group of mothers from needy families sewing at the Oakdale Center. This class is also under the direction of a WPA supervisor., March, 1936 - April, 1936
Project #724 District 6: Recreational pursuits are also provided by Juvenile Project. Among the provisions of the WPA Project #724 in Louisville, KY, is a survey of sections of the city where delinquency occurs and to conduct in these sections activities designed to reduce and prevent juvenile delinquency. Woodwork training given boys at the Neighborhood House by a WPA worker. Some of the work done by the boys may be seen on the tables., March, 1936 - April, 1936
Project #724 District 6: Recreational pursuits are also provided by Juvenile Project. Two groups of girls in a sewing class on the second floor of the Neighborhood House. WPA supervisors directing the girls are at the far end of each table., March, 1936 - April, 1936
Project #897 District 6: Shawnee Park River Road, Louisville, KY. Construction of a 20-foot, cement bound macadam resurface on the lower River Road in Shawnee Park, Louisville. View shows man completing the northern entrance to Shawnee River Road, shortly prior to pouring the cement grout. Photographed April 28, 1936., April, 1936 - May, 1936
Project #897 District 6: Shawnee Park River Road. This project also includes landscaping and grading river banks. The work covers nearly a mile of river frontage. A completed section of the Shawnee Park River Road, looking southward from foot of Chestnut Street, is shown in this photograph, taken April 28, 1936., April, 1936 - May, 1936
Project #110 District 6: Municipal Yacht Basin, Louisville, KY. Hon. Neville Miller, Mayor of Louisville, spading away dirt to permit water from the Ohio River to fill the City's Harbor for Pleasure Boats. This photograph was taken July 23, 1936., July, 1936 - August, 1936
Project #110 District 6: Municipal Yacht Basin, Louisville, KY. Water from the Ohio River pouring into the recently created Harbor for Pleasure Boats at Louisville., July, 1936 - August, 1936
Project #249 Master Project #2784 District 6: Project #249, a unit of Master Project #2784, provided for the reconstruction of the Mt. Washington Road in Jefferson County. View of workmen widening the road base from 10 feet to 16 feet, photographed October 14, 1936., September, 1936 - October, 1936
Project #249 Master Project #2784 District 6: Project #249, a unit of Master project #2784, provided for the reconstruction of the Mt. Washington Road in Jefferson County. The road after widening and completion of rock shoulders. View photographed November 6, 1935., September, 1936 - October, 1936
1937 Flood. WPA workers repairing a cave-in on the north side of the Louisville Free Public Library. View was photographed February 8, 1937., January, 1937 - February, 1937
Project #249 District 6: Improvement of Mt. Washington Road from Preston Street Road to Cedar Creek Road, a distance of 2.5 miles. Base is being widened from 10 feet to 16 feet and the surface of the road treated with bituminous macadam at 75 pounds to the square yard. Cutting away bank to widen Mt. Washington Road. Photographed November 21, 1936., January, 1936 - [n.d.]
Project #249 District 6: Spreading rock on Mt. Washington Road. Photographed December 9, 1935., January, 1936 - [n.d.]
Project #249 District 6: Mt. Washington Road after widening and resurfacing, ready for black-top. Photographed January 1, 1936., January, 1936 - [n.d.]
Project #897 District 6: Construction of a 20-foot cement bound macadam re-surface on the lower River Road, Shawnee Park, Louisville, KY. Project also provides for landscaping and grading river banks etc. Spreading crushed rock on Shawnee Park River Road. Photographed January 13, 1936., January, 1936 - [n.d.]
Project #481 District 6: Construction of a new Service Building for the University of Louisville. Building will have 13-inch brick walls and constructed with structural steel skeleton. It will house offices, sotre and supply rooms, repair shops and a garage. Starting brick work on new Service Building, University of Louisville. Photographed December 9, 1935., [n.d.] - [n.d.]
Project #481 District 6: Laying up brick walls, University of Louisville Service Building. Photographed January 3, 1936., [n.d.] - [n.d.]
Project #481 District 6: Close-up view of bricklayers at University of Louisville Service Building, showing type of work accomplished with used brick. Photographed January 3, 1936., [n.d.] - [n.d.]
Project #1130 District 6: Relaying 765,000 square feet of sidewalks in City of Louisville, KY. Close-up view of men laying brick for sidewalk on Madison Avenue near 28th Street., [n.d.] - [n.d.]
Project #717 District 6: Construction of Service Building, 35 feet by 70 feet excavation and landscaping of old quarry south of clubhouse, completion of three shelter houses on course, surfacing walks and installation of water line at Seneca Park Golf Course, Louisville, KY. Foundation of a former building utilized in construction of new Seneca Park Caddy House. Photographed November 8, 1935., January, 1936 - [n.d.]
Project #717 District 6: Forms in place for portion of the Caddy House foundation requiring new concrete at Seneca Park Golf Course, Louisville, KY. Photographed November 25, 1935, January, 1936 - [n.d.]
Project #717 District 6: Starting of brick work on Caddy House at Seneca Park Golf Course, Louisville, KY. Photographed December 9, 1935., January, 1936 - [n.d.]
Project #717 District 6: Completion of brick work, ready for roof on Caddy House, Seneca Park Golf Course, Louisville, KY. Photographed January 3, 1936., January, 1936 - [n.d.]
Project #565 -(1) - The Jefferson County unit for compilation of "The American Guide," a Federal Writers' project, which was started October 29, 1935 is nearing completion of its work. Its activities have been the gathering and preparation of material covering the industrial, historical, recreational, cultural and aesthetic resources of Jefferson County. A group of relief workers of the Jefferson County (Louisville) unit of "The American Guide" project, "grinding out" copy. Photographed January 6, 1936., January, 1936 - February, 1936
Project #482 District 6: This project, providing for altering, repairing and equipping for the University of Louisville, a three-story brick dormitory, was started December 12, 1935. The improved structure will serve as an administration, library and classroom building for Negroes of the University. Workmen constructing a stage in Administration Building of Simmons University, the Negro section of the University of Louisville. Photographed February 12, 1936., January, 1936 - February, 1936
Project #482 District 6: Close-up view of a brick-layer at work, back of stage in Administration Building of Simmons University, the Negro section of the University of Louisville. Photographed February 12, 1936., January, 1936 - February, 1936
Project #2690 District 6: A photograph taken March 27, 1936, of the old administration building at Bowman Field Airport, Louisville, KY, showing commencement of excavation on a new addition. This project provides for remodeling and enlarging the present building and making other improvements to the property., February, 1936 - March, 1936
Project #2690 District 6: Improvements to Administration Building at Bowman Field Airport, Louisville, KY. View of the excavation started on a wing of the old building, photographed March 27, 1936., February, 1936 - March, 1936
Project #1921 District 6: State Planning Board Staff. A group of workers on a Federal WPA Project, providing for the staffing of State Planning Boards. The work involves the collection, preparation and tabulation of research materials. The Kentucky unit of this project is located in the City of Louisville, KY., February, 1936 - March, 1936
Project #2489-1 The Federal Music Project. Musicians employed on the Federal Music Project at Louisville, KY, shown copying and arranging public school and folk-song music. The musician in the foreground on the left is working on his own arrangement of a folk-song., February, 1936 - March, 1936
Project #1628 District 6: WPA Project #1628, sponsored by the State Board of Health, Louisville, KY, provides for making a permanent record of communicable diseases. Relief workers assist in making Hollerith card records, showing prevalence of the diseases. These records enable the U.S. Public Health Service to more effectively control the spread of various diseases. View shows girls at the Hollerith card machine., February, 1936 - March, 1936
Project #1201 District 6: Utilizing old brick in reconstructing city streets. WPA Project #1201, which is the reconstruction of brick streets in the 7th Ward of the City of Louisville, includes the removal of 42,493 square yards of old brick streets and cushion, crushing and reusing the old crushed brick as a coarse aggregate in a 4-inch concrete pavement to be laid over the existing concrete base. Compacting and striking off crushed brick before applying cement grout. Photographed February 4, 1936., March, 1936 - April, 1936
Project #1201 District 6: Utilizing old brick in reconstructing city streets. A close-up view of two of the workers compacting the brick, taken February 4, 1936., March, 1936 - April, 1936
Project #2270 District 6: Sewer construction work in the City of Louisville. Construction of the Sixteenth Street sewer lateral for the City of Louisville, KY. Filling and compacting the completed sewer trench. Photograph taken March 5, 1936., March, 1936 - April, 1936
Project #481 District 6: New building on campus of the University of Louisville. Throught provisions of WPA Project #481 a new Service Building for the University of Louisville is being constructed. Workmen installing insulation to steam line at the University Service Building. Photographed March 5, 1936., March, 1936 - April, 1936
Project #250 District 6: Widening and resurfacing the Route and Firman roads in Jefferson County for a distance of 4 miles. The view, photographed April 13, 1936, shows a section of the project where widening has been completed, before spreading of the black top., April, 1936 - May, 1936
Project #2281 District 6: WPA Project #2281 provides for the construction of sewer laterals on Dundee Road and Richmond Drive, City of Louisville, KY. Photograph taken April 13, 1936, shows men excavating trench to a depth of 4.5 feet on Dundee Road., April, 1936 - May, 1936
Project #2690 District 6: The Bowman Field Airport Project. View, photographed April 13, 1936, shows excavation work well under way at Bowman Field Airport, Louisville, KY. This project provides for an addition to the airport's administration building., April, 1936 - May, 1936
Project #482 District 6: Project #482 provides for the altering and repairing of a three-story brick dormitory for use as an administration, library and classroom building for Negroes of the University of Louisville. The photograph, taken April 6, 1936, shows workmen wiring and installing metal lath., April, 1936 - May, 1936
Project #1971 District 6: Federal Art Project at Louisville, KY. General view of entablature and frieze of the Administration Building, University of Louisville, showing an artist painting the University seal on the building. This work was done on the Federal Art Project, #1971, which is being operated at the University, with three relief artists and one non-relief supervisor. View was photographed May 14, 1936., April, 1936 - May, 1936
Project #1971 District 6: Federal Art Project at Louisville, KY. Close-up view of artist varnishing the painted seal on the University of Louisville Administration Building., April, 1936 - May, 1936
Project #1037 District 6: Improvement of Hospital Drive. Re-alignment and repair of the main entrance road to Waverly Hills Sanitarium in Jefferson County. View, photographed May 6, 1936, of the south wing of the entrance, shows concrete surface and grading completed., May, 1936 - June, 1936
Project #2784 District 6: Men placing screened rock on Jefferson Hill Road at its intersection with Keys Ferry Road in Jefferson County. This is one of the Jefferson County roads that is being repaired and improved under Master Project #2784. View was photographed July 9, 1936., June, 1936 - July, 1936
Project #2784 District 6: Firman Road Project, Jefferson County. View, photographed November 11, 1935, showing a curve on the Firman Road being super-elevated and widened on the inside. This work is part of that being undertaken under Master Project #2784, which provides for repairing and improving various roads not in the Federal Highway System in Jefferson County., June, 1936 - July, 1936
Project #2784 District 6: Firman Road Project, Jefferson County. The completed curve on the Firman Road after it was widened and super-elevated. View was photographed July 9, 1936., June, 1936 - July, 1936
Project #2690 District 6: General view of the work on the Administration Building at Bowman Field, Louisville, KY, showing the new wing on the left. This work, which consisted of remodeling and enlarging the Administration Building and changing walks and concrete mat to conform to the remodeled building was provided by Project #2690. Photograph was taken July 9, 1936 from the flying field., June, 1936 - July, 1936
Project #2690 District 6: View, photographed July 9, 1936, of the new right wing of the Bowman Field Administration Building, showing completed brick work., June, 1936 - July, 1936
Project #897 District 6: Construction of a cement-bound resurface on the Lower River Road in Shawnee Park, Louisville, KY. The view, photographed January 13, 1936, shows a portion of the road after crushed rock had been placed on it. View is facing north from the foot of Broadway. Shawnee Park is on the right and the Ohio River is on the left., June, 1936 - July, 1936
Project #897 District 6: A view, photographed July 22, 1936, of the Lower River Road in Shawnee Park, Louisville, KY, after resurfacing was completed., June, 1936 - July, 1936
Project #120 District 6: Children waging a water battle in the wading pool at the Cypress and Algonquin Parkway Playground, Louisville, KY. This 13-acre playground was developed under Project #120. The view was photographed July 22, 1936., July, 1936 - August, 1936
Project #120 District 6: Cypress and Algonquin Parkway Playground, Louisville, KY. View, photographed July 22, 1936 at the newly developed playground at Cypress and Algonquin Parkway shows workmen finishing the brick walks leading to the wading pool., July, 1936 - August, 1936
Project #1065, Master Project #2784 District 6: Brownsboro Road Project, Louisville, KY. View showing men grading and widening a stretch of the Brownsboro Road in Jefferson County was photographed July 29, 1936. Improvement of this road is Project #1065, now consolidated under Master Project #2784., July, 1936 - August, 1936
Project #1065, Master Project #2784 District 6: Brownsboro Road Project, Louisville, KY. This view of a completed portion of Brownsboro Road was photographed July 29, 1936., July, 1936 - August, 1936
Project #275 District 6: Training Work Center, Louisville, KY. Children shown wearing garments made in a Training Work Center in Louisville, KY. The photographe was taken July 29, 1936., July, 1936 - August, 1936
Project #275 District 6: Training Work Center, Louisville, KY. These boys are modeling pajamas and bathrobes made at the Training Work Center. Photograph taken July 29, 1936., July, 1936 - August, 1936
Project #275 District 6: The suit of clothes worn by the boy, pictured in the photograph, was made by women employed on Project #275, the Louisville Training Work Center, which is located at the corner of Shelby and Main Streets. This suit is one of the 19,400 garments made on the Louisville project to date and distributed to needy families. The boy is happy not only because he has a knife to whittle on a block of wood, but he has clothing, both attractive and substantial, to wear to school and for play., August, 1936 - September, 1936
All Dressed Up. Although this child is sitting on a "Surplus Relief Commodity" box, the clothes he has on and hundreds of other pieces of children's clothing have not proved to be a surplus, but rather a great welcomed necessity in many Kentucky homes. To date, 373,218 pieces of children's clothes have been made in the Training Work Centers, including 90,150 children's dresses, 85,899 pieces of infant's clothing, 169,409 pieces of children's underwear and 27,760 sleeping garments. One nursery school teacher reports a doubled enrollment after the receipt of gay-colored sun suits made in the local Training Work Center., August, 1936 - September, 1936
Project #249, Master Project #2784 District 6: The improvement of Mt. Washington Road in Jefferson County. It included widening the base of the road and surfacing with bituminous macadam. Widening the road and preparing the subgrade for receiving base stone. View photographed November 21, 1935., August, 1936 - September, 1936
Project #249, Master Project #2784 District 6: The improvement of Mt. Washington Road in Jefferson County. Workmen spreading the base stone. View photographed December 9, 1935., August, 1936 - September, 1936
Project #249, Master Project #2784 District 6: The improvement of Mt. Washington Road in Jefferson County. Water-bound macadam base completed and the road ready for the wearing surface. View photographed January 7, 1936., August, 1936 - September, 1936
Project #249, Master Project #2784 District 6: The improvement of Mt. Washington Road in Jefferson County. Completed road showing retread surface. View photographed August 28, 1936., August, 1936 - September, 1936
Project #248, Master Project #2784 District 6: Completion of the reconstruction of the Mitchell Hill Road, 2.5 miles in length, in Jefferson County. This is a continuation of a K.E.R.A. project and includes grading, draining and surfacing the road with bituminous macadam over a rock base. Grading the road, widening the curves and sloping the banks for a better view of the curves. View photographed October 16, 1935., August, 1936 - September, 1936
Project #248, Master Project #2784 District 6: Grading has been completed on Mitchell Hill Road and the road is now ready to be surfaced. View photographed October 30, 1935., August, 1936 - September, 1936
Project #248, Master Project #2784 District 6: A section of Mitchell Hill Road at Fairdale, showing men leveling base course prior to water binding. View photographed September 4, 1936., August, 1936 - September, 1936
Project #248, Master Project #2784 District 6: Mitchell Hill Road completed showing retread wearing surface on a water-bound macadam base. The view, photographed September 4, 1936, also shows graded banks, widened roadway and new guard rails in place., August, 1936 - September, 1936
Project #2658, Master Project #2784. Project #2658, providing for the grading, draining and surfacing of Newburg Road, is another unit of the Master Project #2784 in Jefferson County. A distance of 1.71 miles is to be improved. Crushed rock being spread on the road. Photograph taken September 4, 1936., August, 1936 - September, 1936
Project #2658, Master Project #2784 District 6: Powdered stone being spread over crushed rock on Newburg Road, prior to watering and rolling. View photographed September 4, 1936., August, 1936 - September, 1936
Project #1069 District 6: Two recently completed road improvements in Jefferson County were projects #1069 and #897. Project #1069, which is covered by Master Project #2784, provided for the grading, draining and improving 2.35 miles of the Cooper Chapel Road. View of the Cooper Chapel Road in Jefferson County, photographed July 29, 1936., August, 1936 - September, 1936
Project #897 District 6: Two recently completed road improvements in Jefferson County were projects #1069 and #897. Project #897 was for the construction of a 20-foot cement-bound macadam resurface on the Lower River Road, Shawnee Park, Louisville, and for landscaping and grading the river banks. Shawnee Park River Road, facing north from Chestnut Street, Louisville. View photographed July 29, 1936., August, 1936 - September, 1936
Project #3110 District 6: Construction of a central heating plant at Simmons University, a Negro College in Louisville, KY. Workmen making alterations to university building, preparatory to installing a central heating plant. Photograph taken October 1, 1936., September, 1936 - October, 1936
Project #249, Master Project #2784 District 6: Project #249 of Master Project #2784 provided for the reconstruction of the Mt. Washington Road. The completed road, showing retread surface. View taken August 28, 1936., September, 1936 - October, 1936
Project #2690 District 6: Remodeling and enlarging the Administration Building and other improvements at Bowman Field Airport, Louisville, KY. The work also includes changing walks and concrete mat to conform to the remodeled building. Construction of the new wing to the Airport Administration Building shown nearing completion in this view, photographed August 28, 1936., October, 1936 - November, 1936
Project #2690 District 6: Remodeling and enlarging the Administration Building and other improvements at Bowman Field Airport, Louisville, KY. The work also includes changing walks and concrete mat to conform to the remodeled building. Bricklayers at work on the new wing to the Airport Administration Building. View photographed August 28, 1936., October, 1936 - November, 1936
Project #1067, Blanket Project #2784 District 6: Project #1067, covered by Blanket Project #2784, provides for the reconstruction of two miles of the Brownsboro Road in Jefferson County, included reshaping to correct its high crown and correcting its drainage ditches. Men cutting away a dirt and stone wall on the Brownsboro Road to afford a better view down the hill. Photograph taken May 22, 1936., October, 1936 - November, 1936
Project #1067, Blanket Project #2784 District 6: Project #1067, covered by Blanket Project #2784, provides for the reconstruction of two miles of the Brownsboro Road in Jefferson County, including reshaping to correct its high crown and correcting its drainage ditches. View photographed August 29, 1936 of the same site after the road had been widened, graded, drained, and treated with bituminous surfacing., October, 1936 - November, 1936
Project #2981 District 6: General improvements to the Park system in Louisville, KY, are being made under Project #2981. Concrete forms for new curb and gutter on the right side of Eastern Parkway facing Floyd Street. View photographed September 6, 1936., October, 1936 - November, 1936
Project #2981 District 6: General improvements to the Park system in Louisville, Ky, are being made under Project #2981. Men pouring concrete for the new curb and gutter on Eastern Parkway. Photograph taken September 16, 1936, is on the right side of the Parkway facing Floyd Street., October, 1936 - November, 1936
Project #2981 District 6: Completed views of the curb and gutter constructed on Eastern Parkway, Louisville, KY. Right side of Eastern Parkway facing Floyd Street. View photographed October 2, 1936., October, 1936 - November, 1936
Project #2981 District 6: Completed views of the curb and gutter constructed on Eastern Parkway, Louisville, KY. Left side of Eastern Parkway facing Floyd Street. View photographed October 2, 1936., October, 1936 - November, 1936
Project #1037 District 6: The construction of a concrete road on the property of Waverly Hills Sanitorium was completed under Unit #6-56-43 of Master Project #1037. The road extends from the Dixie Highway to the main entrance of the hospital. View shows completed section of front entrance road to the hospital, photographed June 8, 1936., December, 1936 - January, 1937
Project #1036 District 6: Rear entrance road to Waverly Hills. Construction of a concrete rear entrance road to Waverly Hills Sanitarium, a tuberculosis hospital near Louisville, KY, has been completed under Project #1036. View shows the rear entrance of cinder construction to Waverly Hills Sanitarium, before improvement of the road, photographed November 25, 1935., December, 1936 - January, 1937
Project #1036 District 6: Rear entrance road to Waverly Hills.Construction of a concrete rear entrance road to Waverly Hills Sanitarium, a tuberculosis hospital near Louisville, KY, has been completed under Project #1036. The new concrete rear entrance road to Waverly Hills Sanitarium. View photographed June 8, 1936., December, 1936 - January, 1937
Project #1200, Master Project #2945 District 6: Reconstruction of brick streets in the Tenth Ward of the City of Louisville, KY. The old brick is removed, crushed and reused as coarse aggregate in the new concrete pavement. Completed concrete pavement on Dumesnil Street between 15th and 16th streets. View photographed September 4, 1936., December, 1936 - January, 1937
Project #2690 District 6: Construction of an addition to the Administrative Building at Bowman Field Airport, Louisville, KY, is nearing completion under Project #2690. The original structure may be seen at the left of the central part of the enlarged building. View photographed September 22, 1936., December, 1936 - January, 1937
Project #250, Master Project #2784 District 6: Project #250, now a part of Master Project #2784, provided for the reconstruction of 4 miles of the Route Road and the Ferman Road in Jefferson County. View shows construction of a section of the new road necessitated by realignment of the road, photographed October 16, 1935., December, 1936 - January, 1937
Project #250, Master Project #2784 District 6: Project #250, now a part of Master Project #2784, provided for the reconstruction of 4 miles of the Route Road and the Ferman Road in Jefferson County. View shows additional base placed to permit a wider surface prior to application of the wearing surface, photographed November 6, 1935., December, 1936 - January, 1937
Project #250, Master Project #2784 District 6: Project #250, now a part of Master Project #2784, provided for the reconstruction of 4 miles of the Route Road and the Ferman Road in Jefferson County. View showing completed base course just prior to application of wearing surface, photographed April 13, 1936., December, 1936 - January, 1937
Project #250, Master Project #2784 District 6: Project #250, now a part of Master Project #2784, provided for the reconstruction of 4 miles of the Route Road and Ferman Road in Jefferson County. Completed section of the road showing bituminous macadam wearing surface. Photographed August 29, 1936., December, 1936 - January, 1937
Project #250, Master Project #2784 District 6: Project #250, now a part of Master Project #2784, provided for the reconstruction of 4 miles of the Route Road and Ferman Road in Jefferson County. View of another section of the completed road, photographed July 29, 1936., December, 1936 - January, 1937
Project #9901 District 6: Employment of needy musicians to copy music for use in the public schools and to arrange Kentucky folk songs and tunes collected on the Folk Song Project was made possible through State Project #9901. Group of musicians in Louisville, KY, shown copying music for use in the public schools., December, 1936 - January, 1937
1937 Flood. The front entrance of the State WPA Office at Louisville, KY, on February 4, 1937. During the flood period, a temporary State Office was opened and maintained in the Highlands section of the city, which was not flooded., January, 1937 - February, 1937
1937 Flood. Clean-up work in Louisville, KY. WPA workers cleaning up debris from 22nd Street, just north of Broadway. Note the water line on the buildings across the street. View photographed February 8, 1937., January, 1937 - February, 1937
1937 Flood. Clean-up work in Louisville, KY. Cleaning up in the West End of Louisville, the WPA is performing a great job in helping to rehabilitate the flood stricken city. Note the overturned sheds and garages in the background. View photographed February 4, 1937., January, 1937 - February, 1937
1937 Flood. Disposal of dead animals. WPA workers hauling away dead horses, cows, pigs and dogs, drowned just south of Louisville, KY. View photographed February 10, 1937., January, 1937 - February, 1937
1937 Flood. Fire Department assistance. This view, photographed February 9, 1937, shows WPA men helping repair and operate emergency fire alarm systems in Louisville, KY., January, 1937 - February, 1937
1937 Flood. Refugee camp erected by WPA workers. A refugee camp built at Louisville with WPA labor, which will house 1200 Negroes. View photographed February 10, 1937., January, 1937 - February, 1937
1937 Flood. An emergency kitchen operated in conjunction with on emergency hospital at St. Matthews, KY. Volunteer help in this kitchen used government surplus commodities. Photograph taken February 3, 1937. WPA women workers were assigned to similar units as cooks, cleaning women, clerks, etc. in all flooded areas., January, 1937 - February, 1937
1937 Flood. Pontoon Bridge being dismantled. The dismantling of the pontoon bridge on Baxter Avenue in Louisville, KY was done by WPA men. This bridge during the flood afforded many persons the opportunity to get to the Highlands. View photographed February 19, 1937., January, 1937 - February, 1937
1937 Flood. Repair and clean-up work. WPA men cleaning the walks, drives and lawn of the Louisville Free Public Library at Fourth and York streets. View was photographed February 4, 1937., January, 1937 - February, 1937
1937 Flood. Federal WPA Administrator Harry L. Hopkins at a conference of state and local officials in Louisville, KY, on Friday, February 5, 1937, outlined the clean-up, sanitation and repair programs which would be undertaken in Kentucky by the Works Progress Administration. Reports on the flood relief work were given by the Hon. A.B. Chandler, Governor of Kentucky; Louisville Mayor Neville Miller; State WPA Administrator George H. Goodman; A.L. Shaeffer, in charge of the Red Cross disaster work in Kentucky; Dr. A.T. McCormack, Director of the State Board of Health; and Dr. Hugh Rodman Leavell, City of Louisville Health Director. Those from Washington present at the conference besides Mr. Hopkins were Gen. F.X. Markham, Chief of the U.S. Army Engineers; Col. F.C. Harrington, Chief Engineer of the WPA; and Jos. L. Feiser, National Vice President of the American Red Cross. Howard Hunter, Bruce Uthus and George H. Fields, Regional WPA officials also attended the meeting., January, 1937…
Jessamine County
Project #? District 3: Reconstruction of streets and replacement of sewers in the City of Nicholasville, KY. Some of the streets are to be surfaced with rock asphalt. The view, photographed May 25, 1936, shows excavation for sewer replacement., June, 1936 - July, 1936
Project #3212, formerly #833 District 3: The reconstruction of various streets, sidewalks, curbs and gutters in Nicholasville, KY, is Project #833, now consolidated under Master Project #3212. Some of the streets are being surfaced with rock asphalt. Construction of curb and gutter form on Chesnut Street. View photographed July 27, 1936., October, 1936 - November, 1936
Project #402 District 3: Repairing and resurfacing with oil and stone chips several roads in Jessamine County is provided by WPA Project #402, the stone being quarried as part of the project. Quarrying stone for Jessamine County Project photographed February 27, 1936., March, 1936 - April, 1936
Project #3212 District 3: Wearing surface of Nicholasville, KY, streets will be of natural rock asphalt. Rolling the water-bound macadam base of a Nicholasville street is shown in this view, photographed August 5, 1936, October, 1936 - November, 1936
Project #3212 District 3: Wearing surface of Nicholasville, KY, streets will be of natural rock asphalt. In this view, Brown Street is being broomed, preparatory for prime oil treatment. Photograph was taken August 11, 1936., October, 1936 - November, 1936
Johnson County
Project #2719 District 6: A public library building of native stone construction is being erected under Project #2719 on the Public School Square at Paintsville, KY. Library building under construction. Workmen at right are shown laying stone walls. View photographed August 8, 1936., August, 1936 - September, 1936
Project #0-73-9967 State-wide Education Project. Literacy teacher visits mountain home. This family, illiterate before visits by the teacher, is now able to do a little reading and spelling. The mother of the family is the one wearing overalls. The literacy work is part of the state-wide education project., December, 1936 - January, 1937
Kenton County
Project #943 District 3: Workmen are lowering a section of 30-inch reinforced concrete pipe in to sewer ditch, during construction of 1381 feet of relief sewers, to drain southwest section of Ludlow, KY. View was photographed July 8, 1936., July, 1936 - August, 1936
Project #784 District 3: Project #784 provides for the construction of concrete streets and alleys, including curb and gutter and necessary storm sewers in Ludlow, KY. View, photographed July 3, 1936 shows workmen grading aggregate., July, 1936 - August, 1936
Project #1916 District 3: Construction of sanitary sewers which will service various streets in South Fort Mitchell, KY, is the work specified under Project #1916. Sewer pipe will be 8", 10", and 12" in diameter. Sanitary sewers for Thompson and Woodlawn Avenues being installed., December, 1936 - January, 1937
Project #2403 District 3: Men at work widening, grading and straightening the Horsebranch Road in Kenton County. This work is being done under Project #2403, a unit of Master Project #2752, and includes resurfacing with crushed stone. View was photographed July 13, 1936., July, 1936 - August, 1936
Project #604 District 3: Reconstruction of 970 feet of Philadelphia and Fourth Streets in the City of Covington, KY. View, photographed May 27, 1936, shows a section of completed concrete paving., July, 1936 - August, 1936
Project #3191 District 3: Improvement of Elizabeth Street in the City of Erlanger, KY. Workers shown finishing a section of concrete pavement on Elizabeth Street. View photographed November 9, 1936., November, 1936 - December, 1936
Project #2492 District 3: Reconstruction of the Wayman Branch Road in Kenton County is Project #2492, a unit covered by Master Project #2752. Work includes clearing, grading, draining and surfacing the road with crushed stone. Widening and grading work in progress on Wayman Branch Road. View photographed August 17, 1936., December, 1936 - January, 1937
Knott County
Project #587 District 5: Construction of a stone masonry jail building is under way at Hindman, KY. This work was begun under K.E.R.A. program. Workmen laying native stone walls of the jail at Hindman. Photographed February 28, 1936., March, 1936 - April, 1936
Project #587 District 5: Native stone jail building, Hindman, KY. Construction of a jail building at Hindman, KY. The structure is of native stone and reinforced concrete construction. View, photographed May 2, 1936, shows early stage of the work., June, 1936 - July, 1936
Project #587 District 5: Native stone jail building, Hindman, KY. View photographed July 2, 1936, of the jail building in Hindman, KY., June, 1936 - July, 1936
Project #32 District 5: Consolidated School, Sassafras, KY. Construction of a native stone consolidated school building containing 10 classrooms at Sassafras, KY. View, photographed June 30, 1936, shows portion of front elevation of nearly completed building., July, 1936 - August, 1936
Project #32 District 5: Construction of a 12-room school building of native stone at Sassafras, KY. Completed exterior of the massive Yellow Creek School, photographed September 30, 1936., December, 1936 - January, 1937
Knox County
Project #1216 District 4: Completing the construction of Flat Lick Junior High School Building, begun as an F.E.R.A. project. Building will contain 10 rooms and its dimensions are 93' X 128'. Photographed December 12, 1935, January, 1936 - February, 1936
Project #1217 District 4: Construction of a native stone high school building at Artemus, KY. Structure will contain 12 rooms. The photograph was taken June 3, 1936., May, 1936 - June, 1936
Project #1950 District 4: WPA Project #1950 provides for the construction of a gymnasium-auditorium building and the completion of the junior high school building at New Bethel, KY. Photograph was taken June 3, 1936., May, 1936 - June, 1936
Project #239 District 4: Construction of a modern two-room elementary rural school building of native sandstone at Hammond, KY, started October 15, 1935, was recently completed. The new building, which is located on the road fork of Stinking Creek about ten miles from Barbourville, replaces two one-room schools. One of the latter was held in a church house and the other was in a dilapidated fram structural building. Approximately 100 children will attend the new school. View of completed building. Photographed January 30, 1936., January, 1936 - February, 1936
Project #? District 4: City Hall Building at Barbourville, KY. Work was in progress on the second floor of the new city hall and fire department building at Barbourville, KY, at the time the photograph was taken on July 16, 1936. The building is of brick and cut stone construction., June, 1936 - July, 1936
Project #1216 District 4: Ten-room school building in Knox County. Construction of a native sandstone junior high school building at Flat Lick, KY. The front of the new school is shown in the photograph taken July 17, 1936. There are ten classrooms in this building, which is 93' X 128' in dimension., June, 1936 - July, 1936
Project #1216 District 4: Ten-room school building in Knox County. View of rear and side of the new junior high school building at Flat Lick, KY., June, 1936 - July, 1936
Project #1217 District 4: Construction of a twelve-room school building of native stone at Artemus, KY. The building is 144' X 52' in dimension. Partial view of front elevation of the Artemus School Building, with work in progress on second floor. Photograph taken July 24, 1936., August, 1936 - September, 1936
Project #1217 District 4: Construction of a twelve-room school building of native stone at Artemus, KY. The building is 144' x 52' in dimension. View on second floor of the Artemus School Building showing masons laying stone walls. Picture taken July 24, 1936., August, 1936 - September, 1936
Project #3198 District 4: A native stone addition, containing a gymnasium and auditorium to the high school building at Barbourville, KY, is being constructed under Project #3198, a continuation of Project #570. View, photographed July 28, 1936, shows workmen laying stone walls of the building., August, 1936 - September, 1936
Project #2266 District 4: Knox County indexing project. White collar workers cross-indexing the Knox County Court records at Barbourville, KY. View photographed October 14, 1936., October, 1936 - November, 1936
Project #588 District 4: WPA Project #588, construction of a one-story gymnasium and auditorium with basement is a much needed addition to the Knox County Central High School properties in Barbourville, KY. This building, 70' X 100' in dimension, is being constructed of native sandstone. Laying stone walls of basement of the new gymnasium and auditorium at Barbourville. All stone quarried, trimmed and placed by relief workers. Photographed March 5, 1936., March, 1936 - April, 1936
Project #2266 District 4: Polk berry and walnut bark ink, used in 1800, make deciphering county records a difficult task on the Knox County Cross Indexing Project. To date 96,760 index cards have been copied and typed against original records with 10,000 records typed on permanent sheets. Twenty thousand deeds and 3,200 licenses have been checked against original records. This work is being done under Project #2266. View of a page in a deed book, with pencil pointing to a record made March 24, 1801. Photograph taken October 16, 1936., October, 1936 - November, 1936
Larue County
Project #2367 District 2: Grading and draining and surfacing with crushed limestone, a rural road in Larue County, beginning at point 5.5 miles southwest of Hodgenville and extending 3.2 miles to Maxine, KY. Spreading rock from dump truck on a rural road in Larue County. Photographed March 4, 1936., March, 1936 - April, 1936
Project #2367 District 2: Road improvement in Larue County. Grading the rock surface of rural road 5.5 miles southwest of Hodgenville and extending 3.2 miles to Maxine, KY. Photographed March 4, 1936., March, 1936 - April, 1936
Project #2809 District 2: Another view of Tanner-Maxine Road, photographed June 4, 1936. Workmen at left of picture are dressing the bank through the cut shown., June, 1936 - July, 1936
Project #779 District 2: Concrete culvert under construction on the Upton-Magnolia Road in Larue County. View, photographed June 4, 1936, shows workmen laying steel for slab and spading the concrete. This work is covered by Project #779, which provides for reconstruction of 3.2 miles of road., July, 1936 - August, 1936
Laurel County
Project #1033 District 4: Construction of a 12-room elementary school building, recreational field and stadium at London, KY. Trimming native stone at quarry for use in constructing London Graded School Building. Photographed February 19, 1936, January, 1936 - February, 1936
Project #2798 District 4: Project #2798 is the reconstruction of various streets and sidewalks in London, KY. The streets have a napped sandstone base and a limestone top surface and sidewalks are constructed of concrete. Completed concrete sidewalk. View photographed September 25, 1936., December, 1936 - January, 1937
Project #31 District 4: View photographed April 18, 1936, shows a one-room, native stone school building, constructed under Project #31 at Owsley, KY., June, 1936 - July, 1936
Project #377 District 4: The construction of an 8-room consolidated school building at East Bernstadt, KY. View taken December 5, 1936., December, 1936 - January, 1937
Project #236. Constructing 50,580 square feet of concrete sidewalk on various streets in the City of London, KY, became possible through WPA Project #236. Workmen putting the rough finish on concrete sidewalks at London, KY. Photographed February 27, 1936., March, 1936 - April, 1936
Leslie County
Project #103 District 5: Project #103 is the construction of an 18-room native stone school building at Hyden, KY. This is to be a consolidated school with an auditorium. It is located in a remote mountain town. First floor walls of the Hyden School were partly completed in this view photographed October 21, 1936., November, 1936 - December, 1936
Project #201 District 5: Threading a loom is an intricate piece of work each woman learns in weaving cloth in the Training Work Center. The view shows the Center in Leslie County., November, 1936 - December, 1936
Project #103 District 5: Project #103 is for the construction of an 18-room native stone high school building at Hyden, KY. View, photographed July 8, 1936, shows foundation for the new school., December, 1936 - January, 1937
Letcher County
Project #918 District 5: The reconstruction and resurfacing with concrete of five streets in Whitesburg, KY. Completed section of a concrete street. View photographed October 10, 1936., December, 1936 - January, 1937
Project #476 District 6: Construction of a two-story brick and stone annex to the high school building at Jenkins, KY. View of the south and east sides of the partially completed annex to the Jenkins High School Building. View photographed September 18, 1936., August, 1936 - September, 1936
Project #1335 District 5: An addition to Letcher County Courthouse at Whitesburg, KY. Photographed October 7, 1936., September, 1936 - October, 1936
Lincoln County
Project #2788 District 2: View, photographed July 15, 1936, of the Industrial Arts Building under construction on school property at Stanford, KY., shows workmen at right of picture rubbing foundation concrete and those at left laying a brick wall., July, 1936 - August, 1936
Project #2788 District 2: Construction of an Industrial Arts Building on the public school grounds, Stanford, KY. Laying brick walls of the Industrial Arts Building. View photographed July 29, 1936., August, 1936 - September, 1936
Livingston County
Project #861 District 1: New brick-veneer, four-room high and graded school building at Hampton, KY, and the old two-story frame structure it will replace. The new building was constructed under WPA Project #861, which also provides for demolition of the former schoolhouse. View was photographed June 10, 1936., June, 1936 - July, 1936
Project #2687 District 1: Colored School Building, Smithland, KY. Project #2687 is the construction of a brick graded school building for colored children at Smithland, KY. View, photographed July 21, 1936, shows exterior of building nearing completion., July, 1936 - August, 1936
Logan County
Project #3037 District 1: The paving of Breathitt Street in Russellville, KY, with a water-bound macadam base and native rock asphalt surface, and the construction of necessary culverts are provided by Project #3037. A masonry culvert with reinforced concrete slab. View photographed October 20, 1936., November, 1936 - December, 1936
Lyon County
Project #1027 District 1: Laying of 8" sanitary sewer extension from the bank of the Cumberland River to the streets in the City of Kuttawa, KY. This project is a sanitary measure absolutely necessary to the future health of the citizens of Kuttawa. Photographed January 9, 1936, January, 1936 - February, 1936
Madison County
Project #1728 District 4: The construction and operation of a camp for transient WPA workers located near Lake Reba, Richmond, KY. Constructing sleeping quarters at Camp Reba. Photographed February 28, 1936., March, 1936 - April, 1936
Project #1175 District 4: WPA Project #1175 is providing an outdoor amphitheatre on the campus of Eastern Kentucky State Teachers College in Richmond, KY. It will consist of 16 grass terraces with native stone risers, an earth stage and a small pool. Construction of amphitheatre photographed February 28, 1936, March, 1936 - April, 1936
Project #1175 District 4: New Outdoor Amphitheatre for Eastern State Teachers College. Workmen constructing stage of amphitheatre on campus. Photographed February 28, 1936., March, 1936 - April, 1936
Project #85 District 4: Constructing new pavement on campus at Eastern State Teachers College in Richmond, KY. View of a section of the completed pavement. Photographed February 28, 1936., March, 1936 - April, 1936
Magoffin County
State-wide Project #0-85-9980 District 5: Boys of a handicraft class in Magoffin County are repairing and repainting old toys, which after renovation will be given to under-privileged children. This class is a part of the recreation program conducted under State-wide Project #0-85-9980., December, 1936 - January, 1937
Project #931, Master Project #2826 District 5: Project #931 of Master Project #2826 is for the purpose of grading, draining, building stone culverts and surfacing with napped stone Mine Fork Road. View shows power shovel at work on Mine Fork Road taken October 13, 1936., September, 1936 - October, 1936
Mason County
Project #1583 District 3: The dismantling of the present bridge and the construction of a new reinforced concrete bridge and abutments over Limestone Creek in Maysville, KY. View taken November 13, 1936., December, 1936 - January, 1937
Project #9969. State Project #9969 provides clerical help to county public health units to compile data from case and service records, to make a new card index and to take records at free clinics held. Clerical force compiling statistics from health records of the Mason County Public Health Unit at Maysville, KY., December, 1936 - January, 1937
McCracken County
Project #104 District 1: Construction of a concrete swimming pool, 200' long and 100' wide in Noble Park, Paducah, KY. View of far side of pool shows forms in place for concrete wall. Photographed January 22, 1936., January, 1936 - February, 1936
Project #536 District 1: WPA Project #536 provides for the reconstruction of 77,216 square yards of streets with a concrete base and a 1.5 inch black top. The photograph, taken March 20, 1936, shows the primed surface on South Third Street in Paducah, KY., February, 1936 - March, 1936
Project #104 District 1: Work is progressing satisfactorily on WPA Project #104, which is the construction of a concrete swimming pool at Noble Park in the City of Paducah, KY. The view, photographed March 20, 1936, shows the north wall of the pool as poured., February, 1936 - March, 1936
Project #463 District 1: WPA Project #463 provides for the construction of two one-story, four-room school buildings in Paducah, KY, a part of the material being salvaged from an old brick building razed as part of the project. View of the new Littleville School Building, photographed April 9, 1936, shows brick work partially completed., April, 1936 - May, 1936
Project #168 District 1: Front view of recenlty completed two-story brick high school building at Heath, KY. This building, constructed under WPA Project #168, contains 21 classrooms, principal's office, gymnasium and shower and dressing rooms. Photograph was taken May 7, 1936., May, 1936 - June, 1936
Project #1495 District 1: The construction of a clubhouse in connection with the swimming pool at Noble Park in the City of Paducah. The clubhouse is being built of concrete block made as part of the project. On top of the clubhouse will be a sun deck. Noble Park Clubhouse. The swimming pool was made under another WPA project. View photographed August 19, 1936., October, 1936 - November, 1936
Project #68 District 1: The making of 400,000 bricks is part of Project #68, which provides for improvements to the Tilghman School Athletic Field in Paducah, KY, including the construction of a wooden stadium and a brick fence. An old fashioned mud wheel for mixing clay in the manufacture of brick. View photographed August 19, 1936., October, 1936 - November, 1936
Project #9965 District 1: Some future carpenters getting training at Whittier Nursery School in McCracken County., November, 1936 - December, 1936
Project #9978 District 1: The toss-up after a "held ball" during basketball game of Junior College Recreation Group at Paducah, KY., November, 1936 - December, 1936
Project #168 District 1: Under Project #168, a two story brick high school building, 274 feet long by 57 feet wide, was erected at Paducah, KY. This new building, containing 21 classrooms, provides facilities for approximately 400 students. It replaces a four-room structure, totally inadequate for the needs of the community. The Heath School Building, completed May 4, 1936, is one of the most modern school buildings in the entire state. View was photographed December 19, 1936., December, 1936 - January, 1937
Project #536 District 1: The resurfacing of various streets in Paducah, KY. Workmen shown placing blacktop surfacing material on street job in Paducah. View photographed December 19, 1936., December, 1936 - January, 1937
McCreary County
Project #2831 District 2: Native stone school in McCreary County. Construction of a two-room graded school building of native sandstone at Nevelsville, KY. View shows stone work nearing completion. Photographed April 21, 1936., April, 1936 - May, 1936
Project #2831 District 2: Native stone school in McCreary County. View of the old schoolhouse at Nevelsville which will be replaced by the one now under construction., April, 1936 - May, 1936
Project #1171 District 2: WPA Project #1171 is the construction of a two-room graded school building of native sandstone at Clear Creek. The photograph, taken April 7, 1936, shows part of two walls laid with stone., February, 1936 - March, 1936
Project #2746 District 2: A quarry is being operated at White Oak Junction, KY, as part of WPA Project #2746, which provides for improvement and surfacing with rock of certain roads in that county. Crusher at White Oak Junction Quarry, crushing rock for use on McCreary County roads. Photographed March 31, 1936., February, 1936 - March, 1936
Project #1404 District 2: Construction of a concrete swimming pool, 65' X 100', in the public park at Stearns, KY. The photograph, taken April 16, 1936, shows a portion of the excavation for the pool., April, 1936 - May, 1936
Project #1181, Master Project #2831 District 2: A two-room schoolhouse of native sandstone has been constructed at Parkers Lake under WPA Project #2831, formerly Project #1181. View, photographed May 6, 1936, shows completed exterior of the building., May, 1936 - June, 1936
Project #2365 District 2: Gilbreath School. The Gilbreath School near Pine Knott, KY, which is one of six school buildings being constructed in McCreary County under Project #2331. The building contains two rooms and is built of native stone quarried as part of the project. View was photographed June 11, 1936., June, 1936 - July, 1936
Project #2-74-383 District 2: At two-room schoolhouse of native stone construction, known as the Strunk School in McCreary County, has been constructed under Project #2-74-383, which is covered by Master Project #2831. View of the Strunk School Building, photographed August 13, 1936., August, 1936 - September, 1936
Project #1404 District 2: Construction of a log recreational building with stone masonry foundation, the construction of a concrete swimming pool and other improvements for a public park at Stearns, KY. The community building, showing log construction of the main floor. View photographed June 11, 1936., October, 1936 - November, 1936
Project #1404 District 2: Construction of a log recreational building with stone masonry foundation, the construction of a concrete swimming pool and other improvements for a public park at Stearns, KY. A later view of the community building, showing men placing shingle roof. Photograph taken July 29, 1936., October, 1936 - November, 1936
Project #1404 District 2: The community building in the public park at Stearns, KY, showing the structure near completion. Photograph taken September 23, 1936. The community building showing a small portion of the swimming pool. This view faces east., October, 1936 - November, 1936
Project #1404 District 2: The community building in the public park at Stearns, KY, showing the structure near completion. Photograph taken September 23, 1936. View facing the community building in a westerly direction., October, 1936 - November, 1936
Project #1404 District 2: Construction of a swimming pool, recreational building and other park improvements at Stearns, KY. The completed swimming pool and recreational building at Stearns Park. View photographed January 1, 1937., December, 1936 - January, 1937
Menifee County
Project #3111 District 4: Project #3111 is the construction of 1300 lineal feet of 30-foot concrete pavement with curb and gutter on Main and Court Streets in Frenchburg, KY. Concrete curb and street under construction in Owingsville. Photograph taken November 6, 1936., November, 1936 - December, 1936
Mercer County
Project #48 District 2: Construction of a concrete bridge and the reconstruction of Forsyth Mill Road in Mercer County. The new bridge will replace an old wooden type bridge. View shows workers making out an approach to new bridge under construction. Photograph taken June 1, 1936., June, 1936 - July, 1936
Project #? District 2: View, photographed March 12, 1936, shows construction of the Kirkwood Bridge nearing completion. The new span, situated in the northwest section of Mercer County, replaces an old wooden covered bridge, which was in bad repair. Construction is of reinforced concrete., February, 1936 - March, 1936
Project #48 District 2: Construction of a three-span steel bridge over Salt River on the Forsyth Mill Road in Mercer County, and the reconstruction of this road from Salt River to Highway #35 are provided by Project #48. Forsyth Mill Road Bridge under construction. View photographed July 20, 1936., August, 1936 - September, 1936
Crew #10, Master Project #2748 District 2: Crew #10 of Master Project #2748 has the task of widening and straightening 1.9 miles of Curry Pike in Mercer County. Repairing of drainage structures is also included. View taken October 9, 1936 shows a small power shovel loading earth., September, 1936 - October, 1936
Project #19 District 2: Cover picture. On the front of this issue of the Monthly Narrative Report appears a photograph of the completed Kirkwood Bridge in Mercer County. This reinforced concrete structure was erected under Project #19. It replaces a condemned wooded covered bridge and provides an outlet for approximately 100 persons. The work of wrecking and salvaging the old Kirkwood Bridge and the repair and improvement of approximately five miles of the Kirkwood Pike, leading to the bridge, were accomplished by Project #2619, later consolidated under Master Project #2748., November, 1936 - December, 1936
Project #2748 District 2: Under Serial Number 2-84-55, Crew #15 of Master Road Project #2748 constructed the Forsythe Mill Bridge in Mercer County. This bridge is of steel and concrete construction. View photographed December 29, 1936., December, 1936 - January, 1937
Project #19 District 2: A reinforced concrete bridge was constructed on the Kirkwood Pike in the northwest section of Mercer County. This bridge replaces an old wooden covered bridge in need of repair. The completed Kirkwood Bridge. View photographed April 22, 1936., December, 1936 - January, 1937
Metcalfe County
Project #543 District 2: Tractor and grader in operation during grading of 4 miles of road, beginning at Cave Ridge and extending to Echo by way of Liberty Church in Metcalfe County. This project also provides for draining and surfacing the road with gravel. Photograph was taken on June 5, 1936., June, 1936 - July, 1936
Project #387 District 2: Construction of a building to house the gymnasium and auditorium of Edmonton High and Graded School, Edmonton, KY. View, photographed April 7, 1936, shows workmen cutting stone for foundation walls., April, 1936 - May, 1936
Project #387 District 2: Concrete foundation of the gymnasium-auditorium building for the high and graded school at Edmonton, KY, shown in photograph taken June 2, 1936. This structure will be 84'-8" X 52'-2" in dimension and of brick construction. It is being built under project #387., June, 1936 - July, 1936
Project #387 District 2: Laying first flooring of the gymnasium-auditorium building of the Edmonton School, which is immediately adjacent to the new structure., June, 1936 - July, 1936
Monroe County
Project #789 District 2: Laying flooring of the new consolidated graded and high school building at Gamaliel, KY. The building containing eight classrooms will be of brick construction and 200 feet by 69 feet in dimension. Brick was manufactured on WPA Project #20 at Gamaliel. Photographed April 4, 1936., February, 1936 - March, 1936
Project #2810 District 2: A concrete culvert under construction on the road from White Oak Ridge to Deep Ford Creek in Monroe County. This project provides for the reconstruction of the road. View photographed June 10, 1936., June, 1936 - July, 1936
Project #789 District 2: Construction of a brick school building at Gamaliel, KY. The structure will be 200 feet long and 69 feet, 8 inches wide and contain eight classrooms. View was photographed May 7, 1936, from front interior of the first floor facing a side wall of the building., May, 1936 - June, 1936
Project #789 District 2: The Gamaliel School Project. An exterior view of the front of the Gamaliel School Building, showing first floor walls partially completed., May, 1936 - June, 1936
Project #789 District 2: The Gamaliel School Project. A rear exterior view of the Gamaliel School Building, showing light facilities for basement, provided by ample sized windows., May, 1936 - June, 1936
Project #1697 District 2: Project #1697 is the construction of an office building at Tompkinsville, KY, to be used by the county school board, the county agricultural agent and the county health unit. View, photographed May 7, 1936, shows the concrete brick walls of the building partially completed., June, 1936 - July, 1936
Project #1697 District 2: Public Office Building, Tompkinsville, KY. A later view of the public office building, photographed June 25, 1936, showing walls completed and building ready to receive roofing., June, 1936 - July, 1936
Project #1697 District 2: Project #1697 is the construction at Tompkinsville of an office building to contain the offices of the county school superintendent, truant officer and county board of education. View, photographed December 31, 1936, of completed office building for county school superintendent and county board of education., December, 1936 - January, 1937
Project #789 District 2: Project #789 was the construction of a high school building at Gamaliel, KY. The structure is 200 feet long and 70 feet wide. It contains eight class rooms. View showing school building near completion photographed September 10, 1936., December, 1936 - January, 1937
Montgomery County
Project #575 District 4: WPA Project #575 provides for the construction of an athletic stadium in Mt. Sterling, KY. The structure of concrete construction with cypress seats will have a seating capacity of 576 persons. View shows workmen installing cypress seats. Photographed May 26, 1936., May, 1936 - June, 1936
Project #2864, Master Project #3201 District 4: The repair and improvement of various roads in Montgomery County are embraced in Project #2864, a unit of Master Project #3201. Rolling the retread surface on Spencer Road. View photographed July 30, 1936., October, 1936 - November, 1936
Project #2864, Master Project #3201 District 4: The repair and improvement of various roads in Montgomery County are embraced in Project #2864, a unit of Master Project #3201. Another view of Spencer Road, photographed July 31, 1936 showing retread work., October, 1936 - November, 1936
Morgan County
Project #2376 District 5: This month's cover picture is of the renovated Courthouse in West Liberty, KY. The work was accomplished under WPA Project #2376 included repairing the concrete block building by applying an outside coat of cement stucco; replacing the old wood floors with concrete floors; plastering, ceiling, wiring and painting the interior and painting and repairing the roof. The improvements made to the Courthouse provide Morgan County with a good building, which in many respects is superior to the structure when it was originally erected., September, 1936 - October, 1936
Project #496 District 5: A native stone school in Morgan County. Construction of a native stone school building at West Liberty, KY. This building, 108' X 156' in dimension, is constructed of squared stone masonry. It has two stories and a basement. Project was started under K.E.R.A. Front view of the West Liberty School, showing squared stone masonry. Photograph taken October 5, 1936., October, 1936 - November, 1936
Project #496 District 5: A native stone school in Morgan County. Construction of a native stone school building at West Liberty, KY. This building, 108' X 156' in dimension, is constructed of squared stone masonry. It has two stories and a basement. Project was started under K.E.R.A. The West Liberty School viewed from the rear. View photographed October 5, 1936., October, 1936 - November, 1936
Muhlenberg County
Project #1384 District 1: Construction of a Health Building, housing an auditorium, a gymnasium and four classrooms, on the high school grounds at Greenville, KY. This structure will be one-story high and constructed of brick. View, photographed March 30, 1936, shows foundation walls practically completed., February, 1936 - March, 1936
Project #1384 District 1: WPA Project #1384 is the construction of a health building on the campus of Greenville High School, Greenville, KY. Construction will be of brick, backed by hollow tile and with cast stone trim. It will contain 4 classrooms, a gymnasium, dressing rooms, showers and toilets. View, photographed March 30, 1936, shows foundation walls practically completed., May, 1936 - June, 1936
Project #2289 District 1: Project #2289 is the construction of a fire proof city hospital at Greenville, KY. View, photographed November 5, 1936, shows Greenville Hospital ready for roof., November, 1936 - December, 1936
Project #3104 District 1: Training Work Center. Each woman in the Training Work Center learns to cut each of the garments she sews. This view is of the sewing room in Muhlenberg County., November, 1936 - December, 1936
Project #2289 District 1: Project #2289 is the construction of a city hospital at Greenville, KY. This town is situated in the heart of western Kentucky coal fields and the nearest modern hospital is 100 miles distant. View, photographed December 16, 1936, of Greenville Hospital nearing completion., December, 1936 - January, 1937
Project #2312 District 1: Construction of a swimming pool, bath houses and tennis courts in a park at Central City, KY. View shows form work for the reinforced concrete walls of the swimming pool, photographed September 25, 1936., December, 1936 - January, 1937
Nelson County
Project #1059 District 2: Reconstruction and repair of various streets in Bardstown, KY. Water bound base completed and ready for asphalt surfacing., December, 1936 - January, 1937
Project #117 District 2: Improvement of farm-to-market roads. Grading, draining and surfacing 0.5 miles of road beginning 0.25 miles northeast of Bloomfield and extending to Bloomfield-Fairfield Road. Portable crusher at work crushing stone for surfacing the road. Photographed December 20, 1936., January, 1937 - February, 1937
Nicholas County
Project #548 District 3: WPA Project #548 consists of grading and draining 4.23 acres outside of the City of Carlisle, KY, for use as a playground and athletic field. Grading athletic field at Carlisle. Photographed February 24, 1936., March, 1936 - April, 1936
Ohio County
Project #1088 District 1: Construction of a two-story City Hall building for the City of Hartford, was made possible by WPA Project #1088. The photograph of the nearly completed building was taken April 8, 1936., February, 1936 - March, 1936
Project #1088 District 1: Construction of a brick and tile City Hall building at Hartford, KY. This structure will contain a community auditorium and a city court room and offices. A one-story annex will house the city fire equipment, with the City Jail in the rear. View of the nearly completed project was photographed April 23, 1936., April, 1936 - May, 1936
Project #1088 District 1: Project #1088, in the City of Hartford, KY, is the construction of a brick and tile city hall building, including an annex to house fire equipment and with a city jail in the rear of the annex. The main building will contain a community auditorium, a courtroom and offices. Hartford's City Hall nearing completion. Photograph taken August 3, 1936., October, 1936 - November, 1936
Project #1088 District 1: Hartford City Hall Completed. The construction of a two-story city building and fire station annex at Hartford, KY, was completed December 16, 1936. View photographed December 16, 1936., December, 1936 - January, 1937
Oldham County
Project #1665 District 3: The Sewing Projects for Women. Two women of the Oldham County Training Work Center at LaGrange shown making garments. Children's clothing made on this project is displayed on the wall., April, 1936 - May, 1936
Owsley County
Project #549 District 4: Cow Creek Bridge. Construction of a bridge near the mouth of Cow Creek, approximately 2.5 miles southeast of Booneville, KY. The project will be about 100 feet long and 18 feet wide, with stone masonry abutments and pier, and white oak stringer, flooring, etc. View shows workmen putting steel trestles in place for new bridge. Photographed May 13, 1936., May, 1936 - June, 1936
Project #2323 District 4: The establishment and operation of a pack horse library in Owsley County, District 4, is Project #2323. Four pack horse librarians in this county rode 564 miles last month with saddle bags filled with books and magazines, which were distributed in rural and isolated sections of the county. The books and magazines are later collected in a similar manner for redistribution. A Pack Horse Librarian returning over the mountain side for a new supply of books. View photographed October 15, 1936., October, 1936 - November, 1936
Pendleton County
Project #2515, Master Project #2822 District 2: Bishop Ridge Road. Construction of a small bridge on the Bishop Ridge Road in Pendleton County shown in photograph taken July 9, 1936. This road, which serves a large number of farms and homes is being reconstructed under former Project #2515, now a unit of Master Project #2822., July, 1936 - August, 1936
Project #1418, Master Project #2822 District 2: Workmen widening and grading the Straight Shoot Road, another Pendleton County road reconstruction job operated under Master Project #2822. The photograph was taken July 9, 1936., July, 1936 - August, 1936
Project #2822 District 3: Master Project #2822 provides for the reconstruction of several roads in Pendleton County. A four-span reinforced concrete bridge under construction. View photographed September 22, 1936., September, 1936 - October, 1936
Perry County
Project #2252 District 5: Extension of Water System, Hazard, KY. This project #2252 is for the purpose of completing the wate system in Hazard, KY, by installing additional water mains. The view, photographed June 1, 1936, shows a 4-inch water main laid in a trench, 3 feet deep and 2 feet wide. Excavation was almost entirely in solid rock., June, 1936 - July, 1936
Project #734 District 5: Construction of an 8 classroom school building with gymnasium and auditorium combined near Ary, KY. View, photographed June 23, 1936, facing from the west side of the building site, shows workmen cutting native sandstone used in construction of the building., July, 1936 - August, 1936
Project #734 District 5: Ary, KY, School Building construction showing a section of the foundation, facing from the south side of the building site., July, 1936 - August, 1936
Project #1575 District 5: Construction of an eight-room brick school building for colored pupils at Hazard, KY. Completed exterior of the Hazard School for colored pupils. View photographed September 22, 1936., December, 1936 - January, 1937
Pike County
Project #79 District 5: Construction of an 8-room elementary school building at Shelbiana, KY. The walls are native stone. View was photographed December 14, 1936., December, 1936 - January, 1937
Powell County
Project #432 District 4: Grading, draining and surfacing the Little Hardwick's Creek Road in Powell County. The view, photographed July 14, 1936, shows grading work in progress., June, 1936 - July, 1936
Pulaski County
Project #766 District 2: WPA Project #766 provides for the reconstruction of Jacksboro Street in the City of Luretha, KY, including installation of concrete curb and gutter. View shows a section of the new curb and gutter. Photographed March 16, 1936., February, 1936 - March, 1936
Project #2750 District 2: Grading, draining and surfacing the Crab Orchard-Ocala Road is part of WPA Project #2750 which provides for the reconstruction of 150 miles of roads. View shows completed section of the road. Photographed April 10, 1936, April, 1936 - May, 1936
Project #412 District 2: WPA Project #412 includes the grading, draining and resurfacing with crushed stone, the Oil Center Road in Pulaski County. View shows workmen at foot of the hill levelling shoulders and completing drainage. Photographed April 15, 1936., April, 1936 - May, 1936
Project #2243, Master Project #2750 District 2: The repairing and improving of various rural roads in Pulaski County, are provided by Master Project #2750. Project #2243, for reconstruction of the Ruth-Buck Creek Road, is a unit of #2750. The Ruth-Buck Creek Road, which has been graded, drained and surfaced with crushed limestone. View photographed August 14, 1936., December, 1936 - January, 1937
Master Project #2750 District 2: Another unit of Master Project #2750 is the reconstruction of Parker's Mill Road. Parker's Mill Road, also graded, drained and surfaced with crushed limestone. View photographed September 21, 1936., December, 1936 - January, 1937
Project #1577 District 2: Photograph taken April 7, 1936 of a quarry in Pulaski County from which stone for use on WPA Project #1577 is obtained. This project provides for reconstruction of a road from Somerset to Dabney in Pulaski County, and also includes construction of a two-span reinforced concrete bridge. The quarry is operated as part of the project., February, 1936 - March, 1936
Project #412 District 2: Improvement of a road, beginning at West Somerset and extending to Oil Center in Pulaski County is provided by Project #412. The erection of a bridge is also included. False work being set for the erection of a multiple span bridge. This view photographed October 5, 1936., September, 1936 - October, 1936
Project #261 District 2: The Pulaski County Training Work Center was one of the many centers which produced clothing for flood sufferers., December, 1936 - January, 1937
Rockcastle County
Project #2672 District 4: Construction of a reservoir at Mt. Vernon, KY, by building an earth dam across Renfro Creek. Dam will have a concrete core wall and riprap water slope. View showing dam for reservoir and concrete core wall partially completed, photographed December 15, 1936., December, 1936 - January, 1937
Russell County
Project #95 District 2: Grading, draining and surfacing with crushed limestone for a distance of 5 miles, the Sewellton-Olga Road in Russell County. View shows rock surface on road. Photographed April 16, 1936., April, 1936 - May, 1936
Project #778 District 2: Reconstruction of Fonthill-Wolfe Creek Road in Russell County is Project #778, now consolidated under Master Project #3313. Stone masonry culvert under construction on Fonthill-Wolfe Creek Road. View photographed April 16, 1936, shows sidewalls nearing completion., December, 1936 - January, 1937
Shelby County
Project #1935 District 6: The widening and resurfacing with rock asphalt of Clay and Washington streets in the City of Shelbyville, KY, and the reconstruction of 21,000 feet of curb and gutter are provided by project #1935. View shows workmen widening street. Photographed June 4, 1936., May, 1936 - June, 1936
Project #1622 District 6: WPA Project #1622 provides for grading, draining, and surfacing the Scott's Station Road in Shelby County. Workmen are shown dressing shoulders and banks in the photograph, taken March 25, 1936., February, 1936 - March, 1936
Simpson County
Project #2446 District 6: The construction of a new library and auditorium building for the city of Franklin, KY. This building, of brick and tile construction, has a seating capacity of 800. View shows library and auditorium nearing completion, photographed January 7, 1937., December, 1936 - January, 1937
Project #2446 District 6: The construction of a brick and tile building, which will serve as a municipal library and auditorium at Franklin, KY. Front view of municipal library and auditorium. Photograph taken September, 1936., December, 1936 - January, 1937
Project #2446 District 6: The construciton of a brick and tile building which will serve as a municipal library and auditorium at Franklin, KY. Interior view of the auditorium-library showing steel framing. Photograph taken September 25, 1936., December, 1936 - January, 1937
Spencer County
Project #1163 District 3: Installation of an 8-inch sanitary sewer system in the City of Taylorsville, KY. View photographed March 26, 1936, shows workmen refilling trench after installation of sewer pipe., February, 1936 - March, 1936
Taylor County
Project #1965 District 2: Construction of stadium, Campbellsville, KY. View, photographed June 11, 1936, shows partially completed stone basement walls of the stadium being constructed under Project #1965 for the graded and high school at Campbellsville, KY. Construction will be of native stone and concrete., July, 1936 - August, 1936
Project #22, Master Project #2834 District 2: Project #22, a unit of Master Road Project #2834, is the grading, draining and surfacing with crushed stone 1.9 miles of Saloma Road in Taylor County. A typical traveling rock crusher shown crushing limestone of surfacing Saloma Road. View photographed October 1, 1936., September, 1936 - October, 1936
Todd County
Project #9962 District 1: Blue and Gray State Park Project. Construction of transient camp at Blue and Gray State Park in Elkton, KY. Transients at the camp are employed to make improvements in the park. Scene photographed April 15, 1936, shows the entrance gate to the park and panorama of the camp buildings constructed on the project., April, 1936 - May, 1936
Project #1801 District 1: General construction, development, maintenance and operation of Blue and Gray State Park at Elkton, KY, is provided by Project #1801, formerly Project #9962. Operation of this project was transferred August 2, 1936 to the National Park Service. Landscaping grounds of Blue and Gray State Park. The camp buildings, to house unattached workers, were constructed on this project. View photographed July 27, 1936., August, 1936 - September, 1936
Trigg County
Project #577 District 1: Construction of a concrete block high school building at Linton, KY. Structure contains four classrooms and office and a gymnasium. View photographed May 6, 1936, shows exterior of building completed., May, 1936 - June, 1936
Trimble County
Project #234 District 3: The Sewing Projects for Women. Busily and contentedly engaged at her sewing is this woman employed on the Training Work Center at Bedford, KY., April, 1936 - May, 1936
Union County
Project #1479 District 1: The grading, draining and surfacing of 5 miles of the Easton-Lyonia Road in Hancock County and of 6.9 miles of the Humphrey-McFall Road in Union County are provided respectively by project #2685 (now included under Master Project "2732) and by Project #1479 (now included under Master Project #2740). View of the work on these two road construction jobs are shown. Grading and draining the Humphrey-McFall Road in Union County. View photographed July 29, 1936., August, 1936 - September, 1936
Warren County
Project #804 District 6: WPA Project #804 is the construction of 15,442 square yards of streets in the City of Bowling Green, KY. The view, photographed May 27, 1936, shows a completed street with native rock asphalt surface., June, 1936 - July, 1936
Project #804 District 6: Project #804 is for surfacing various streets in Bowling Green, KY. Workmen placing and spreading native rock asphalt on a street in Bowling Green. View photographed September 25, 1936., September, 1936 - October, 1936
Project #804 District 6: Project #804 is for constructing 15,442 square yards of streets with curb and gutter in Bowling Green, KY. These streets are to be surfaced with bituminous retread base and native rock asphalt topping. View shows completed asphalt surface on Eleventh Street, photographed January 7, 1937., December, 1936 - January, 1937
Washington County
Project #1115 District 2: Construction of an auditorium-gymnasium building for the graded and high school at Mackville, KY. Photograph, taken April 27, 1936, from the interior of building shows workmen laying concrete brick walls., April, 1936 - May, 1936
Project #1115 District 2: Construction of a concrete brick auditorium-gymnasium building for the graded and high school at Mackville, KY. View showing gymnasium nearing completion, photographed June 26, 1936. Workmen are grading the grounds., December, 1936 - January, 1937
Wayne County
Project #2365 District 2: Construction of a municipal building, housing the city hall, fire station, and city jail in the City of Monticello, KY. The building is being constructed of native stone, quarried as part of the project. The view shows workmen laying the stone walls. Photographed March 25, 1936., February, 1936 - March, 1936
Project #212 District 2: Women on sewing project taught useful home crafts. Women employed at the Training Work Center at Murl, KY, are learning to weave spreads, rugs, etc.during their training hour., April, 1936 - May, 1936
Project #2365 District 2: Municipal Building. Construction of a municipal building which will house the city hall, jail and fire station at Monticello, KY. The building, of native stone, concrete and steel construction, is 33' X 63' in dimension., June, 1936 - July, 1936
Webster County
Project #274 District 4: Cover picture. Webster County Training Work Center at Providence, KY., December, 1936 - January, 1937
Whitley County
Project #573 District 4: A 26-room lodge of stone and log construction at Cumberland Falls State Park in Whitley County was constructed under Project #573. This structure is a valuable addition to the lodging facilities at the park. The completed lodge at Cumberland Falls State Park. View photographed October 14, 1936., October, 1936 - November, 1936
Wolfe County
Project #563 District 4: Project #563 provides for grading, draining and surfacing the Holly Road in Wolfe County. View, photographed July 15, 1936, shows men doing grading work on the road., June, 1936 - July, 1936
Project #583 District 4: A native stone school in Wolfe County. Construction of a native stone school building, one story high, at Hazel Green, KY. The structure contains four classrooms, a cloakroom, and an office. Front view of nearly completed Hazel Green School, photographed October 1, 1936., October, 1936 - November, 1936
Project #583 District 4: Through the agency of Project #583, a county school building, of native stone construction, has been built at Hazel Green in Wolfe County. This structure, one story high, contains four classrooms, cloakroom and an office. Hazel Green School Building nearing completion. View photographed November 11, 1936., November, 1936 - December, 1936
Project #583. WPA Project #583 provides for the construction of a native stone county school building at Hazel Green, KY. This structure will have four classrooms, a cloak room and an office. Quarrying and preparation of the stone is included as part of the project. Workmen cutting the stone to be used in construction of Hazel Green School. Note use of goggles as a safety measure. Photographed February 27, 1936., March, 1936 - April, 1936
Project #583. Native stone used in construction of Hazel Green School. Another view of workmen preparing stone for construction of the Hazel Green School. Quarry may be seen in this picture. Photographed February 27, 1936., March, 1936 - April, 1936
Woodford County
Project #2459 District 3: Master Project #2459 provides for repairing and improving various roads in Woodford County. Work will consist of shouldering, ditching and surfacing three roads with light and heavy retread, consisting of stone and asphalt cutback. Workers are shown ditching and shouldering the Leestown Pike near Midway, KY, in this photograph taken July 21, 1936., October, 1936 - November, 1936
Project #2459 District 3: Master Project #2459 provides for repairing and improving various roads in Woodford County. Work will consist of shouldering, ditching and surfacing three roads with light and heavy retread, consisting of stone and asphalt cutback. Pisgah Road, showing completed bituminous surfacing, shouldering and ditching. View photographed August 5, 1936., October, 1936 - November, 1936
UK Libraries Special Collections Research Center is open Monday to Friday, 9:00am to 4:00pm. Appointments are encouraged but not required. Schedule an appointment here.
Researchers must have an SCRC Researcher Account to request materials. View account set-up and use instructions here.
Questions? Contact SCRC via our Contact Form.
Table of Contents
You may come across language in UK Libraries Special Collections Research Center collections and online resources that you find harmful or offensive. SCRC collects materials from different cultures and time periods to preserve and make available the historical record. These materials document the time period when they were created and the view of their creator. As a result, some may demonstrate racist and offensive views that do not reflect the values of UK Libraries.
If you find description with problematic language that you think SCRC should review, please contact us at SCRC@uky.edu.
UK Libraries Special Collections Research Center is open Monday to Friday, 9:00am to 4:00pm. Appointments are encouraged but not required. Schedule an appointment here.
Researchers must have an SCRC Researcher Account to request materials. View account set-up and use instructions here.
Questions? Contact SCRC via our Contact Form.
Requests
No items have been requested.
You may come across language in UK Libraries Special Collections Research Center collections and online resources that you find harmful or offensive. SCRC collects materials from different cultures and time periods to preserve and make available the historical record. These materials document the time period when they were created and the view of their creator. As a result, some may demonstrate racist and offensive views that do not reflect the values of UK Libraries.
If you find description with problematic language that you think SCRC should review, please contact us at SCRC@uky.edu.